HomeMy WebLinkAboutKING SOOPERS, MILLER BROS. FOOTHILLS SUB. - NON-CONFORMING USE REVIEW - 14-97 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY.r
HCS: Unsignalizad intersections release :.id Page
Center For Microcomputers in Transportation.
University of Florida
512 Well Hall
Gainesville, FL 32611-2083
Phu (904) 392-0378
Streets: (N-S) lc/ck access (E-W) w elizabeth
Major Street. Direction.._. EW
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 5/2%.•97
Other Information._....... am 1997 short long
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound
L T R L T R L T R
--- --- -- ---- ---I---- ----
No. Lanes 1 1 1 0 0 1 1 0 V 0
Stop/Yield N; NI
Volumes 52 662 892 32;
PHF .95 .95 .95 .95
Grade 0 0 '
MC's (%)
CV's (%)
PCE's ,1.10
------------------------------ ________________________
Adjustment Factors
Southbound
L T R
---- ---- -1--
68
.95 .95
0
i.10 0
_______________
Vehicle
Critical
Follow-up
Maneuver-
Gap (tg)
Time (If)
----------------------------------'-------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
I.50
3.40
HCE.: Unsiqnalized intersections Release 2.id Page
Worksheet for TWSC intersection
--------------------------------------------------------
Step 1: RT from Minor- Street NB SB
Conflicting Flows: (vph)
939
Potential Capacity: (pcph)
463
Movement Capacity: (pcph)
463
Prob. of Gueue-Free State:
0.8's
----------------------------------------------------------
Step 2: LT from Major Street
WE.
EF�
-------------------------------------------------------
Conflicting Flows: (voh)
9-1'
Potential Capacity: (pcph)
589
Movement Capacity: (pcph)
589
Prob. of Queue -Free State:
0.90
--------------------------------------------------------
Step 4: LT from Minor- Street
NB
56
________________________________________________________
Conflicting Flows: (vph)
1708
Potential Capacity: (pcph)
109
Major LT. Minor TH
impedance Factor:
0.90
Adjusted Impedance Factor:
0.90
Capacity Adjustment Factor
due to Impeding Movements
0.90
Movement Capacity: (pcph)
________________________________________________________
98
intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Vueue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sac/veh)
________ ______ ______ ______
Se, L 18 98
_______
45.0
_______ _____
0.7 E
---------
15.8
SB R 79 463
9.4
0.7 B
EB L 61 589
6.8
0.3 E
0.5
intersection Delay = 1.0 sec/veh
HCS: Unsiana-1ized In terseciions Release 2.1d Page 1
Center For Microcomputers in Transportation
University of Florida
512 Weil Hall
Gainesvilie, FL 32611-2063
Ph: (904) 392-0378
Streets: (N-S) lc./O: access (E-W) w eli-abeth
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 5/27/97
Other information....... .am pm 1997 short ( iona
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
' L T R L T R L T R L T R
---- -- - ---I---- ---- -- - I---- ---- '----
No. Lanes 1 1 0 0 1 1 ! 0 0 0 1 0 1
Stop/Yield N; N!
volumes 37 6-7 282 29: 23 20
PHF .95 .95 i .95 .95; .95 .95
Grade 0 0 0
MC' (%)
SU/RV" s (%)
Cv's (%)
PCE's :1.10 I1.10 1.10
---------------------------------- ------------------------
HCS--Unsignalized-Intersections---Release_1.id
Worksheet for TWSC Intersection
-------------------------------------------
St:ep 1: RT from Minor Street NE.
Conflic Ling Flows: (vph)
Potential Capacity: (pcph)
Mnvement Capacity: (pcph)
Prob. of Oueue-Free State:
--------
SteP 2: LT from Major- Street W6
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue -Free State:
____________________________________________
Step 4: LT from Minor Street NB
____________________________________________
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
-------------------------------------
297
979
979
0.98
EE
328
1196
1196
0.96
Ss
1012
275
0.96
0.96
0.96
265
Adjustmeni Factors
intersection Performance Summary
Vehicle
Critical
Follow-up
Avg.
95%
Maneuver
Gap (tg)
Time (tf)
Flow
Move Shared Total
Queue
Approach
__________________________________________________________________
Rate
Cap Cap Delay
Length LOS
Delay
Left Turn Major
Road
5-00
2.10
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
Right Turn Minor
Road
5.50
2.60
__.______
------ ______
______ ______ _______
_______ _____
_________
Throuah Traffic
Minor-
Road 6.00
3.3U
SE, L
26
265 15.1
0-3 C
Left Turn Minor
Road
6.50
_ 40
9.8
SE. P.
�s
979 3.8
0.0 A
EE L
42.
1196 3.1
0.0 A
0.2
intersection Delay =
0.5 sec/veh
•M1
HCS: Uns'ionaiized Intersections keleasa 2.Id, F'a qe
Center For Microcomputers In Transuortation
University of Florida
512 Weil Hall
Gainesville. FL 32611-2083
Ph: (904) s92-0378
Streets: (N-S) ks/kfc access (E-W) w elizabeth
Major Street: Oirection..". EW
Length of Time Analvzed... 60 (min)
Ana l vst.................... mid
Gate of Analysis.......... 5/27,/9
Other Information......... am pm 1997 short long
Twe.-way Stoo-controlled intersection
-_______--------------- _____---------- ________-------__
Eastbound 1 Westbound Nor'hbound Southbound
I L T R I L T R ! L T R L T R
No. Lanes 1 1 < 0 1 1 1 1 ; 0 : 1 1 0 > 1 1
Stop/yield N; N
Volumes 13 450 95f 258 676 26! 112 4 250 14 1 21
PHF .95 AS .95! _95 .95 .95! .95 .95 .95; .95 .95 .95
Grade 0 0 0 0
MC's (%)
SU/RV's (%)
CV' (%)
PCE's !1.10 '1.10 ;1.10 1.10 1.10:1.10 1.10 1.10
_______________________________________________________________________
Adjustment Factors
Vehicle
Critical
Follow-uo
Maneuver
Gap
(tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
0.00
330
Left Turn Minor-
Road
6.50
3"40
Hk,S: Unslnnclized intersections kelease 2-id page 2
Worksheet for TWSC intersection
--------------------------------------------------------
Sten is RT from Minor Street NE. S2.
Conflicting Flows: (voh)
524
712
Potential Capacity: (pcph)
75i
603
Movement: Capacity: (pcph)
751
603
Grob. of Oueue-Free State:
0.62
0.96
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--- ---- --- ------- --------- -
Conflicting Flows: (vph)
--- -
- -----_---
574
739
Potential Capacity: (pcoh)
913
762
Movement Capacity: ;pcph)
913
762
Prob. of Oueue-Free State:
0.67
0.98
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
- -- --- -- -- -- ----- ---- - - ----
Conflicting Flows: (vph)
-- --- -
- - -- - - --
1549
-- ----
--
1572
Potential Capacity: (pcph)
168
163
Capacity Adjustment Factor
due to impeding Movements.
