Loading...
HomeMy WebLinkAboutBUCKING HORSE FILING FOUR, MIXED-RESIDENTIAL - FDP - FDP160023 - CORRESPONDENCE -Topic: Site Plan ` Comment Number: 7 Comment Originated: 06/06/2016 06/06/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 8 Comment Originated: 06/06/2016 06/06/2016: There are line over text issues. See redlines. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcqov.com Topic: General Comment Number: 1 Comment Originated: 06/07/2016 06/07/2016: Thrust blocks are required for all fire services. Not all are labeled. Also, do buildings 16-23 have a separate fire service? 12/16/2015: Please show all fire services on the utility plan. Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcqov.com Topic: Site Plan Comment Number: 1 Comment Originated: 06/06/2016 06/06/2016: We appreciate the idea of providing handicap accessible garages these should not be counted towards the minimum requirement. 10 Comment Number. 5 uumment Originated: 06/07/2016: Please provide a buried riprap detail. The City suggests using permanent erosion control mats in lieu of riprap. Comment Number: 6 Comment Originated: 06/07/2016: Please provide drainage easements for all rain gardens, bio-swales, and underground vaults. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Building Elevations 06/07/2016 06/07/2016 Comment Number: 10 Comment Originated: 06/06/2016 06/06/2016: There are text over text issues. See redlines. Topic: Construction Drawings Comment Number: 12 Comment Originated: 06/06/2016 06/06/2016: There are line over text issues. See redlines. Comment Number: 13 06/06/2016: There are text over text issues. See redlines. Topic: Landscape Plans Comment Number: 9 06/06/2016: No comments. Topic: Lighting Plan Comment Number: 11 06/06/2016: No comments. Topic: Plat Comment Originated: 06/06/2016 Comment Originated: 06/06/2016 Comment Originated: 06/06/2016 Comment Number: 1 Comment Originated: 06/06/2016 06/06/2016: The legal description & boundary do not match. See redlines. Comment Number: 2 Comment Originated: 06/06/2016 06/06/2016: Are there any Lienholders for this property? If so, please add a signature block. If not, please add a note stating there are none, and include response in written comments. Comment Number: 3 Comment Originated: 06/06/2016 06/06/2016: Please add a note of vacation of existing easements from the previous subdivisions. Comment Number: 4 Comment Originated: 06/06/2016 06/06/2016: Please add dedication information for all street rights of way. See redlines. Comment Number: 5 Comment Originated: 06/06/2016 06/06/2016: Please add missing symbols. See redlines. Comment Number: 6 Comment Originated: 06/06/2016 06/06/2016: Please add the Ordinance numbers for the street vacations. See redlines. E Comment Number: 22 Uomment Originated: 06/09/2016 06/09/2016: On the four enlarged site plans, please add to the legends that EM and GM indicate electrical meter and gas meter, and that TF indicates electrical transformer. Comment Number: 23 Comment Originated: 06/09/2016 06/09/2016: Please remove contour lines (gray scale) from the enlarged site plan sheets. Comment Number: 24 Comment Originated: 06/09/2016 06/09/2016: The project is now in Pre-Mylar Review and the Development Agreement will soon be drafted. In order to not cause unnecessary delay with regard to fully executing the Development Agreement, the applicant is advised to contact Jesse Schlam, Stormwater Engineering, 218-2932, to discuss the exact amount of the Escrow/Security for erosion control measures. This amount will be documented in the Development Agreement. Comment Number: 25 Comment Originated: 06/09/2016 06/09/2016: Also, time can be saved at the end of the process, after executing the final mylars and Development Agreement, and the full activation of the any Building Permit, by working concurrently on addressing the buildings. Staff will coordinate with the applicant, Poudre Fire Authority and the G.I.S. Department so this task does not unnecessarily delay the full activation of a Building Permit. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 06/02/2016 06/02/2016: Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan (Based upon returned redlines), Erosion Control Report (Based upon returned Disk), and an Escrow / Security Calculation (Not included in the materials). If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam @fcgov.com Contact: Wes Lamarque, 970-416-2418, wiamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/06/2016 06/06/2016: The rain gardens are required to be sized per Urban Drainage. The rain gardens do not meet the LID requirements for the development per the current design. The City requires LID treatment on sites that currently have existing standard water quality treatment. The code states that 75% of the site will need to be treated with a LID technique. Comment Number: 3 Comment Originated: 06/06/2016 06/06/2016: Please provide a LID table on the drainage plan. Comment Number: 4 Comment Originated: 06/07/2016 06/07/2016: Please provide all LID details that are