HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - CORRESPONDENCE - CITY STAFF (4)Steve Olt - comments on Harmony Tech Park Page 1
From: Kathleen Reavis
To:"amilewski@bhadesign.com"@FC1.GWIA
Date: Thu, Nov 30, 2000 9:53 AM
Subject: comments on Harmony Tech Park
Angie,
Here's a list of my comments on the latest round of plans for the Harmony Tech Park project. Please let
/ me know your thoughts on these. Thanks.
✓ 1. My prior site plan comments have not been addressed regarding pedestrian walkways (removing a few
drive aisle crossings in order to get a more continuous ped system), providing a; ped xing on Harmony
Tech Parkway to access Celestica, and providing bicycle parking at the buildind'entrances. Please revise
the site plan or let me know why these comments cannot be made.
/2. Its ok for the sidewalk to be built on the west side of Cambridge initially and the sidewalk on the east
side can be built as part of future development.
3. 1 need more details on the intersection design for Harmony/Cambridge pertaining to the ped xings on
Cambridge and on Harmony as well as the bikelane design. The median noses need to be designed to
serve as ped refuge areas on both Cambridge and on Harmony (minimum width 6). Also need to see a
design for the interim 3/4 movement intersection, not just the ultimate full movement intersection.
Thanks again.
KR
Kathleen Reavis
Senior Transportation Planner
City of Fort Collins Transportation Planning Office
phone (970) 224-6140
fax (970) 221-6239
e-mail: kreavis@ci.fort-col[ins.co.us
CC: Marc Virata, Mark Jackson, Steve Olt