0.66
O.66
Movement Capacity: (pcph)
111
107
Prob. of Queue -Free State:
0.96
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
S5
________________________________________________________
Conflicting Flows: (voh)
1534
1669
Potential Capacity: (pcph)
737
114
Major LT. Minor TH
Impedance Factor:
0.65
0.64
Adjusted impedance Factor:
0.75
0.72
Capacity Adjustment Factor
due to impeding Movements
0.70
0.44
Movement: Capacity: (pcph)
--------------------------------------------------------
96
50
intersection
Performance Summary
Avq_
95%
=low Move Shared
Total
Queue
Approach
Kate Cap cap
(Delay
Length
LOS
Delov
Movement (pcph) (pcph) (pcph)(sec/veh)
________
(veh)
(seciveh)
______ ______ ______
NB L 130 96 > 96
_______
864.6
_______
24.4
_____
F
---------
NB T 4 111 >
27q,2
NB R 259 751
7.8
--.i
B
SB L 17 50 > 52
104.8
1.4
F
SB T 1 107 >
47.3
SB R 24 603 _
6.?
0.0
B
EB L 15 762 -"
4.6
0.0
A
0.1
WB L 299 q13
,.9
i.i
B
1.6
Intersection Delay
=.
54.9 sec/veh
.I
Lin, ignali -er, I fit er'sec. ti ons Release e. Id
h'a ge 1
-=-=-__---__-_---.-.
HCz:: Iins Iona Iized Intersections Ral ease :.-id
Paae .
Center For Microcomputers. In Transportation
Lll"IIVer-SitV or Florida
51Z Weil hCll
Worksheet for IWSC Intersection
Gainesville, FL 3261i-2083
________________________________________________________
Ph: (904) 392-Oi176
Step 1: RI from Minor Street
__________________-____-________-___-___________________
NB
SEA
__._____.______.__.________________________________________________________
___________________________
Streets: (N-S) ksikfc access (E-W1
w elizabeth
Conflictina Flows: (vph)
654
247
Major Street Direction.... EW
Potential CaDAClty: (DCph.1
646
1011E
Lenqth of Time Analyzed... 60 (min)
_
Movement Capacity: (pcph)
646
1636
Analyst---------- -- --- -- mjd
Prob. of Oueue-Free State:
0.86
1.0 iI
[late of Analys. is .27 q7
Other Information......... am pm 1997 short
lone
'3teo 2: LT from Major Street
WE
EE.
Two-way Stop -controlled intersection
--------- -------------------------------------
______
Conflicting Flows: (vph)
676
248
Eastbound Westbound Northbound
Southbound
Potential Caoacity: (pcph)
817
1306
L T R L T P L T
R 1 L T R
Movement Capacity: (ocoh)
817
1306
,____ __-_ ____-___ ____ ____:____ ____
________ -___ ____
prob. of Queue -Free State:
0.91
1.00
No- Lanes 11 1 < 0 1 1 i 1 0 > 1
1 1 0 > 1 1
-----------------------------------------------""-----
StopJYield N; N;
Step -1: TH from Minor Street
NB
56
Volumes 2 599 43; 66 235 1; 29 1
65; 1 1 1
--------------------- ---------------------------------
PHF , .95 .95 .95: .95 .95 .95; .p5 .-.-
.95: .95 .95 .95
a
ConflictinFlows: (vph)
972
q94
Grade 0 G 0
0
Potential Capacity: (pcph)
;.3;
328
MC's (%:i
Capacity Adjustment Factor
SUJRV's
due to Impeding Movements
0.91
0.91
CV's (%)
Movement Capacity: (pcph)
305
297
PCE's ;1.10 '1.10 ;1.10 1.10
1.10:1.10 1-10 1.10
Prob. of Oueue-Free State:
1.00
1.00
----------------------------------------- -----------------------
------------ -------- -----------------------------
Steo 4: LT from Minor Street
NB
56
________________________________________________________
Conflictina Flows: (vph)
972
1006
Adjustment Factors
Potential Capacity: locc h_1
290
277
Major LT, Minor TH
Vehicle Critical
Follow-up
impedance Factor:
0.90
0.90
Maneuver Gap (to)
Time (tf)
Adjusted Imnedance Factor-:
0.9s
0.S,
________________________________________________________
Capacity Adjustment Factor
Left Turn Major Road 5.00
2.10
due to impeding Movements
V.92
V.82
F:ieht turn Minos- Road 5.50
2.60
Movement Capacity: 1pcon)
268
227
Through Traffic Minor Road 6.00
3.30
---------------------------- --------------------
Left Turn Minor- Road 6.50
3.40
_ntersa.-t,on Performance Summary
Ava
95<
Flow Move Shared Total
Queue
Approach
hate :,s_ :a Del
Delay,
Movement chi i. cph ...=chi(seciveh;
(veh)
(s -J -eh)
________ _____ ------ ------ --------
NE L 4 _ _ _ 5.4
--------- -----
---------
N P_. F.' 75 646 S.G
0-4
8
-
56 _ i 227 > ..,, 14.1
0.0
C
SB 1" 1 297 >
10.6
-
S6 R 1 1038 3.5
0.0
A-
EE 2 1306 Z_8
0.0
A
0.0
WE L 7o al: 4,y
G.:.
n
,.1
Intersection Deiay =
1.2 sec/veh
APPENDIX D
' ; - - i ce tionz R.' -.- -- —Id F'nue
HCc: Lin-,ia �ilized rn .er__c. ., cgs
Center- For M i crocompu r:ers In Transportation
University of Florida
512 Weil Hall
ainesville. FL 32611-2033
Ph- (904) 392-0'78
_ -- -
Sit er ts: (N-S) Ic/cl.: access. (E-Wr w elizabeth
Major Street Direction.... EW
Lenath of Time Analv_ed... Gil (mini
Anal_ vst........"........". mid
Date of Ana)ysis.......... 5/['/C�'
Other information......"..am om 1997 short long
Two-way Stop Intersection
_-----------------------------—_-___-_--__-_--__-__---__—___- —_
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes ! 1 1 0 ! 0 1 1 ; 0 0 o ! i 0
Stop/Yield N; N!
