Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - CORRESPONDENCE - REVISIONS (7)January 19, 2001 Mr. Stephen Olt Page 4 of 4 I hope this letter adequately addresses the comments that are relevant to the utility construction drawings for this project. If you have any questions please feel free to contact me at your convenience. Sincerely, JR Engineering, LLC John E. Tufte, P.E. Project Engineer JET/bd X:\3920000.all\3926500\Correspndence\John E Tufte\Review Response Letter (Steve Olt)#Ldoc W January 19, 2001 Mr. Stephen Olt Page 3 of 4 22. Additional right-of-way has been granted for a portion of Melody Road (Cambridge Avenue) that will allow for construction of utilities along the east side of the street. 23. A Public Access Easement has been added to the plat for the new sidewalk along the south side of Harmony Road. 24. I believe all of the pedestrian refuges required have been addressed in the plan set. 25. Additional design information has been added to the streets and intersections within the utility plans. 26. This comment has been noted. 27. I believe we have corrected the inconsistencies between the plans for this development. 28. The required letters of intent for the off -site easements are included with this letter. If additional letters of intent are required they will be acquired prior to the public hearing. 30. Directional handicap ramps have been used within the plans for this project to meet ADA requirements. 31. This submittal is substantially more than the previous submittal. We have included a SWMM model and I hope the phasing has been adequately addressed for this submittal. Regarding off -site assumptions, this project is providing storm drain service to Celestica. The property to the south of Celestica and west of Technology Parkway will continue to be farmed and will drain to the existing waste ditches south of this project. I hope the information provided will allow this project to stay on course with respect to the schedule. 32. The plans for the storm drain outfall to F.C.R.I.D. and the sanitary sewer to the South Fort Collins Sanitation District have been included with the Harmony Road and Melody Road (Cambridge Avenue) set of plans. As mentioned, these improvements will be constructed on a first come basis. 33. The improvements east of Melody Road (Cambridge Avenue) will be constructed as the property is developed. Currently TST, Inc. is working on various developments east of this street. 37. The design of the intersection of Harmony Road and Melody Road (Cambridge Avenue) has been included in this plan set, interim and ultimate. 38. Pedestrian refuges have been provided where deemed necessary and are a minimum of 6 feet in width. X:\3920000.aIM926500\Correspndence\John E Tufte\Review Response Letter (Steve Olt)#1 .doc January 19, 2001 Mr. Stephen Olt Page 2 of 4 13. The comments from the Engineering, Marc Virata, will be addressed in a separate document. That document is included with this submittal. 14. The comments from the Stormwater Utility, Basil Harridan, will be addressed in a separate document. That document is included with this submittal. 15. The comments from the Traffic Operation Department, Eric Bracke, will be addressed in a separate document. That document is included with this submittal. 17(a). A short term (3/4) movement has been added to the intersection of Harmony Road and Melody Road (Cambridge Avenue). 17(b). This is a comment addressed by the architectural site plan. This has been modified in our drawing by working with BHA Design, Inc. 17(c). Sidewalk will be constructed along the west side of Melody Road (Cambridge Avenue) as phasing of the construction requires. 17(d). The intersection of Harmony Road and Melody Road (Cambridge Avenue) has been designed and does show interim and ultimate design requirements. 18(a). This comment has been noted. 18(b). Harmony Road has been designed along the Harmony Technology Park, Second Filing frontage. The design is a compilation of CDOT and Harmony Corridor design requirements. 19(a). The water main locations have been adjusted to allow for the minimum clearance between the electrical utility and various other utilities. 19(b). Easements by separate document will create utility corridors from Zeigler Road to Technology Parkway. 19(c). An easement has been shown on the plat for the location of the pad -mounted electrical switchgear. This location has been coordinated with Mr. Doug Martine. 20. As previously mentioned in various meetings with Mr. Marc Virata, a Public Access Easement will not be created for a north -south pedestrian connection through the middle of the site. 21. Sidewalk along the east side of Melody Road (Cambridge Avenue) will be constructed as development takes place along the east side. X:\3920000.all\3926500\Correspndence\John E Tufte\Review Response Letter (Steve Olt)#Ldoc January 19, 2001 Mr. Stephen Olt Project Planner Community Planning and Environmental Services City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 ft) J•R ENGINEERING A Subsidiary of Westrian Reference: Harmony Technology Park, Second Filing — 90% Submittal 39265.00 Dear Mr. Olt: This letter is regarding the December 6, 2000 City of Fort Collins review comments received for the referenced project. This letter will attempt to address all the comments in your letter. I will respond to the questions or comments as they are numbered in your letter. You will note that I skipped the comments that are not directly related to the Civil Engineering aspects of the plan submittal. Responses 1. An easement 20 feet wide has been added to the plat for Public Service. Gary Huett of Public Service requested this easement. 2. The comment by AT&T has been noted. 3. The comments from the South Fort Collins Sanitation District, Terry Farrill, will be addressed in a separate document. That document is included with this submittal. 6(c). I have met with Ron Gonzalez of the Poudre Fire Authority to discuss the fire hydrant spacing. Our office provided Mr. Gonzalez with an exhibit showing fire hydrant locations per their requirements. The locations are per this plan set. 9(a). The legal description has been revised to match the plat boundary. 9(b). Prior to recording the final plat, a final plat will be forwarded to Technical Services by either the City of Fort Collins or JR Engineering. 12. The comments from the Water/Wastewater, Jeff Hill, will be addressed in a separate document. That document is included with this submittal. 2620 East Prosper Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w jrengineeringsom