Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK-CELESTICA - PDP - 12-97A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSCelestica Colorado Statement of Planning Objectives Celestica achieves several principals and policies of the City Plan. Located within the Harmony Corridor Zone District, the project incorporates site planning that work within the Harmony Corridor Design Guidelines. The project will develop within the standards and guidelines of the plan and will continue the District's vision to provide industry and a strengthened economic base while remaining compatible with community values. The Celestica property is located within the Fort Collins City Limits. The land uses. proposed in Celestica are all permitted uses within the approved Harmony Technology Park ODP and the H- C District. The project will include approximately 20 percent office and 80 percent manufacturing facilities. The existing `Harmony House' structure will remain and be incorporated into the overall plan. The project will be developed in phases. Phase One is estimated to develop 209,000 SF of gross floor area and 550 employees. The second phase of the project is anticipated to add an additional 200,000SF and add an additional 550 employees. The manufacturing shift will operate in 3 shifts with some overlap in shift end times and shift start times. The development of the Celestica property will incorporate improvements to Harmony Road and County Road 9 providing a vital link in the pedestrian and bicycle connections along the Harmony Corridor. Since the City of Fort Collins plans `Enhanced Transit' for the Harmony Corridor, a transit facility and shelter may be provided as a part of this development. The exact location of this transit facility will be developed in coordination with Transfort. An 80' landscaped buffer conforming with the Harmony Corridor Plan will be included and will provide a continued link in the overall vision of the `Harmony Oaks' landscape design concept. The buffer area will provide screening from parking areas by incorporating berming and planting with an integrated pedestrian recreation trail. Appropriate landscape buffering will also be incorporated along County Road 9 to provide screening from any interior site parking. The site generally slopes from northwest to southeast. Stormwater runoff will be conveyed by means of grass -lined drainage swales in landscaped areas where possible to allow greater infiltration, slower runoff rates, and reduced overall runoff volumes. Stormwater will be .conveyed by this method or along interior streets in a northwest to southeast direction. Interim detention will occur within each development parcel. Site outfall will occur near the historic low point of the property near the southeast property corner. The Celestica Site plan will meet City policies requiring inter -connectivity by providing three initial access points, two along CR9 and one. along Harmony Road. Each of these access points will connect to arterials or collector streets which ultimately will connect with surroundings land uses. Celestica Colorado August 18, 1997 Mii timodal Transportation Level of Service Manual US Staodank for Dsvekrpataet Review - $icpcle Figure 7. Bicycle LOS Worksheet 1 P2 speck connections to priority sites: description of applicable destination area within 1.320' including address 9ety e,&i%T- AICxAR ti E 14 AIPU A-f Ci29 WILL Wcoo F-ARIA n SEw -r°"i SyR.tF3tos G1� tiw 6�A2�+ouv/er�1 destinatim area classification (see text) CoA4mFI2V AL j eC45itsN-r►AL I eoM,�a,-CIA f- F u of level of service - connectivity ly inn �010101' p. 20 C z Q 8(KG�' C_ A." tr e je 9 atKG- LM04 C 29 $►rea L.4auE C29 15 jjt� _ 6 JAW6 HA(L.40•,)Y PAS /3I XG- LAti6 City of Fort Collins Transportation Master Plan 4 COAJOr(AUUI -ry OASI=D U Oti ASSUXAVirto•uS CA4-lovC> AAj CGLGS'r! cA Ooe-o,et4tJo 