Volumes 52 615 823 32! 15 68
PHF .93 .93 .9`. .993 .933
Grade 0 0 0
MC's (%)
I
SU /RV's (%)
CV's (%)
PCE's !1.10 !i.10 1.10
_______________________________________________________________________
HCS__ Uns i ana l i zed_1 nter-ectionsRelease_ 2.Id___________________ F'.aae__
Work sheet for TWF.0 intersection
--------------------------------------------------------
Step 1: PT front Minor- Street Ne. SR
Conflici_ino Flows:
(vph)
885
Potential CaP&Clty:
(pCphl
493
Movement: Capacity:
(pcph)
493
Prob. of Oueue-Free
State:
0.64
-_.______________________________________
Step 2: Ll from Major
Street
_____________ __
Wb EE
________________________________________________________
Conflicting Flows:
(voh)
919
Potential Capacity:
(pcph)
625
Movement Capacity:
(pcph)
625
Prob. of Oueue-Free
State:
0.90
--------------------------------------------------------
Step 4: LT from Minor
Street
NB SB
______________________________________
Conflicting Flows:
(vph)
___
1619
Potential Capacity:
(pcph)
122
Major LT, Minor TH
impedance Factor:
0.90
Adjusted Impedance
Factor-:
0.90
Capacity Adjustment
Factor
due to impeding Movements
0.90
Movement Capacity:
________________________________________________________
(pcph)
110
Adjustment
Factors
intersection Fer'ormance Summary
Vehicle
critical
Fol)ow-uo
Avg.
95%
Maneuver
Gap ;tg)
Time (tf)
Flow
Move Shared Total
Oueue
Approach
__________________________________________________________________
Rat-
Cac Cap Delay
Length LOS
Delav
Left Turn Major
Road
=
'.lo
Movement
(ecph)
(pcph) (pcph),Lsec/veh)
(veh)
(sec/veh)
Right Turn Minor
.
Road
5. 5i:
2.60
________.
______
______ _____________
_______ _____
_________
,hrouah Traffic
Minor Road
6.00
SE'. L
18
110 39.1
0.6 E
Left iurn Minor
Road
e"50
t.4il
14"2
SE r:
80
45' E.1
U.6 8
EB L
62
625 6.4
0.3 'c.
0.5
Intersection Gelav =
G.9 sec/veh
HCS. Uns igne iized Inter sent ions Release :.id raae
Center For Microcornput.ers In Transportation
University or Florida
512 Weil Fall
Gainesville, FL 326li-2083
Ph: (904) 392-0378
Streets: (W-S) lc/ck access (E-W) w li-abeth
Major Street Direction.... EW
Length of mime Analyzed.. - 60 (min)
An a l vs t................... a1jd
Date of Anclvsis........ 5/27/97
Other Information ......... a rn Pm 1997 short long
Two-way Stoo-controlled Intersection
Eastbound Westbound I 'Nor+hbound I Southbound
. L T R . L T R , L T R , L T R
No. Lanes 1 1 0 ; 0 1 1 0 0 0 1 0 1
stop/Yield I NI N;
Volumes 37 554 262 291 23 20
PHF .93 .93 .93 .901 .93 .93
Grade 0 0 0
MC'. (%)
SU/RV's (%)
CV's (%)
PCE's II. 10 ;1-10 1.10
_______________________________________________________________________
HCS: Unsiannlized intersections Release 2.Id Paoe 2
-------------------------
Worksheet for TWSC Intersection
________________________________________________________
step 1- RT from Minor Street NB SCf
Conf'rictino Flows:
(vph)
"'82
Potential Cauac ity:
tocpn)
996
Movement Capacity:
(PCPh)
=96
Prob. of Oueue-Free
State:
0.98
____________________
titep <: LT from major-
------------------------------------------
____________________
Street
W:' tFi
Conflict -Inc; Flows:
(vph)
`I1°
Potential Capacity:
(pcph)
1216
Movement Capacity:
(PCph)
_
1216
Prob. of i)i.ieue-Free
State:
0.96
--------------------------------------------------------
Step 4: LT from Minor
Street
NE Ss
----------------------------------------------
Conflicting Flows:
(vph)
9'14
totential Capacity:
(pcph)
loc$
Major LT, Minor Tr
Impedance Factor:
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor -
due tc impedina Movemen
r-
0.96
Movement Capacity:
___________________________________._____________________
(pcph;
__-
Adjustment Factors
lnterseCtion Performance Summary
Vehicle
Critical
Follow-uo
Avc.
95°
Maneuver
Gap (to)
Time (tf)
'Tow
Mo':e .-...-cJ i " EIal
'__%L a u e
-.-:roach
__________________________________________________________________
-t-
o na
C'� ,[ t/c la `i
a'
__
I d'✓
�•t
__. Turn Major
Road
5.00
.10
.,,�..,
,o'en'ent (pcph)
(r r r n) i,cccn)(sec/veh)
� eh;
Rignt Turn Minor
Road
6. Sit
2. 6i-
________ ______
______ ______ _c_____
_______ _____
__-_____-
Thr-ouah Traffic
Minor
Road 6-00
3.50
S=• _ 28
_:- 13.j
0--
Left turn Minor
Road
6-50
3.4Q
24
Qzz
44
12i6 a.1
0.0 A
0.'2
interse-ti,n Vela. _
H.CS: Un_icnal!zed iiite sections keleo>r ..Id page
Center F orIhi r.-ocomputers in lransp n;-tation
Dim ver-r�tvoflo'lda
S I � Weil Hall
bninesville. FL 26ii-206i:
Ph:
U-e�t5: {N-Jj 1,5i1;'•: 6•_�._-_ (L-W) W elizabeth
Major S.raet Direction---- LW
Lerr:,th Time Ancl.. _v2ed. 60 :'min;
Arlalys t............... ... mid
Date of A.na"Ivsi_.......... Sj
Other info, -mat ion......... am iS97 sh or `. ionc
IWn-Wdl' jtop-controiled intersection
___-____ __
E--tbound Westbound Northbound Southbound
L R L T R L i' R L T R
No. Lanes 1 1 < 0 1 1 1 0 ? 1 I 0 ? 1
]too/Yield N! NJ '
Volumes 13 403 951 256 607 26; 1 i 2 4 250; 14 1 21
PHF .S3 .9c. .9i:' .9 _93 .93: .99 .93; .E., .93 .93.
Graf= 0 0 0 0
MC.
S(I;R\"s
CV' A)
PCE s ;1.10 '1.10 ;1.10 '1.10 1.10;1.10 1.10 1. 10
-----------------------------------------------------------------------
Adjustment Factors
\'eh icic
Cr itiCal
FC�)low-Up
Maneuver
Gap (tg)
Time (tfj
__________________________________________________________________
Left Turn MalOr'
koad
5.0;:
1.10
Rich'L Turn Minor
koaG
-.`_.
.60
Tnrouoh Traffic
Minor Road
S.VU
_eft Turn Minor
kvad
6.50
3.40
HCS: Unsionalized Intersect: ion. k.-'I case E.ld Pac_
worksheet for TWSC intersection
--------------------------------------------------------
Step kT from Minor _street NE. SB
Conflicting Flows: (vph)
43
65J
Potential Capa,ciiy: (ocph)1
646
Movement Capacity: (pcph)
'37
646
Prow. of Queue-� ec JLotc.
