Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - CORRESPONDENCE -March 6, 2001 Mr. Ted Shepard City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 RE: Harmony Technology Park JR Project 9265.00 Dear Ted: 10 m C OU T T MAR 0 7 2001 ft) J•R ENGINEERING A Subsidiary of Westrian Please find attached JR Engineering's re -submittal of the Harmony Technology Park (HTP) Utility/Construction Plans. Pursuant to our meeting of February 14, 2001, the attached plans have incorporated the concerns of City Staff such that the project can move forward to the next Planning and Zoning Hearing scheduled for March 15, 2001. Due to the time constraints associated with this last submittal, and as discussed in our February 14th Pilot Project Team Meeting, JR has not been able to address all of the comments received on that date. In addition, we were not able to secure comments from the Stormwater Department until February 22, 2001. John Tufte in our office has been diligently coordinating with staff to ensure them that the plans are in a form that will be considered adequate for inclusion on the P&Z agenda. It was also agreed at our Team meeting that the Harmony/Cambridge construction plans will not be submitted concurrently with the HTP plans due to the design details being coordinated with CDOT and the City. Plans will follow as soon as practical. The final Harmony Road right-of- way is still in dispute; therefore, the attached Final Plat may not represent the final outer boundary of the HTP site. I speak for the entire HTP design team when I say we appreciate the flexibility and efforts being ii put forth by the City Staff to enable this project to stay on it's highly critical schedule. Please call if you should have any questions or need clarification on any items. Sincerely, Robert Almirall, P.E. Director of Operations cc: Dennis Armstrong - MBA Bruce Hendee - bha Mike Bello - HP X:\9265.00\Correspondence\030601 Ted Shepard 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w Jrengineering.com January 23, 2001 Mr. Stephen Olt Page 2 of 2 • City of Fort Collins, Water/Wastewater Utility, redlines from the previous submittal. • One copy of the stormwater management report for the City of Fort Collins Stormwater Utility. I have also included with this submittal a letter summarizing the status of this plan submittal. If you have any questions please feel free to contact me at your convenience. Sincerely, JR Engineering, LLC John E. Tufte, P.E. Project Engineer JET/ X:\3920000.all\3926500\Correspndence\John E Tufte\Review Response Letter (Steve Olt)#3.doc March 6, 2001 Mr. Stephen Olt Project Planner Community Planning and Environmental Services City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 ft) J-R ENGINEERING A Subsidiary of Westrian Reference: Harmony Technology Park, Second Filing — 90% Submittal Cover Letter 39265.00 Dear Mr. Olt: Included with this letter are the following items for your review and distribution: • Nine sets of Harmony Technology Park, Second Filing Utility Plans. • Nine sets of Harmony Road and Melody Road (Cambridge Avenue) Utility Plans. (Not including Harmony Road design elements due to agreement with Engineering) • Nine copies of the plat. • Review comments response letter to Mr. Jeff Hill, City of Fort Collins Water/Wastewater Utility. • Review comments response letter to Mr. Marc Virata, City of Fort Collins Engineering Department. Attached to this letter are copies of the letters of intent for off -site easements. • Review comments response letter to Mr. Basil Hamdan, City of Fort Collins Engineering Stormwater Utility. • City of Fort Collins, Engineering Department, redlines from the previous submittal. 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w Jrengineering.corn