Loading...
HomeMy WebLinkAboutBUCKING HORSE FILING FOUR - PDP - PDP150026 - CORRESPONDENCE - REVISIONS12/16/2015: Please add a note that all water main will be buried between 4.5 and 5.5 feet. In addition to the note on the general notes sheet, a general note has been added to the utility plans. Comment Number: 5 Comment Originated: 12/16/2015 12/16/2015: Utility easements are required for all water and sewer mains per City standards. A blanket easement has been provided. Comment Number: 6 Comment Originated: 12/16/2015 12/16/2015: Please show all fire services on the utility plan. Fire services have been added. Comment Number: 7 Comment Originated: 12/16/2015 12/16/2015: Please show the curb stop for building 15 water service in the nearest landscape island to the water main. Curb stop has been relocated. Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom(a)fcgov.com Topic: Site Plan Comment Number: 1 Comment Originated: 12/16/2015 12/16/2015: Please provide a breakdown of parking requirements per building type on the Land Use Data chart. ex. (5) Building 'A'- 24 plex (6) 3 bedrooms, (12) 2 bedrooms, (6) 1 bedroom requires 210 parking spaces. Required parking per building type has been broken down as requested. Comment Number: 2 Comment Originated: 12/16/2015 12/16/2015: 1 added 5 parking spaces required for the clubhouse so the total should be 554 overall. Amount has been added in chart and to total required. 13 12/15/2015: There are line over text issues. See redlines. Issues resolved per redlines. Comment Number: 23 Comment Originated: 12/15/2015 12/15/2015: Please add "FDC" to the Site Legend. See redlines. Removed, part of utility file that is not necessary. Department: Traffic Operation Contact: Martina Wilkinson, 970.221-6887, mwilkinson(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/17/2015 12/17/2015: The submitted traffic study information compared the ODP approved uses with the current proposed uses and indicated that the change is nominal. The conclusions of the memo are accepted by the City. Noted. Comment Number: 2 Comment Originated: 12/17/2015 12/17/2015: Discussion about potential traffic calming in the neighborhood (speed humps or tables) should continue. Noted. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolsonanfcgov.com Topic: General Comment Number: 1 Comment Originated: 12/08/2015 12/08/2015: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson(@fcgov.com Noted. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue a()fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/16/2015 12/16/2015: The water meter pits for buildings 16 through 23 can not be located in a hardscape. Please relocate the water services so the curb stops and meter pits are located within a landscape area. Meterpits have been relocated. Comment Number: 2 Comment Originated: 12/16/2015 12/16/2015: The fire hydrant stub on the northeast part of the site can be 6 inches in diameter. All other water main needs to be 8 inches. Acknowledged. Comment Number: 3 Comment Originated: 12/16/2015 12/16/2015: Please add/remove water main valves per the redlines on the Utility Plan. Valves have been updated. Comment Number: 4 Comment Originated: 12/16/2015 12 redlines. Utility easement has been removed to reflect Plat blanket easement. Comment Number: 12 12/15/2015: There are line over text issues. See redlines. Topic: Lighting Plan Comment Number: 13 12/15/2015: No comments. Topic: Plat Comment Number: 14 Comment Originated: 12/15/2015 Comment Originated: 12/15/2015 Comment Originated: 12/15/2015 12/15/2015: Please add new title commitment information as available. New Title Commitment info is now provided. Comment Number: 15 Comment Originated: 12/15/2015 12/15/2015: The zoning is not required, and may be removed if you choose. Acknowledged. Comment Number: 16 Comment Originated: 12/15/2015 12/15/2015: There are line over text issues. See redlines. Line over text issues have been corrected. Comment Number: 17 Comment Originated: 12/15/2015 12/15/2015: All reception numbers for documents recorded by separate document, must be added prior to producing mylars. Acknowledged. Topic: Site Plan Comment Number: 18 Comment Originated: 12/15/2015 12/15/2015: Please revise the project boundary shown in the Zoning & Context Maps on sheet LS001. This boundary should reflect the Subdivision Plat and/or the area of Filing Four that is shown on the Site Plans. See redlines. Boundary changed to match site plan area of development. Plat boundary and site development boundary to be coordinated for Final Plan. Comment Number: 19 Comment Originated: 12/15/2015 12/15/2015: The long legal description is not necessary. "Lot 1 & Tract A, Bucking Horse Filing Four" or just "Bucking Horse Filing Four" is all that is needed. See redlines. Legal description has been updated. Comment Number: 20 Comment Originated: 12/15/2015 12/15/2015: Please spell out "EMY for the sheet EA100 description in the sheet index. See redlines. EA100 has been removed from the set, PFA did not need this sheet. Comment Number: 21 Comment Originated: 12/15/2015 12/15/2015: There is a 30' Utility Easement shown on sheets LS101 & LS102, that is not on the Subdivision Plat. Please remove this, or if it is an existing or proposed easement, have the Surveyor add it to the Plat. See redlines. Utility easement has been removed to reflect Plat blanket easement. Comment Number: 22 Comment Originated: 12/15/2015 11 Topic: Building Elevations Comment Number: 1 12/15/2015: There are text over text issues. See redlines. Comment acknowledged. Comment Number: 2 12/15/2015: There are line over text issues. See redlines. Comment acknowledged. 