V.be
U. S'0
----- ._---------------- ___-------------------
Step 2: LT from major Street
______________
W`
EB
________________._______________-___.______________-______
Conflicting Flows: (vph')
S35
6'c1
Potential .:apacitY: (pcph)
S53
312
Movement Capacity: (pcph)
S'S-_
Siz
pros. of Queue --Free State:
0.6E
0.9E
--------------------------------------------------------
Step 3: TM from Minor- Street
NE
56
________________________________________________________
Conflicting Flows: (vph)
1456
1479
Potential Capacity: (pcph)
188
113
lapocity Adjustment Factor
due to Imped'i ny Movements
0.67
0.6'
Movement Capacity: (pcph)
125
122
Prob. of Oueue-Free State:
0.97
0.99
---------------------------------------------------------
Step 4: LT from Minor Street
iiF•
SB
..
________________________________________________________
Conflicting Flows: (vph)
1440
1578 -
Potential Capacity: (pcph)
i55
129
Major LT, Minor Tr1
impedance rac-tor:
0.66
0.65
Adjuster impedance Fortis:
0-72
Capacity Adjustment Factor
due to Imped'inc, Movements
..7i
0.45
Movement Capacit•r. (pcph)
________________________________________________________
ii0
56
intersectionn
Performance Summary
A JG.
95'
Flow Move jhar eG
TC tal
!;Ueue
Approach
F, a to Cap Cap
fcI'
_encth
LOo
Dela'J
Movement (pcph) (ec.phl (ocDn)(sEC%veil)
lveh)
(sec/veh)
________ ______ ______ ______
NE, L 132 -i i0 i10
_______
56`--'_1
_______
_____
---------
N.. 7 i25 ?
191.;
NB R 296 787
5B L 17 58 60
ES.�
i._
F
SE. T 1 122 ?
33.9
SF. k 25 646
5.8
0.0
6
Eft L 15 8i2
4.5
6.0
A
0.1
WB L 305 95;.
5. 6
i . 6
E•
.i .6
intersection Delay = 40_5 seC/veh
HC Un=i a I -I al iZed 1 ntersac t'i t- ns Releas= _.id Paa=
Center For Mi�rcc omGuter s. in. iransp or ration
University of Florida
512 Weil hall
Gainesville. FL. 3261i-2083
Ph: (904) 392-0978
{l e______
Streets: (N-b:) ks lk: fc ar c e-> =. E-ww iizabeth
Major Street Direction---- CW
L en ath of Tim- Ana lye ed _._ 60 (min!
Anal vst.............. m.jd.
Gate of An a lys i s . . . . . . . . . 51127/97
Other Inferrnation...... .-.am om 1097 short long
Two-way Stop -controlled intersection
_--__-_-__-
Eastbound Westbound Northbound Southbound
L T R 1 L T R L i H i L T R
No. Lanes 1 1 . 0 1 1 1 0 1 1 0 1 -i
Stop/Yield N; N;
Volumes 526 4=; 66 215 1: 29 1 651 1 1 1
PHF .9 .93 .9,; .93 .93 .93; .93 .9 .93: .95
Grade 0 0 00
MC' (%)
SU/RV's (%)1
CV's (%)
PCE's 11.10 1.10 11-10 1.10 1.10;1.10 1.10 7.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
------------------------------
Left Burn Major Roa;
High: Turn Minor Road
lhrouch Traffic Minor Road
Left lur n Mincr RJa-
Cri_icai
Foilow-u.
Gap (to)
----------------------------
Time (tf)
60
O0
.50
HUS: unslonalized Inters-cti on=: rielcase Id Pape 2
Worksheet for TWSC intersection
-----------------------------------------------
Step 1: r;T from Minor Street NB SB
Conilictina Flows:
Ivph)
i09
%31
Potent'ia"i I.aGarltV:
IU;-Gin1
896
1058
Movement Capacity:
(pcph)
606
1058
j'rob. of Oueue-Free
State:
U.89
1.00
________________________________________________________
Stec 2: LT from Major
Street
WB
EB
--------------------------------------------------------
Conflictina Flows:
rvph)
612
232
Potential Capacity:
(pcph)
676
1329
Movement Capacity:
(pcph)
676
1529
Prob. of Oueue-Free
State:
U- 91
1-00
--------------------------------------------------------
Step 3: TH from Minor
Street
NB
SE,
---------------------------------------------
Conflict:ing Flows:
rvph)
594
916
Potential Capacity:
(pcph)
370
361
Capacity Adjustment Factor
due to impeding Movement_.
0.9i
Movement. Capacity: (pcph)
337
Prob. of Queue -Free State:
i.00
-------------------------------------------
Step 4: LT from Minor Street
NE.
___________________________________________
Confli:tina Flows: ,'vain)
594
Potential Capacity: (pcoh)
921
Major LT, Mir•._- IH.
Impedance Factor:
0.91
Adjusted impedance Factor:
G.95
Capacity Adjustment Factor
due to Impeding Movements
0.93
Movement Capacity: (pcph)
-------------------------------------------
296
intersection Performance Summary
Ava. 95%
Flow Move Shared Total Queue Approach
Kate Cap Cap Delay Length LCU_ Delay
Movement (pcph) (pcph) (pcph)(s-c;vea) (yen) .�e: r�ehi
________ ______ ______ _____________ _______ _____ _________
tJ E:• L 34 298 299 i .6 0.4 C
NB T 1 8.
NB R 77 696 5.:. 0.4 E
SB
L
1
254 > 286 12.,
SE.