being proposed. M Comment Number: 13 Comment Originated: 06/09/2016 06/09/2016: Similarly, a speed table, and perhaps directional signage, are recommended in the parking lot at the northwest end near the Gooseberry intersection to also deter non -tenant traversing of the parking lot. Comment Number: 14 Comment Originated: 06/09/2016 06/09/2016: The buildings on Cutting Horse will be addressed based on the street's east -west orientation. But, Building 5 is on a north -south segment of this street. To avoid confusion with addresses being based on the City's grid, Building 5 should be addressed off Nancy Gray Avenue. Comment Number: 15 Comment Originated: 06/09/2016 06/09/2016: The same addressing situation will apply to Building 10. Because of the directional change on Yearling Drive, Building 10 would best be addressed off Miles House Avenue. Staff will confirm with P.F.A. and G.I.S. regarding how best to address Buildings 5 and 10. Comment Number: 16 Comment Originated: 06/09/2016 06/09/2016: For the eight duplexes (16-23), staff is concerned about the repetitive effect of the building form and the array of 32 garage doors. Has any consideration been given to adding any building form variety to these structures? Could the garage door style be varied to break up the visual aspect? While the individual building is attractive, could variety be introduced perhaps by adding different entry features to avoid repetition? Comment Number: 17 Comment Originated: 06/09/2016 06/09/2016: There seems to be a discrepancy between architectural sheet A4.1 C (building elevation 01) and the enlarged site plan sheets LS 103 and LS 104. I'm not seeing how the building footprint matches the elevation. For example, the site plan indicates that duplex entrances are more obscured from the streets and drives than indicated on the elevation. And, the elevation indicates an overhang that extends past the walls and supported by columns but this feature is not shown on the site plan building envelopes. Comment Number: 18 Comment Originated: 06/09/2016 06/09/2016: On Sheet LP002, under General Note 15, please add a clause that states that "...the exact final location of shrubs around the building perimeters, where applicable, shall be adjusted to achieve maximum screening of outdoor condensing units." Comment Number: 19 Comment Originated: 06/09/2016 06/09/2016: On Sheet LP002, for each tree species, please indicate the percentage of the total tree count. Comment Number: 20 Comment Originated: 06/09/2016 06/09/2016: There is line work on the enlarged site plans that is not referenced (are these raingardens?) — see redlines. Comment Number: 21 Comment Originated: 06/09/2016 06/09/2016: Where the Bucking Horse Trail crosses Nancy Gray, a cross -walk and caution signage may need to be provided. This signage will need to be coordinated with the railroad crossing signage. Traffic Operations will participate in this aspect signage and striping. Comment Number: 3 Comment Originated: 06/06/2016 06/06/2016: Let's clarify that with regard to these highlighted entries, these entries will occur on both sides of the multi -family building and not just on one side. Comment Number: 4 Comment Originated: 06/06/2016 06/06/2016: On Miles House Avenue, along buildings 10 and 16, the sidewalk is attached. If this street segment is to be public, then the sidewalk needs to be detached. Comment Number: 5 Comment Originated: 06/06/2016 06/06/2016: On Landscape Sheets LP103 and LP104, street light fixtures should be shifted closer to the intersections and the spacing of the street trees adjusted accordingly. Also, don't forget that Ornamental Trees can be placed to within 15-feet of a street light. Comment Number: 6 Comment Originated: 06/06/2016 06/06/2016: On Landscape Sheet LP103, staff recommends additional Evergreen Trees be placed between Building 23 and the L-M-N Lot Filing Three for buffering the single family. Please consider Bacheri and Hoopsi Spruce to enrich the mix of Evergreen Trees. Comment Number: 7 Comment Originated: 06/06/2016 06/06/2016: The Landscape Plan indicates that street trees along Gooseberry and Nancy Gray are installed, or to be installed by others. Is this the case? Please verify. Comment Number: 8 Comment Originated: 06/06/2016 06/06/2016: On the Lighting Plan, please indicate the quantity of each fixture. Comment Number: 9 Comment Originated: 06/06/2016 06/06/2016: If building -mounted wall lights are to be considered (perhaps at the entrances), be sure that such fixtures are fully -shielded and down -directional. Comment Number: 10 Comment Originated: 06/06/2016 06/06/2016: Now is the time to consolidate the Planning Set into one set that includes the Site Plan, Landscape Plan, Architectural Elevations, Lighting Plan and all the attendant detail sheets. The Landscape Cover Sheet can be removed. The Site Plan Cover sheet should provide an expanded index and all sheets must be numbered sequentially. Comment Number: 11 Comment Originated: 06/09/2016 06/09/2016: On the architectural sheets, Buildings