Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - CORRESPONDENCE - REVISIONSdesign 12 sets Landscape Plans 8 sets Utility Drawings 1 copy Drainage Report 1 copy Planning/Engineering response notes redlines 13 copies Comment response letter Please feel free to call if you have any questions or need additional information. Sincerely, bhhaa design inc. by T Angela K. Milewski d L s 1 b In building, but will be screened with a fence or enclosure. We have shown this area connecting directly to the parking area, but outside the actual building envelope so we will have flexibility in its size. If required by zoning, we would recommend extending a smaller envelope around the loading areas rather than expanding the entire envelope to incorporate this space. Building envelopes are shown (not building footprints) and have been dimensioned on the site plan. Actual building footprints will be reviewed by Minor Amendment with each building phase. Comment 4 Dimensions between building envelopes have been shown on the plans. Comment 5 We are utilizing the `campus' layout as allowed within the Harmony Corridor zone district. Comment 6 We have revised the plans to show and label all bicycle racks and adjusted the total number of spaces. Comment 7 See response to comment 5 above. Comment 8 Our plans still reflect this conflict. We are coordinating with Storm Drainage to see if these private lines are required to have easements. If so, we will relocate the lines and/or restrict building connectors to overhead connections. We anticipate resolution of this issue at the May 8, 2000 submittal meeting. Comment 9 Crosswalks will be enhanced as noted on the site plan. Comment 10 Based on our conversation, we have retained the sign locations on the site plan, but added a note to clarify that they will require separate approval for sign permit. Comment 11 Done Comment 12 Done Comment 13 Building envelopes dimensions have been shown, see response 1 above. Comment 14 Phase lines have been shown on the planting plans. Comment 15 Based on our meeting with Jenny and Steve Olt, we have retained the prototypical landscape plan. All buildings will be required to have final building foundation landscape approved by Minor Amendment. We have included the following quantities for our resubmittal: 13 sets Site Plan 9 copies Plat 3 sets Prototypical Architectural Elevations Engineering General Comments Comment 4. The modification was approved at the Planning and Zoning Board Hearing. Comment 5. Ted Shepard has indicated that he will provide an appropriate street name. In the meantime, we have changed the road name back to Cambridge Avenue, but will revise all plans when the new name is identified. Comment 6. We have changed these street names to Timberwood Drive as you have requested. Comment 7. We have added notes to the site plan sheets regarding our understanding of the maintenance and permit requirements of the crosswalks within public rights -of -way. Site Plan Comments We have shown the Harmony Road improvements and right-of-way lines based on the civil/roadway documents by JR Engineering. Light and Power We have revised the note on the landscape plan and adjusted plant spacing as per your comment. Zoning Comment 1. Since we have the `campus' style layout, the buildings are planned to have main entrances on several sides of the building. All four building elevations are proposed to be equally detailed rather than having an apparent front and rear elevation. Also, we are illustrating only one set of prototypical elevations that will guide the level of design for all buildings within the development regardless of their orientation. All future buildings will be required to be reviewed by Minor Amendment when detailed information about it's size and design are known (see note on plan). This is also why only building envelopes, not building footprints are shown on the site and landscape plans. For this reason, we have labeled the architectural elevations as 1,2,3 and 4 rather than `front, rear, left and right' to eliminate the confusion with building names but allow this flexibility for future building elevations. Comment 2 We have removed the topo lines from the landscape plans. We have retained the existing topo lines on the site plan since it is required by the published site plan submittal requirements for Project Development Plans. Comment 3 The loading and storage areas will not be part of the May 7, 2001 Mr. Steve Olt City of Fort Collins Current Planning 281 North College Avenue Fort Collins, CO 80521 RE: Hewlett-Packard Harmony Technology Park Dear Steve, Thank you for your comments on the resubmittal of the PDP for Harmony Technology Park. JR Engineering has prepared a separate letter of response to utility, roadway and drainage issues. The site, landscape, architectural and lighting plans attached reflect revisions that address the majority of the comments in full. The following items are offered as exceptions or clarifications: Comment Response Water/NVastewater We have shown the water and sewer lines on the planting plans and included the note of required separations. Transfort After speaking with Gaylene Rossiter and John Daggett about this issue, we have shown a future potential transit stop on Harmony Road on our site plan. However, we have also added a note to the site plan stating that the actual location will be determined in the future by Transfort based on proposed operations and routes. Transportation Planning Comment 1. The crosswalk at the entrance to Celestica falls at the intersection of two public roads (Technology Parkway and Timberwood Drive). The lighting of the public roadways is prepared by City Light and Power, and is not generally determined in detail until plans are approved. However, we are certain that this crosswalk will be adequately lighted since Light and Power prioritizes lighting of public road intersections. y Comment 2. We have removed these drive connections from the plans. Comment 3. See Transfort comment above. design LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING BHA DESIGN, INC. <ROT INNOVATION DRIVE FT. COLLINS, CO 80525 T E L 970 223.7577 FAX 970 223.1E27