1
1
325 >
SE,
k
1
1058 11.4
EE
L
-
1c29 ...�
W5
L
75
676 4.j
Intersection Delay =
0.0 C
9.6
D.0 A
0.0 A 0.0
0.2- A i.l
1.2 seciveh
APPENDIX C
HC_: lnsinnalized Intersections Release '.1d Pacle
Center For Microcomputers in Transportation
University of Florida
512 Weii Hall
Gaine=vrille, FL 26i)-2052
Ph: (904)9(-0:E''6
Streets: (N- ) lc;'c 4: access (E-W) w eli-ab,th
Major Sitreet: O'irection.... EW
Length of Time Analyzed.-.. 60 (min)
Analyst ................... mjd
Data of Analysis.......... 5/2-1/9i
Other information .... ,.... am Cpm 199r short iono
iwn-way SLop-controlled Intersection
Eastbound Westbound Northbound `Jouth(oound
L T R L T R L T fi L T R
No. Lanes 1 1 C 0 1 1 O 0 0 I 0 1
Stop/Yield NNi
VC) 1umes 52 48-- SBA _ 15 63
PHF .9 - .9
Grade G 0 O
MC' s (A)
SU/RV's ('L)
CV' (`°)
PCEcs. 1.10 ii. 10 1.10
_______________________________________________________________________
HC'C,: Uns.ianalized intersections Release 1-id Faoe 2
Worksheet for TWSC Intersection
________________________________________________________
:tep 1: 1<T from Minor Street NB SB
LonflictinG Flows:
(vph)
645
Potential Capacity:
(pc:ph)
650
Movement Capacitv:
(pcph)
650
Prob. of Oueue-Free
Sta+e:
0.97
________________________________________________________
Stay 2: LT from Major
Street
EB
Conflicting Flows
--
(vph)
_ ___WB -- _ -_
664
Potential Capacitv:
(pcph)
509
Movement Capacity:
(ocph)
609
Prob. of Queue -Free
�.tate:
0.92
________________________________________________________
Step 4: LT from Minor
Street
NB SB
____________________________________
Conflicting Flows:
(vph)
_____
1261
Potential Capacity:
(pcph)
197
Major- LT, Minor- TH
impedance Factor:
0.92
Adjusted Imoedance
Factor:
0.92
Capacitv Adjustment
Factor
due to Impedlnc Movements
0.92
Movement Capacity:
________________________________________________________
(pcph)
131
Adjustment
Factors
lntersection 'Performance Summary
Veh4z-;e
cr4t: iCo1
Fn1104-up
Avg-
�5^
1N1&n as ver
Gap (tg)
-lime " )
_
r 10,
Move
Sna.-ed Total
Ouellg
Approach
_________________________________________________________________
Haig
Ca=
cap Da 1aY
LenGT_h LOS
0el ay
Left Turn Major
Road
5_00
22_10
Movement
(pcph)
(zcpn)
1p^-ph)(sec/veh)
(veh)
(sec/veh)
R inhi iurr� Min,-;-
Road
5.50
2.60
________
______
T nrouph Traffic
Minor Roac
6.00
6.3r
St. L
i=
i'.1
_�.[
0.+ 0
Lett iur-, M,.,,,-
...,a_
6.50
... 40
9.2
SF. ',
64
�50
6.4
0.5
Ec• L
64
5:.-
4,3
0. ,.
0.5
'ter z e-
'o Oglav =
Ii._ se: %veh
H C S— Unsignal iced Int-r-sections Relc--ase _.)d Page
Center Fa' M i;r, worwou tar s in Trdnsoor tat i of
[in iver-s itv of F'I or i d a
512 Weil Hall
Gainesville, FL 32611-2053
-------------- ====-=--- —=c___---_-_________— _
Jtr-aet (hl-S) Ic/ci. a',rr_: ( W1 w eli ZaD&d
hajor Street Direction.... EW
Length of Time Analvzed... 00 (min)
Analyst ................... mad
Date of Analysis......... 5/27/97
tither inf ormaf:ion._.......am Pm 1997 shor 1. long
Two-way Stop -controlled Intersection
—_------_-v--____.
____—_____--_--_-_-_______________. _____
Eastbound Westbound Northbound y'ou u thbond
i
L T R ; L T R L T R L T R
--- ---- --- -- ---- --- --- ---- ----
No. Lanes T 1 0 0 1 1 0 0 0 i 0 1
Stop/Yield N; NI
Volumes 37 365 192 29; 23 20
PHY .9 .y ,9 ,4! S' .9
Grade 0 0 0
MC's (A)
SU/RV's (A)
CV'- s
PCE's. ;1. iC 1-----------------------------------------------------------------------
. 1C I. iO
R C:= (h,s�gnai iced inter ,ec tion, Release 2.Id
------------
Worksheet for TWi,C, Intersection
--------------------------------------------------------
-5i-ep is PT i--om Minor NB SE
„ nf1iciIng Flows:
(vphi
2I
Potential C,,od_i tv:
(DcUh1
1050
M-vament. Capaci*y:
(ccph)
1060
Y r'Jb. of Qucue-Free
State:
0.96
-- ---- -- ------ --- -
Step 2: LT f-;-om Major
--------- -------------------.
Street
W5 Et•
________________________________
-------------------------------------------------------I
Confiictlnc, Flows:
(vph)
____ _-__I
24`
Potential Capacity:
(pcPh)
1310
Mov-m-nt Capacity:
(pcPh)
1310
Pr-Ob. of irueue-Free
State:
0.97
--------------------------------------------------------
Step 4: LT mom Minor
Street
NB SB
---------------------------------------------------------
Conflicting Flows:
(vph)
695
Pot_eofial capaoity:
(Pcph)
417
Majo;- LT, Minor TH.
impedance Fa, -tor-
G.97
Adjusted Impedance
Factor:
0.97
Capacity Adjustment
Fa.t-.-
due to Impedi n Mcverr.ent_
0.9i
Movement Capacity:
--------------------------------------------------
tPcph)
403
Adjustment
Factors
.ntersection
Performance Summary
Vehicle
Critic-'
Follow-up
Maneuver
lap (ta)
Time (tf)
.low
Mov-
shared Total
i4leue
Approach
__________________________________________________________________
Hots
i.aP
C. a C. Dei a
Length LGS
Delay
Left Turn Major
Road
p .F_ .�
i0
Movement
(ocph)
(pc ph}
(ecoh)(sec /veh)
(vehj
(sec/veh)
Right Turn Minor
Road
p
_
______
______
______ _______
_______
_________
Through Ti-affic
Minor Road
E•. UV
L
__
40j
0.1 b
Left iur-n Minor-
Road
_
6.7
SE. F
24
1066
.4
0.0 A
E5 L
._1
131C'
..5
0.0 A
0.2
Intersection
D-iaY =
0.6 sac/veh
F'agc
HCS 1ln_:ianaiized In+ersections uelease 2.id Pace
Center For Mi cr'ocomou tern in Tr a nsoortat ion
University of Florida
)12 Weil Hail
ua-inesvi'Ile. FL 32611-_0"0
Ph: l9041 392-i376
Street : (n;_Sl V_ikfc ac,ez3 (E-W) w :'I?zabeth
Ma tor- acr-eei. Direcij,,n.... EW
I-ength of -ime Analyzed... 60 (min"
Analvst................... mid
Oaf- o; Ana-lysis...-...... 5/227!97
Other information .........am 0, 1997 short ionq
iwo-wav Stop -controlled intersection
_________________________________________________________
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T p
-__ ____ ____ ___ ____ ____ _ ----
No. Lanes 1 1 0 1 1 1 0 i 1 1 0 > 1 1
Stop/Yield N; Ni
Volumes 15 `_102 82! 224 40-1 76; 9a 4 219; 14 i 2i
pHF .9 .9 .9I .9 .9 .y .9' .9 .9 .9
Grade 0 0 0 0
Su/RV's (%)
(-.V's !%)
PCE's iI i0 Ii. 10 :1.10 1.10 i. 10;1.10 1.10 1.10
_______________________________________________________________________
nd iustment Factors
Vehic le Cr t1C.ai . ,:,ll
Maneuver Gac T ir(,e
left urn Major 2aacl 00 2.i0
Rioht Turn Minor koad
Throuch TrHff!-- Minor- goad 6.UU
Lest iurr? Minn, koac
--- r-in:aicna l?sed intersect?ene: �elea _-- _.id
Worksheet for TW5C intersection
--------------------------------------------------------
S tec is RT from Minor Sireet NF: St
Con i:tino riuws: rvpn) J_ 440
Fete t ),-I Copari c lDc Dil l bi•' 66J
Mnvern ent Capacity: (p tph)-
r'ra;. of QUeUe-. ree State: 0.70 0 7
--------------------------------------------------------
S L 2: Li from Ma'or Street W6 EE.