'Topic: Construction Drawings Comment Number: 3 Comment Originated: 12/15/2015 Comment Originated: 12/15/2015 Comment Originated: 12/15/2015 12/15/2015: Please correct the value in the Benchmark Statement equation. The value has been corrected. See redlines. Comment Number: 4 Comment Originated: 12/15/2015 12/15/2015: All benchmark statements need to match on all sheets. Benchmark statements have been coordinated. Comment Number: 5 Comment Originated: 12/15/2015 12/15/2015: There are line over text issues. See redlines. Line over text has been corrected. Comment Number: 6 Comment Originated: 12/15/2015 12/15/2015: Please tie the coordinate values shown for utilities to the project boundary. We would prefer that this be done by adding property corner values to each sheet, or showing the property corner values on the horizontal control plans and adding a note to each sheet with coordinate values. Coordinates have been added to the utility plan sheets. Comment Number: 7 Comment Originated: 12/15/2015 12/15/2015: There are text over text issues. See redlines. Text over text issues have been corrected. Comment Number: 8 Comment Originated: 12/15/2015 12/15/2015: All Basis Of Bearings statements need to match on all sheets. Basis of bearings have been corrected. Topic: Landscape Plans Comment Number: 9 Comment Originated: 12/15/2015 12/15/2015: Please revise the project boundary shown in the Zoning & Context Maps on sheet LP001. This boundary should reflect the Subdivision Plat and/or the area of Filing Four that is shown on the Site Plans. See redlines. Comment Number: 10 Comment Originated: 12/15/2015 12/15/2015: The long legal description is not necessary. "Lot 1 & Tract A, Bucking Horse Filing Four" or just "Bucking Horse Filing Four" is all that is needed. See redlines. Legal Description changed. Comment Number: 11 Comment Originated: 12/15/2015 12115/2015: There is a 30' Utility Easement shown on sheets LP100S101 & LS102, that is not on the Subdivision Plat. Please remove this, or if it is an existing or proposed easement, have the Surveyor add it to the Plat. See 10 Comment Number: 7 Comment Originated: 12/10/2015 12/10/2015: BALCONIES AND DECKS > IFC 903.3.1.2.1: Sprinkler protection shall be provided for exterior balconies, decks, and ground floor patios of dwelling units where the building is of Type V construction. Comment acknowledged. Comment Number: 8 12/10/2015: FIRE PITS Comment Originated: 12/10/2015 Fire pits and outdoor cooking devices fueled by natural gas are allowed. Wood burning or smoke producing fire pits and outdoor cooking devices are prohibited. Comment acknowledged. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlamanfcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 12/07/2015 12/07/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Sch lam 970-218-2932 or email @ ischlam fcgov.com Erosion Control report will be provided at Final. Contact: Wes Lamarque, 970-416-2418, wlamargue&fcgov.com Topic: General Comment Number: 2 Comment Originated: 12/15/2015 12/15/2015: Please provide documentation that the PDP is meeting the City's LID requirements. This should be included in a drainage report addendum. Per our meeting with staff, an LID exhibit. Comment Number: 3 Comment Originated: 12/15/2015 12/15/2015: Please provide sub -basins to the drainage plan to help illustrate that the site is draining per the original Bucking Horse Drainage Report. An exhibit depicting the proposed drainage basins and major drainage concept and their conformance with the original Bucking Horse drainage report has been provided. Comment Number: 4 Comment Originated: 12/16/2015 12/16/2015: The grading shows that a large part of this development drains to the inlet at the southeast area of the site. This inlet and piping may be large to carry these flows and an overflow needs to be provided for this sump condition. Current plans anticipate piping the minor storm events and allowing major events to pass overland. Curb cuts for the 100-yr storm have been provided. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty((Dfcgov.com 0 shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Comment Number: 3 Comment Originated: 12/10/2015 12/10/2015: PRIVATE DRIVES Private drives which serve as fire lanes shall be dedicated as an Emergency Access Easement. Noted. Comment Number: 4 Comment Originated: 12/10/2015 12/10/2015: MARKING Fire Lane signage or red curbing will be required to delineate the limits of emergency access. Code language provided below. Refer to Appendix D for further information. > IFC503.3: Where required by the fire code official, approved signs or other approved notices that include the words NO PARKING - FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times ad be replaced or repaired when necessary to provide adequate visibility. Fire Lane signage has been added to the Paving and Signage Plan as discussed. Comment Number: 5 Comment Originated: 12/10/2015 12/10/2015: WATER SUPPLY A fire hydrant is required within 300' cf any commercial structure and the distance is measured along an approved path of vehicle travel. This condition is not currently being met along the south portion of the site, specifically Building 21. An additional hydrant is required at the entrance north of Building 20 and the proposed hydrant north of Building 18 should be shifted to the entrance near Building 16. Code language provided below. > IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS. Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter. The hydrants have been reconfigured as shown on your redlines and now meet the requirement. Comment Number: 6 Comment Originated: 12/10/2015 12/1012015: CLUBHOUSE Should the clubhouse exceed 5,000 sq, ft. it will be required to be sprinkled or fire contained, however keep in mind that other factors may also drive the sprinkler requirement. Should the occupant load be expected to exceed 99 persons for this assembly occupancy, an automatic fire sprinkler system will be required. Code language provided below. Comment Acknowledged. We will plan on the Clubhouse being sprinklered. > IFC 903.2.1.2:An automatic sprinkler system shall be provided for Group A-2 occupancies where the fire area exceeds 5,000 SF or the fire area has an occupant load of 100 or more. Comment acknowledged. 9 access point. Fire access was consequently labeled inappropriately on the Emergency Access Plan. RESIDENTIAL BUILDINGS: Further evaluation of the site plan shows fire access having been met for all residential buildings except two (Buildings 13 & 15), which are out of access by approximately 55' & 70' respectively. As the buildings will be equipped with a fire sprinkler system, those distances are determined to be within acceptable limits and no changes are required. GARAGES: Fire access to within 150' of all exterior portions of the garage units along the north property line has not been achieved and the limits of the fire lane will need to be adjusted to accommodate this need. Code language provided below. > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access, the fire code official is authorized to increase the dimension if the building is equipped throughout with an approved, automatic fire -sprinkler system. Noted. Comment Number: 2 Comment Originated: 12/10/2015 12/10/2015: AERIAL FIRE APPARATUS ACCESS Buildings over 30' in height, as defined by code, require wider fire lanes aerial fire apparatus. The preliminary plans suggest that some building heights may be at or possibly over the 30' threshold. The project team is asked to review the building heights with respect to the fire code and provide further clarity that code requirements are being met. Code language provided below or see 2012 IFC Appendix D for further information. Noted. EAE sheet removed per PFA request. We will ensure all of the buildings are below 30' in height as defined by the code. AERIAL FIRE APPARATUS ACCESS ROADS - WHERE REQUIRED > IFC D105.1: Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet, approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Comment Acknowledged. We will ensure all of the buildings are below 30' in height as defined by the height of the roof eave. AERIAL FIRE APPARATUS ACCESS ROADS - WIDTH > IFC D105.2; FCLUC 3.6.2(B)2006; and Local Amendments: Aerial fire apparatus access roads shall have a minimum unobstructed width of 30 feet, exclusive of shoulders, in the immediate vicinity of the building or portion thereof. AERIAL FIRE APPARATUS ACCESS ROADS - PROXIMITY TO BUILDING > IFC D105.3: At least one of the required access routes meeting this condition 7 Noted. Comment Number: 2 Comment Originated: 12/14/2015 12/14/2015: New development charges will apply for this project. A link to our electric development fee estimator is given below. http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen t-developmen t-fees/electric-d eve lopment-fee-esti m ator?id=1 Noted. Comment Number: 3 Comment Originated: 12/14/2015 12/14/2015: Transformer and meter locations will need to be coordinated with Light & Power Dept. Clearance requirements will need to be maintained for the transformers. An 8' front and 3' rear/side clearance must be maintained. Also transformers must be located within 10' of a drivable surface. Acknowledged. We believe all transformers shown meet the criteria specified. Applicant is happy to work with L&P as needed to finalize locations with final plans. Comment Number: 4 Comment Originated: 12/14/2015 12/14/2015: Please show meter locations on the Utility drawings. Meters should be located