E, F, H, I, J, K are not keyed to the single Overall Site Plan which would be more convenient than referring to the four enlarged site plan sheets. For these architectural sheets, it may be helpful to add a Key Map. Comment Number: 12 Comment Originated: 06/09/2016 06/09/2016: With Lusitano Lane now reverting back to Cutting Horse Drive, there may need to be directional way -finding signage immediately upon entering the site off Nancy Gray Avenue. Otherwise, with the alignment of the parking lot drive, a motorist may inadvertently keep going straight into the parking lot instead of turning left onto the street -like private drive. Perhaps a speed table at the parking lot entrance, combined with directional signage, would help deter such a movement. Comment Number: 4 Comment Originated: 06/05/2016 06/05/2016: STREET NAMING Street names should be continuous to the fullest extent possible. PFA has questions as to why: > Cutting Horse public street changes to Lusitano Lane private drive? > Yearling Road public street changes to Calabrese Street private drive? Comment Number: 5 Comment Originated: 06/05/2016 06/05/2016: GROUP S-2 AUTOMATIC SPRINKLER SYSTEM REQUIREMENTS Building Type C units will require a sprinkler system. Please contact Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related questions at 970-416-2868. Comment Number: 6 Comment Originated: 06/05/2016 06/05/2016: FIRE PITS & GRILLS Fire pits and grills shall have a 10' separation to combustible construction and/or vegetation. This distance is measured both horizontally and vertically from the fire source. Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcqov.com Topic: General Comment Number: 1 Comment Originated: 06/06/2016 06/06/2016: Staff recommends that the bike/pedestrian path along the northeast edge be shifted further away from the garages. Since this trail is a segment of a more comprehensive, neighborhood -scale system, it would seem to be more aesthetic and inviting if it did not appear to be so closely associate with the apartment project. For example, at one point, the path is only seven feet separated from the rear wall of the garages. Comment Number: 2 Comment Originated: 06/06/2016 06/06/2016: I'm not seeing where the Final architectural elevations satisfies the condition of PDP approval with regard to providing five entry designs to be distributed among the 13 M-F buildings in a manner that no two are next to each other. The Staff report for the PDP states the following: "Further, the Planning and Zoning Board recently approved (December) a multi -family project of comparable size where six individual entrances would be divided among 15 multi -family buildings. Bucking Horse Multi -Family Apartments would benefit from an equivalent ratio by increasing the number of entry options from four to five to be divided among 13 buildings. Staff, therefore, recommends the following condition of approval: At the time of submittal for the Final Plan, the architectural elevations for the 13 multi -family buildings shall be further defined to include a greater variety of exterior materials, window patterns, stairwell treatment and at least one additional entry feature. Further, the mix of entry features, paint colors and exterior materials must be assigned to each individual building to ensure variation and avoid repetition." 5 Wind Load:100- iAPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code for Multi -family and Condominiums 3 stories max: 2012 IECC residential chapter. Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder@fcqov.com Topic: General Comment Number: 1 Comment Originated: 05/16/2016 05/16/2016: Secondary side of transformer installation will be the responsibility of the developer. Please have electrical engineer coordinate with Todd Vedder to ensure secondary side demand meets Light & Power standards. Comment Number: 2 Comment Originated: 05/16/2016 05/16/2016: Transformers cannot be located under the drip zone of any trees due to conflicts with roots. Landscape plans show several transformers under the drip zone of trees. Comment Number: 3 Comment Originated: 05/16/2016 05/16/2016: Please coordinate street light locations on City streets. Street lights must be 40' from shade trees and 15' from ornamental. Please show street lights on landscape plans. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 06/05/2016 06/05/2016: AutoTurn Exhibit Please provide an AutoTurn detailing all turning movements at corners with turning radius less than 25'. Comment Number: 2 06/05/2016: FIRE LANE SIGNAGE Fire lane signage needs to be added at the following locations: > West side of Andalusion St. > Calabrese St. on the east side of the Clubhouse. > Private drive side of Miles House Ave., west of Nancy Grey. > Unnamed drive south of Calabrese St. > Other misc. locations at the north side of site as per red lines. Comment Number: 3 Comment Originated: 06/05/2016 Comment Originated: 06/05/2016 06/05/2016: ADDRESSING Residential units should front a named street or have way -finding signage available at each intersection. The unnamed drive south of Calabrese St. has multiple buildings fronting it. This street should be named or have way -finding signage added. 