--------------------------------------------------------
Confliciinc Flows: (voh) 42c 47)
Potential Capacity: (ocoh) i0i2 1018
Movement Capacity: (Pcph) i072 1018
Prob. of Vueue-Free State: 0.74 0.99
--------------------------------------------------------
Step n. TH from Minor Street NE S6
________________________________________________________
Confl ictiny Plows: i'YDhI 1120 11
potential CaDacity: (pooh) 252 6
Capacity Adjustment Factor
due to Impedino Movements C..7 0.7
Movement Capacity: Ipcoh) 20
Prob. cf pue.ue-Free State: E'.: LOE'
________________________________________________________
Step ». LT from Minor SL -eet �'E•
________________________________________________________
Conflictinq `lows: (von) 1104 izec
"Potential Capacity: (pcohl 4 206
Major" LT. Minor Tr:
Imoedarce Fa cor:
N!i juste� imDarcn_e rac-,or: _ t_`
Capacity A^�justment Factor
due to impedinc Movements 0.%7 0. )�
Movement Capacity: locphl 186 111.
--------------------------------------------------------
intersection rerforma.,ce Summary
}vq. iv
F iow Move Shared Total Crueue-Doroach
i'atc Cap Cap Velay r_c.•p'h Lt'°• l/e-lav
Movement ro'Onl 4PCOh_I (Dcph.1(1�civehi (veni I r%veh)
________ ______ ______ ______ _______ _______ _____ _________
NE L i 2 1 186 > 187 55-5 5.1 F
NE, T 4 207 > 21.6
Nn k 267 887 J.b
56 L 18 113 > 116 37.1 0.6 E
SR T 1 202 _ 18.1
5E is 25 825 4.
EF, L 15 i016 3.6 0.0 A 0.1
Wn L 274 10724.b 1_ -A 1.6
intersection belay = 6.2 seciveh
rac-
IC:._ 'Insion.sl -ems ,ntersections release ;c. race
Center For Mi•-r-ccomouters In Transoortation
(University of 'Iorioa
512 Weir Hal
6o'ineSvillE. FL +%61}-2G55
Ph: (`+G4)
---------- ______-------
____
_________________
E tree Ls (N-Si S/kt: aCCess (E-W) ., ellzaoeth
ma for feet Direc"on.... EW
Len:;th of Time Anal_yzed... 60 (min)
Analyst ................... mjd
Dat= of Analysis. .........
`i[7iv7
0iiher information. pm 1997 'short long
Two-wa( "tor, vntrellaG inomerse-tior,
______ _
Eastbound W-_tbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 1 < 0 1
tcaiYield N; N;
i
Volumes - -60 36: 59 152 11 28 i 62: l 1 1
PHF .9 S .9I .9 .9 .9! ._ .S .9! .9 _9 .9
Grace 0 0 0 0
MC's (4)
SU/RV's (A)
CV'_ (A)
PCE 's Ii.iO !1.i0 !1.10 i_10 1.10;1.10 1.10 1.10
-----------------------------------------------------------------------
djustment Faitcrs
vent: le
Maneuver
____________________________
cf'_ TLu'r, Me for Rpar1
Rl(;nt Turn Minor Road
Thr-oua'n Traffic Minor Road
Let T_ turn Minor Koa:
Critical
Follow-up
liao (tg)
Time !tf)
____________________________
5.00
10
5.50
2.60
6.00
.30
6.50
40
HCS: Unsionalized Intersections Release 2.Id Page
__________._______-______________._________
Worksheet for TWSC intersection
________________________________________________
St:ea I: RT from Minor Street NE• 3E
Conflictinc Flows: (vph)
21
109
Potential Capacity: (pcph)
647
11J7
Movement Capacity: (pcph)
64
1"137
Prob. of Oueue-Free State:
0.91
1.00
Step<LT from MajorStreet
-" -- -------------WE
Conflicting Flows: (•:phi
--------__--
442
?7O
Potential Capacity: (pcph)
i056
i42:
Movement Capacity: (pcph)
1056
142:
Prob. of uueue-Free State:
0.93
1.00
--------------------------------------------------------
Step 3: TH from Minor- Street
---
NP.
SE
----_---------------------------------
Conflicting Flows: (vpn)
--
659
--
679
Potential Capacity: (pcph)
492
48C
Capacity Adjustment Factor
due to impeding Movements
0.93
i�,•'
Movement Capacity: (peon)
457
;,rob. of Vueue-Free State:
.00
__________________________ _____________�_UV
Step 4: L T from Minor- Street
_________-_V_
NE
SE.
-----------------------------------------------
Conflicting Flows: (vph-!
660
694
Potential Capacity: (pcp.n.
439
420
Majr- _, Mina- Tin
impedance Factor:
0.9:
:.'3
Adjustec impedance =---�cr:
0.94
0,94
Capacity Ad ILIStment vazcr
aue tv imoedinu Movement=
0.94
0.86
Movement Capacity: (peon"1
________________________________________________________
4'l4
Jpl
intersection Performance Summary
Avp.
5J"
=1v.<
Movezt,narEd
Total
VuEuc
AGprpoCh
Rate
Cat
Cap
Delay
Leng to
L0..
Da lay
Movement
________
(pcph}
______
(pcpn)
______
(ccoh)(sec/veh)
______
_______
(veh)
_______
r,sec iyen )
NE'.
L
34
4 i 4
415
_____
_________
NR
1
457
6.2
NP.
R
76
847
4.7
0.2
A.
SE,
i_
1
361
3a9
=. i
0.0
6
jE.
1
i
44C.
7. i
_ _SE,
R
1
1137
EE
1.
_
14 23
_
0.0
A0.0
WE.
L
�.
1056
.7
0.1
A
?.n
intersection Delay = 1.1 seriveh
APPENDIX B
133
51
I
CEDA2uwo�\ .
__.._------ ...�---
III
4-o
2?gI
I K)
I
MATTHEW J. DELICH , P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Observer 0�
INTERSECTION OF
TABULAR SUMMARY OF VEHICLE COUNTS
Date 5 o q7 0ay—r4V PSbA V Clty F6 e T COL L ? 5 R - Rignt turn
_S stmigm
�--� J �` � � AND I L -Lett turn
TIME II
BEGINS
II R
>C
tmm NORTH
I S I L I Total
from SOUTH
II R I S I L I Total 11
N°rt'h
sotJth
tram WEST I TEm
II R I S I L I Totes II west
TOTAL
ALL
tmm EAST
I R I S I L I Total
7130llo1
0101
0.