as close as possible to the transformer. They should also be gained metered and on opposite side of building from gas meters. Comment Number: 5 Comment Originated: 12/14/2015 12/14/2015: Transformers cannot be located underneath the drip zone of any trees. This is due to access purposes as well as roots causing damage to the electrical infrastructure. Please ensure all transformers are out of the drip zone of trees. Noted. Comment Number: 6 Comment Originated: 12/14/2015 12/14/2015: For the clubhouse, a one -line diagram will need to be provided to ensure proper metering requirements are met. Also a Commercial Service Form (C-1) will need to be submitted. A link to this document is provided Below: http://www.fcgov.com/utilitiesAmq/site specific/uploads/c-1 form.pdf Acknowledged. Comment Number: 7 Comment Originated: 12/14/2015 12/14/2015: Please review our Electric Construction Policies, Practices and Procedures to ensure standards are met. a link to this document is attached to the website below. If you have any questions please contact Todd Vedder with Light & Power Dept @ 224-6152. http://www.fcgov.com/utilities/img/site_specific/uploads/Electric_Construction_ Policies PracticesProced u res. pdf Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilVnxwilera(�poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 12/10/2015 12/10/2015: GENERAL FIRE ACCESS Fire access to within 150' of all exterior portions of every building is a measurement along the path of hose lay and not as an arch from a single 6 12/16/2015: As proposed, the area where Miles House Avenue and Private Drive meet does not have drainage that works. There are a couple low spots that won't drain. See redlines. The spot elevations shown have been corrected to accurately show the design. No low points exist. Topic: Plat Comment Number: 1 Comment Originated: 12/16/2015 12/16/2015: Add the following note to the plat: "There shall be no private conditions, covenants or restrictions that prohibit or limit the installation of resource conserving equipment or landscaping that are allowed by sections 12-120—12-122 of the City Code." The note has been added. Comment Number: 2 Comment Originated: 12/16/2015 12/16/2015: The portion of Miles House Ave west of Nancy Gray Avenue needs to be vacated with the rest of the internal streets that is going to City Council. Acknowledged. Comment Number: 3 Comment Originated: 12/16/2015 12/16/2015: Please provide utility, access and drainage easements within Lot 1. All City waterlines, hydrants, and sewer lines need to be in utility easements. Storm lines and any detention will need to be in drainage easements. Blanket easements for drainage, utilities and access exist on the entirety of Lot 1. Comment Number: 4 Comment Originated: 12/16/2015 12/16/2015: The raised crosswalks at the ends of Yearling Drive, Cutting Horse Drive and Miles House Avenue will need to be in public access easements. A blanket access easement exists on the entirety of Lot 1. Department: Environmental Planning Contact: Kelly Kimple, 970-416-2401, kkimplea)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/17/2015 12/17/2015: The site and landscape plans look good and we agree that another ECS is not necessary at this time. However, we have not received the wetland/upland mitigation monitoring report for the overall site and we are concerned that some of Filing 4 may account for the 31.12 acres of compensatory native upland habitat, as required from previous filings. Please schedule a meeting with Cedar Creek and the City to determine a monitoring schedule and submit at least the project location map and project history summary portions of the monitoring report. Noted. Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/14/2015 12/14/2015: Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our policies, development charge processes, and use our fee estimator at h ftp://www. fcgov. com/utilities/business/builders-and-developers. 5 standard, Staff is concerned that the arrangement appears repetitious, especially with the front doors being placed on the side elevations. Has the team considered introducing a variety of porch roofs, materials, columns, colors, etc. to provide a visual break among the eight buildings? We propose to have a variety (min. of 4) paint schemes per building to create variety. Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa(a.fcgov.com Topic: General Comment Number: 5 Comment Originated: 12/16/2015 12/16/2015: List all private drives in Note 47 of the General Notes. We now list the private drives in Note 47. Comment Number: 6 Comment Originated: 12/16/2015 12/16/2015: Show all easements in the Utility Plan All easements are shown. Please note that there is a blanket easement on the entire site. Comment Number: 7 Comment Originated: 12/16/2015 12/16/2015: List all internal drives as private drives. Also, please provide drive names if any. All internal drives that will receive names are labeled. Please note that Calabrese Street is a continuation of Yearling in some ways. Will a different street name be acceptable? Comment Number: 8 Comment Originated: 12/16/2015 12/16/2015: Maintenance signs will be needed at the start of all private drives. Signs shall read: "'Private Drive Name' Privately Maintained" The requested signage has been added to the Striping and Paving Plan. Comment Number: 9 Comment Originated: 12/16/2015 12/16/2015: Why are areas in Tract A not being shown in the Utility Plan? Add a note that states this tract is part of the project and plat, but no development is happening in the area or show an overall sheet with the plat boundaries. There are areas. There are three new proposed storm pipes that will be affecting this tract. Tract A extends nearly 2500 north of this project boundary, and no improvements are proposed within those extents. As such, we have limited our drawing extents to the portions of the project that are relevant. Per discussions with staff, and note has been added on the appropriate plan sheets indicating that no improvements are proposed beyond the limits shown in the drawings. Comment Number: 10 Comment Originated: 12/16/2015 12/16/2015: The drive approach on Nancy Gray Avenue does not meet City standards. Concrete will be needed to the back of walk/property line. Refer to Detail 707.1. Concrete has been added to the ROW. Comment Number: 11 Comment Originated: 12/16/2015 12/16/2015: Show spot elevations for existing roadways on Cutting Horse Drive and Yearling Road. How will existing drainage be conveyed? Based on the spot elevations provided, it doesn't appear that drainage on Yearling Road and Gooseberry Lane will work. See redlines. The spot elevations have been updated to accurately reflect the design. Drainage will be conveyed from Yearling into the site. Drainage from Cutting Horse will be intercepted by the storm inlets shown. Comment Number: 12 Comment Originated: 12/16/2015 menu of distinctive options (six?) that can then be distributed among the various buildings such that no two are in sequence. These options can be assigned on a per building basis such that an entire new set of architectural elevations do not have to be prepared. Building A2 has been revised to show the 4 unique elevation options for the building entries that will be applied to all of the type A, A2 and B buildings in the project. Comment Number: 6. Comment Originated: 12/16/2015 12/16/2015: Please note that Section 3.5 requires a land use transition between different housing types. For this project, a land use transition occurs along the back side of the "C" buildings and their garages. In order to provide for high quality transition, please provide shrub beds behind the "C" building garages. Shrub beds have been added to the back of all Type 'C' buildings as well as evergreen and deciduous trees within buffer zone. Comment Number: 7. Comment Originated: 12/16/2015 12/16/2015: Where the connecting walkway is provided to Nancy Gray, be sure to note that any side yard fencing along the two single family lots that front on Nancy Gray must be reduced to no more than four feet in height from the from front building line to the property line for sight distance. If these lots are not under the control of the applicant, then Staff will review at the time of application for building permits. Neighborhood covenants restrict fencing from being higher than 4'-0". Comment Number: 8. Comment Originated: 12/16/2015 12/16/2015: Staff remains concerned that small pockets of amenities are not distributed throughout the project. In the response to the Conceptual Review comments, the applicant emphasizes the quality of the central clubhouse, pool, outdoor kitchen, garden and the like. While these features are indeed laudable, on an overall basis, the project lacks the small-scale "city comfort" like features that need not be as extensive but would add a quality aspect if distributed to the more remote areas of the project. As discussed at the project review meeting, the team indicated that the overall intent of this comment can be addressed. Three additional grilling and covered table areas have been added in the overall project. One is the central lawn area, one by the intersection of Calabrese and Andalusian and one by the entrance off of Cutting Horse Drive. Comment Number: 9. Comment Originated: 12/18/2015 12/18/2015. On the Site Plan sheets, please add labels as suggested on the redlines. It would be helpful if the various garages and covered parking were keyed to the architectural elevations. Notes have been added to refer to architectural plans with building letter callout. Comment Number: 10. Comment Originated: 12/18/2015 12/18/2015: On the Landscape Plan sheets, please add labels as suggested on the redlines. Labels have been added per redlines. Comment Number: 11. Comment Originated: 12/18/2015 12/18/2015: On the architectural sheet A4.1C, for the 'C" buildings, is there any concern that for the eight buildings arrayed in sequence, there is no distinguishing feature along the front elevations? While duplexes are not considered multi -family and not subject to the Variety Among Buildings M number of