4 Department: Environmental r1lanning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/03/2016 06/03/2016: To match the plans for Filings 2 & 3, Please label the Nancy Gray Wetland and the Native Upland Habitat Areas on all site, landscape, and utility plans that show those areas (e.g., LS100, LS104, LP100, LP104, OU1, U4, OG1, G4, DR1). Comment Number: 2 Comment Originated: 06/03/2016 06/03/2016: To date, the securities specified in the Filing 2 Development Agreement for monitoring, establishment, and weed control for the Nancy Gray Wetland and the native upland habitat area have not been received. These securities will need to be provided before a DCP can be released for Filing 4. In addition, annual monitoring reports for both the Nancy Gray Wetland and the native upland habitat area have not been received and will need to be provided, per the Wetland/Upland Mitigation and Monitoring Program included in the Filing 2 DA. Department: Internal Services Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 06/08/2016 06/08/2016: Please schedule a pre -submittal meeting with Building Services for this project. Pre -Submittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed buildings should be in the early to mid -design stage for this meeting to be effective. Applicants of new projects should email scarter@fcgov.com to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Comment Number: 2 Comment Originated: 06/08/2016 06/08/2016: Construction shall comply with adopted codes as amended. Current adopted codes are: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com/building web page to view them. Accessibility: State Law CRS 9-5 & ICC/ANSI At 17.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. M Comment Number: 5 Comment Originated: 06/06/2016 Topic 06/06/2016: There are a couple of low spots near the property boundaries where it transitions from public right of way. See redlines. Comment Number: 6 Comment Originated: 06/06/2016 06/06/2016: Include pavement removal for storyline at Yearling Road and Gooseberry Lane. There is a portion of storm pipe that will be installed within the public right of way. Comment Number: 7 Comment Originated: 06/06/2016 06/06/2016: Include Miles House Avenue as a private Drive in General Notes Comment Number: 11 Comment Originated: 06/08/2016 06/08/2016: Adjust the Sheet Index on the cover sheet to match the naming and order of the individual sheets. Comment Number: 12 Comment Originated: 06/08/2016 06/08/2016: Please update the Keymap on Sheet ST2. There are incorrect references. Comment Number: 13 06/08/2016: Add street name to Sheet U3. Comment Originated: 06/08/2016 Comment Number: 14 Comment Originated: 06/08/2016 06/08/2016: Label all onsite details as either on site only or private. Comment Number: 15 Comment Originated: 06/08/2016 06/08/2016: The wet utility service table is in the plans twice. Please remove one. Plat Comment Number: 8 Comment Originated: 06/06/2016 06/06/2016: With the ROW vacation approval process, portions of the ROW will need to be retained as utility easements for the existing sanitary and water lines/stubs. The Bucking Horse Filing Four Plat will need to show these easements as existing and/or vacated, since the ROW vacation process will occur prior to the approval of this development. Comment Number: 9 Comment Originated: 06/06/2016 06/06/2016: The plat needs to show where buildings will be located. A blanket easement can't be beneath buildings/structure (anything needing a building permit). Comment Number: 10 Comment Originated: 06/08/2016 06/08/2016: The Plat will also need to reference the ROW Vacation Ordinance and Reception number once the vacation is complete. K Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax /cgov. com/developmentre view June 9, 2016 Paul Mills RUSSELL & MILLS STUDIOS 141 S COLLEGE AVE SUITE 104 Fort Collins, CO 80524 RE: Bucking Horse Filing Four Mixed -Residential, FDP160023, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/06/2016 06/06/2016: The City has not received a submittal for the ROW Vacation needed with this development. Please see the following link for the ROW Vacation process: http://www.fcgov.com/engineering/pdf/VacationofRowinfo2011.pdf Comment Number: 2 Comment Originated: 06/06/2016 06/06/2016: The standard 9'6 Utility Easements behind the ROW will be needed along the Nancy Gray and G000seberry Lane frontage as well as a small portion along the northeast of Cutting Horse Drive. This should be shown separately from the blanket easements. Comment Number: 3 Comment Originated: 06/06/2016 06/06/2016: Emergency Access Easements need to be shown and labeled on the Utility Plans. Also indicate/show the blanket utility easements on Lot 1 and Tract A. Comment Number: 4 Comment Originated: 06/06/2016 06/06/2016: Private Drive signs need to be the specific street name, not just a general private drive label