11231019132i1
3Z1101
711515Z111oIio311111411 1G(o11-1?
74cil"101
1 ^
1114101?,12211
Z.Z11o1?41Zo14411/01921o1/0?111':rZ11174-
Jr> II O
i
I
I <=
Ilt�� I
o
14 I Z 211 ZZ 11
1 1451101 5-6 1110 1 '�51 0 1 4�' 11 15 ( 11 / 73
IRr. 11-.-)I
I
I ,L,
II it
(,;)17I
4- 11 1¢II014(a11416011SI74.1/
I 31114311167
it
I
I
17
II 1
1 I II II
1 1 I II i I I II II
173�)-`riwi 11 �7
1^
1
I o
11 Z I
o
17,21 9 O 11 q0 11
1 1152 16 121 211: ? 13&o 1 2 14 o 011(o I Z117 O Z
II
I
I
I
II I
I I II II
I I I II I I I II II
II
I
I
I
It (
I I it II
I I I II I I I II II
II
I
I
I
II I
I I 11 II
I I I II I I I II II
II
I
I
I
II I
I I II II
I I I II I I 1 II. II
II
I
I
I
II I
I I II it
I I I II I I I II II
II
I
I
I
II I
I I it II
I I I II I I I II II
II
I
I
I
II I
I I II II
I I I II I I I II II
42all6-I
c,
1 4
I 13
11551
Z
161 SZ 11 9 1 II
3 1 g '13 8 IIZ (o11191 & 1 ZI 869 II Z!Z ll303
44s 11 &
I o,
I 1
1 7
11471
O
17,51 73 11 'S0 II
G 1 r001(o31 1IIZ► 1 77 1 5110 3 11 O 7Z 11 3s0
soo 113
1 ") I
G
I 9
115-71
1
1151 73 11 ?Z II
71 9311o111& II?_1I 701 1 1 9Z IIZs311 35
15 II 7
1 0 13
1 /6
1157I
1
134-1 �4- 11 1oQ. 111b11231(DZ1
i 9!5'IIZZI Sol sll/ 7 1131 Z 1141(0
II
I I
I
II I
I I II II
I I I I i I I II Ii
4o_5 •ll61
1 0 1141
35
112171
4
197132Z1135-7
12-,11o11ZZ¢I(051117
1,20z11513T� 11/04911/4-0<o
MATi'HEW J. DELICH , P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
/.- n
OGaerver J 4 C% Date 5/6Day -4f 0 P = f.-F1 Ofty !- O lr -- �% £- V I AJ S R = AipM turn
S = Stmigm
INTERSECTION OF L l r'rLtF �.'ASRjE', k J AND b) �L r r� %` L = Lett turn
TIME
BEGINS
TOTAL
NORTH tmm SOTH Nomn
II
R I S I L I Total II R I S I L I Totai i1 Soutn '
FAST
I fom I
I R I S I L I A °mil II
fmm II TOTAL
=satfrom
R I S I L I Total II I"'�ALL
TOTAL
A
1 5 1 13 11 I
I I li II I 1 I II
I 1141 If li.
714
ob I
I I 11 Il�dl t i II
I itZ1 li II
o0111
IZI 7 II 1
1 1 it II Z1 1 1 II
1 1 I 11 II
1c61 511 5 1
I 1 1 3 11 1
i 1 II II ca I I I it
I 131 II II
II I
I I ►I I
I � it II I I I II
I f I II II
73o-R7,rjI71
IZ31 4' 11
1 1 1 II
1 I 71 II II
II I
f I II I
I I II fl I I I II
I I I II II
II I
I I II I
I i it II I t i II
I I I II II
II I
( I II I
I I II II I I I it
I I I II II
II I
I I II I
I I II Il I I I II
I I I II II
II I
I I II I
I I II II I I I II
I I I II II
II I
I I II I
I I II it I I I II
I I I Ii I
II I
I I II I
i I p II I I I II
I I I II II
3 010 7 I
IZI t 9 II I
I I II II 41 1 1 11
1 1 ct 1 11 II
445111'a 1
1 s 1 z 311 1
t I p II 101 1 1 11
1 1121 II II
60011 !?1
1 3 1 2011 1
1 I II 71 1 1 11
1 1 9 1 II 11
515w 161
I SI 21 II I
I I II il�ol I I II
I Il l II II
II I
I I II I
I I �I II I I I II
I I I II II
if,�-I 6 3II 1
I
I II
II3ZI I
I II
1 164 II II
11
APPENDIX A
0 D CD
/Ii 1
m
1 /26 0rn
/258 66N 0
r- /258 W. ELIZABETH
2/13 --/ f 37/52 - �
599/450 N 0 627/662
43/95
CLo
N W
Cedarwood
Plaza
�- 29/32
�— 7R7 /R
AM / PM
LONG RANGE PEAK HOUR TRAFFIC
Figure 3
Table 3
Short Range Peak Hour Operation
Intersection
W. Elizabeth/Cedarwood/KFC (stop sign)
NB LT/T
NB RT
SB LT/T
SB RT
EB LT
WB LT
W. Elizabeth/Little Caesars (stop sign)
SB LT
SB RT
EB LT
Level of Service
AM PM
C F
B B
C F
A B
A A
A B
C
A
A
Table 4
Long Range Peak Hour Operation
E
B
B
Level
of Service
Intersection
AM
PM
W. Elizabeth/Cedarwood/KFC (stop sign)
NB LT/T
C
F
NB RT
B
B
SB LT/T
C
F
SB RT
A
B
EB LT
A
A
WB LT
A
B
W. Elizabeth/Little Caesars (stop sign)
SB LT
C
E
SB RT
A
B
EB LT
A
B
CD
ll
0 0 0
/j 1
m
"k-1/26
215/607
N
/-- 66/258
IN
W. ELIZABETH
2/13 --)0(
) } r
37/52 -
526/403
N \�0
554/615 i
43/95 --�
m
�
N �
Cedarwood
Plaza
AM/PM
N
SHORT RANGE PEAK HOUR TRAFFIC Figure 2
N
Table 1
1997 Peak Hour Operation
Intersection
W. Elizabeth/Cedarwood/KFC (stop sign)
NB LT/T
NB RT
SB LT/T
SB RT
EB LT
WB LT
W. Elizabeth/Little Caesars (stop sign)
SB LT
SB RT
EB LT
Table 2
Trip Generation
Level of Service
AM PM
B F
A B
B E
A A
A A
A A
B D
A B
A A
Daily
A.M.
Peak
P.M.
