HomeMy WebLinkAboutYorktown Corner - Group Home Review - 10-97 - Routing Sheet SUBMITTAL DOCUMENTS - ROUND 2 - 04/30/1997Project:
Planner:
Engineer:
Traffit Operations:
Date:
Items Requested
Redlined Items Being Return
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Site land Utility Drainage Rpt Other Items Required
ed
Site land Utility Drainage Rpt Other Items Being Returned
Engineering
Stormwater
Water/Wastewater
Traffic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
Revisions Routing Sheet f4)LAM,2--
0.4.Lo / .
PAVEMEN
..
C........
BUILDING INSPECTION
.ENGINEERING:
■■■■■■■■■■.
FCLWD/ELCO/BOXELDER
milmmmmm
mmmm
ADVANCE PLANNING
R.O,W PLANNING
WATER CONSERVATION
PUBLIC SERVICE
.■■■■■■■■■■■■
■■■■■■■■■■■■■
RAILROAD: UP or BN/CS
............
■■■
■■■
■■■.
Rev. 4-22-97