parallel parking spaces. We discussed, widening the walk where it is attached to six feet. We discussed increasing the number of trees, perhaps by adding Ornamental Trees that are closely spaced with Street Trees. We discussed adding foundation shrubs as well. Sidewalks along east side of Calabrese Streets have been changed to allow for a tree lawn. Sidewalks on south side of Anadalusian Street have been changed to allow for a tree lawn. Sidewalks along Lusitano Lane have been widened to 6-0" width. Sidewalks on the west side the main apartment parking lot have been widened to 6'-0". Sidewalk around building 10 have been widened to 6-0". Because of the 15' building setback along these roads we feel that having the sidewalk further away from the resident windows, as well as still providing room for lawn and shrub bed between the sidewalk and building, out weighs a detached sidewalk scenario. Comment Number: 2. Comment Originated: 12/16/2015 12/16/2015: As mentioned at Conceptual Review, eight of the C buildings are not well connected to the sidewalks on Calabrese. While two walkways are provided to Nancy Gray, these are located to the rear of the units and will not likely be used on a daily basis. At either end, both Buildings 23 and 16 can be provided with direct sidewalks to Calabrese. Please explore other opportunities to break the rows of surface and garage parking to provide walkway connections between the C buildings and Calabrese. These connections should tie more closely to the units and not the attached garages. As discussed at the review meeting, various options will be explored and the landscaping adjusted accordingly such that the overall intent of this comment can be addressed. Walkways for buildings 16 and 23 connections to Calabrese have been added. Additional sidewalks have been added to directly connect Type 'C' buildings to Calabrese from trail connection that connect to alley behind LMN lots along Nancy Grey Ave. Walkways to Type 'C' buildings have been changed to have forward facing approach, rather than garage approach. Comment Number: 3. Comment Originated: 12/16/2015 12/16/2015: Staff is concerned that, as designed, the project may fall short of complying with Section 3.8.30(F)(2) — Variation Among Buildings. The differences between the A and B buildings are rather subtle, particularly with regard to their building footprints. Please note that the standard clearly states that "building designs shall be considered similar unless they vary significantly in footprint size and shape." With both containing 24 units, their footprints do not vary significantly. Four distinctive building entry elements have been deigned to be used with buildings A, A2 and B to in order to create more variety between the buildings and entries. Please note that building A2 has a significantly different elevations even though the footprint is the same as building A. Comment Number: 4. Comment Originated: 12/16/2015 12/16/2015: If the A and B building footprints do not vary significantly, then building variety may have to be achieved by other means. Please review Section 3.8.30(F)(2) to find other opportunities to comply with the standard. Please see response to comment no. 3. Comment Number: 5. Comment Originated: 12/16/2015 12/16/2015: For example, for Buildings A and B, the breezeway entrances are not differentiated. Please consider establishing a variety of distinctive entrances, and or entry features, that will contribute to variety among buildings. As discussed at the review meeting, perhaps one solution would be to create a 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/de velopmentreview December 18, 2015 Paul Mills RUSSELL & MILLS STUDIOS 141 S COLLEGE AVE SUITE 104 Fort Collins, CO 80524 RE: Bucking Horse Filing Four, PDP150026, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard(a)fcgov.com Topic: General Comment Number: 1. Comment Originated: 12/16/2015 12/16/2015: Staff is concerned about the condition where the parallel parking along the Street Like Private Drives causes the elimination of the parkways and result in attached sidewalks. This design diminishes the quality of the S.L.P.D�s. The original intention of the S.L.P.D. was to allow for a degree of flexibility where providing a public street to serve the interior of a large multi -family development would not be practical. As an alternative to a public street, the S.L.P.D. was established to promote the fundamental principle that buildings should face streets and not internal parking lot drive aisles. But, in order for the overall design principle to be implemented, the "street -like" features need to be included to contribute to the project becoming part of the neighborhood and the City and not an isolated complex of buildings. In order to mitigate the proposed design, several ideas were discussed at the project review meeting. All of these ideas have merit. As mentioned, there may be practical and aesthetic reasons to not moving the sidewalk closer to the buildings in order to create a parkway. We discussed possibly reducing the