Peak
Land Use
Trips
Trips
Trips
Trips
Trips
in
out
in
out
1. Existing Retail
230
3
2
11
11
5.654 KSF
2. King Soopers Expansion
1360
15
6
57
55
10.819 KSF
3. Net Increase in Trips
1130
12
4
46
44
f'
q
N
m
cli
1 /26
0 0 0
--w - 152/401
/— 59/224
2/13
360/302 —�
38/83 --,.
o
ca
N N
(.D
Cedarwood
Plaza
m
00Lo
to
or)
N IN
W. ELIZABETH oj
37/52
385/483
29/32
-192/51
AM / PM
1997 PEAK HOUR TRAFFIC
Figure 1
necessary left -turn storage cannot be attained for afternoon peak
hour traffic volumes. These volumes probably extend to other hours
of the day beyond just the afternoon peak hour. Since over 200
feet of westbound left -turn storage is required approaching
intersection A, side -by -side left -turn lanes could not be
accomplished between intersections A and B. Therefore, it is
recommended that the City consider limiting intersection B to
right-in/right-out only. In order to effectively make this work,
all the properties on the north side of West Elizabeth Street
should be interconnected. At the present time, there are barriers
to this interconnection. The City may also want to consider
placement of a median on West Elizabeth Street that will positively
limit the turns at intersection B. There appears to be adequate
width to accomplish this. This recommendation regarding the
geometry on West Elizabeth Street and the turn limitations is not
related to the proposed King Soopers Store expansion. Approval of
the expansion should not be financially tied to the suggested
improvements on West Elizabeth Street. They are offered as a
solution to an existing concern that will be exacerbated by future
development on the north side of West Elizabeth Street.
The Cedarwood Plaza Shopping Center and the King Soopers
Store, in particular, are adequately served by pedestrian, bicycle,
and transit transportation modes. Expansion of the King Soopers
Store will not significantly change the operation at the West
Elizabeth Access to Cedarwood Plaza.
horizontal curves on West Elizabeth Street, west of Taft Hill Road.
West Elizabeth Street varies in width in this area from 60 to 65
feet.
There are bike lanes on West Elizabeth Street. These bike
lanes vary in width from 3 feet to 5 feet. There are sidewalks on
both sides of West Elizabeth Street. There are no gaps in the
sidewalks adjacent to Cedarwood Plaza. Transfort serves Cedarwood
Plaza with Routes 2 and 3. Route 2 travels eastbound on West
Elizabeth Street at 30 minute headways. Route 3 travels westbound
on West Elizabeth Street at 30 minute service. There are stops on
both routes that are convenient for Cedarwood Plaza.
Table 2 shows the trip generation expected from the expansion
of the King Soopers store. This information was calculated using
factors contained in Trip Generation, 5th _Edition, ITE. Line 1
shows the trip generation for the existing retail store that will
be incorporated into the expansion. Line 2 shows the trip
generation for the total expansion area. Line 3 shows the net
increase in trip generation due to the expansion.
The newly generated trips were assigned to the access to West
Elizabeth Street. Due to the location of the King Soopers Store
within Cedarwood Plaza, it is expected that most of these patrons
would use this access. Based upon casual observation, this access
is the primary access to Cedarwood Plaza. Background traffic was
obtained from the "Jefferson Commons Student Apartments Site Access
Study," July 1995. This study also contained traffic forecasts for
other future developments between Taft Hill Road and Overland Trail
that would likely contribute traffic to West Elizabeth Street.
Figure 2 shows the short range
traffic at the key intersections.
operation at the key intersections.
in Appendix C. Operation will
conditions. During the afternoon
turns/throughs will be delayed.
Figure 3 shows the long range
traffic at the key intersections.
operation at the key intersections.
in Appendix D. Operation will
conditions. During the afternoon
turns/throughs will be delayed.
(year 2000+) future peak hour
Table 3 shows the peak hour
Calculation forms are provided
be similar to the existing
peak hour, minor street left
(year 2015) future peak hour
Table 4 shows the peak hour
Calculation forms are provided
be similar to the existing
peak hour, minor street left
Operation at the key intersections will be similar to most
stop Sign controlled intersections along arterial streets in Fort
Collins. The West Elizabeth/Cedarwood/KFC intersection may
approach meeting signal warrants. However, due to its proximity
to Taft Hill Road, it is not a good candidate for signalization.
Signals are not recommended at this location.
Of larger concern to the City is the geometry on West
Elizabeth Street. As stated earlier in this memorandum, the
co
M
u�
o v
CO CO
• o
LO
O 6
o cD
a cn
O p
O r
• X
Q
o u
z
J
w
O
J
• �p
w
> N
O
z T
w p
a
z w
w z
'Jn
V
N n
N
N
W
a: Z
z
w
W
z
U
Z
J w
W o
0
0
a
CL
a
cc
W a3
U
LL
a
cc
Q ~
TO: 0. C. Larson,
Michael Bray,
City of Fort
FROM: Matt Delich
DATE: May 29, 1997
MEMORANDUM
King coopers
Architect
Collins
SUBJECT: Expansion of the King Soopers Store in Cedarwood
Plaza traffic study (File: 9730MEM1)
King Soopers is proposing an expansion of their store in
the Cedarwood Plaza Shopping Center in Fort Collins. The
total expansion will be 10,819 square feet. A portion (5,654
square feet) will come from an existing store to the south.
The remaining area (5,165 square feet) will be new building
area to the south of the existing store. The scope of this
traffic study was discussed with City staff.
Peak hour traffic counts and field investigations were
conducted in early May 1997. The peak hour traffic counts
along West Elizabeth Street are provided in Figure 1. Raw
traffic count data is provided in Appendix A. Appendix A also
contains dimensioned sketches of the geometry along West
Elizabeth Street, west of Taft Hill Road. The two key
intersections are labelled A and B for easy reference in this
report. City staff concerns were largely centered on the
geometry in this segment. Table 1 shows the operation at the
two key intersections along West Elizabeth Street. Operation
is generally acceptable. Minor street left-turns/throughs
operate at levels of service E and F during the afternoon peak
hour. This is primarily a function of the traffic on West
Elizabeth Street itself, rather than related to the actual
turning movements. Calculation forms for these analyses are
contained in Appendix B.
The area of primary concern is between intersections A
and B. The distance between these intersections is 170 feet
on centers. in this area, two end -to -end left -turn lanes are
provided on West Elizabeth Street. The westbound left -turn
lane approaching intersection A is 56 feet long. The
eastbound left -turn lane approaching intersection B is 60 feet
long. Using the conventional "rule of thumb" of one foot
storage per left -turning vehicle during the critical peak hour
(afternoon) results in the following desired storage
requirement:
Westbound - 225 feet
Eastbound - 55 feet
Clearly, this could not be accomplished with end -to -end left -
turn lanes. The geometry is further complicated by the