130 (t<bS -31 DGw4t_,<s A b J A c. GN -r -r o s I T6 ) T,yCti TNC.,ee5- Wte-C.r (3 r- C 04) 'ri OU U 0 U s Sys 7-C- A4 d. C�sA ��GrLI-p(:AAjrIAG 1LbWcrok> QNlb frk6SsrOAIJ'�llwsys m C' ,fib SS C �e cF- @ S, Gaa A L AT 144RAe-60WI c le q L.a .i cr� C o r3 C ,e R - ee q/T.rrgc4y2cJop 4 4ANG k-j' .,•a C D 1.1,I� 2, 'f�c-'wLE'rT-VAGtcAk'P� • CRo35 CRq -@ S16OUAL- AT /-{a2$L4CAJV1ceq AAj e G"A C. AT 11AR cav f-/2,e q LA.V65 :a CoS E3 I 31 c•uAC, AT 9A.emdoUV/CP i 4, Yomr�lo� Co6'f . sir, AjA c- - e re 4 G.4.0U&-s .. C o S i3 • Sr G a� ac.. - f�A1�M O�Y - � Ls�a1� S .: � O� F VI50A t� �N re ee, r /iQ A« �r�GCT3 �s� ovw►�c.�- � �U►GT -ra e�'rY SrpS, 1 ` • %t3 ScCuRr ��' ALLr 5" 2eFrs/si bScOALCS f3U►c.r ro C?irY rb5 A f c-DESrfzlArV Los ,-suMPY'(v•t)s S YM FSIOS CQG/ C W t(.C. COA4 Pca7'�r 5/Oc`w,cc.KS AU J ACGtir To -rqG- e-rc;7 CCR9 PAePAomj • !��'C �; ro.V l.o=til"Cs'IQ . l.JILC. C/ ONt('c-t�7't;� `.a/�Ewnr~.KS A D a A C. tr ti T To - H t re; ("c 2 9 $c IVAgP4o-VY� A b,lAr.6z;tiT To -rg& try . (fC R (I"') • II64lCA:T'r-PAC►_.AR-4 LJlcL /3utIo.-u �A i, r S. (AL- op (2 2 9 W t t- L) Ooeb A km) Alm — /. O Aceoss C le?f L05 A 2, MewL&rr-PACCAeb Alm - /. o Ac 20 Ss ItAleMOX9Y K.4Ab • �o g A �. Pee5TOAJ ,4/,t4 - ,6 A ,e o s s C' /z Los � 4, Sy,,,iera`� lark e •� C /'1 i i )i—i i i i i i—i dJN i ry —vice Manual P. is Multimodal Transportation Level of Se l.os st&n"fds for Development Rem* - Pe&=iae Figure 6. Pedestrian LOS Worksheet Fu TU 2 project locationcl'ccfs�rioar 4-•;ri-J �L�; cf` CFuTufLCs� (enter as many as apply) daQifltion of sea i area j level of service (minimum based on project location clasifiotwn) mom area within '� ! i csa�iireslion d.. bKjuding ao� 1 I ism tat) —w j �, III c ��IAL actual PeEs-o,�,-f.W.neR«s� ` �posed I A I A 3 A -6l � ruruQQ', —I"- IKWJ ®�1�1�1'�i� • "" 01 �'llDlt�l� �i �■�i�i�i�i� City of Fort Collins Transportation Master Plan h y,€kcil"c�"eptabIV,level of service is achieved for pedestrian and b cycae modes based upon fort�Collins measures in'the'multi-modal tr�ansportat'fon 'guidelines,f" The signal at the Harmon Hewlett- -. Packard West Access willprov,id'e for convenient pedestrian access �� betwee4n the Harmony}'�j,Tecfin'ology : Park and the ,Hewlett-Packard faciL.ity In the* short r6 ge future, the,only reasonable transit service for Celestica wrCo,l`orado, -.would be an extension of the South`sridep%hut�tle '''This wou"'ld provide peak hour service as it currentlyesfor`Hewlett-Packard. In the long range future, transit service will be a B. 25 assumption that the area streets will be built to Fort Collins standards, the bicycle level of service will be in the A category. The Bicycle LOS Worksheet is provided in Appendix H. Transit,Level of Service Currently, the only transit service in the area is the Southside Shuttle. It is logical that this specialized service be extended from its current terminus, at Hewlett-Packard, to the Celestica Colorado site. With just this transit service, the LOS will be the same as the existing LOS E. Long range future level of service will be at LOS B. This was discussed in detail in the ODP transportation study. IV. CONCLUSIONS This study assessed the impacts of Celestica Colorado on the short range (2000) transportation system in the vicinity of the proposed development. As a result of this analysis, the following is concluded: The development of the Celestica Colorado site is feasible from a traffic engineering standpoint. At full development of this facility, approximately 3220 trip ends will be generated at this development daily. - With the current peak hour traffic, all key intersections operate acceptably, overall. There are delays for minor street .left turns at stop sign controlled intersections along Harmony Road. There are no pedestrian, bicycle, or transit facilities adjacent to this site. The Southside Shuttle serves Hewlett- Packard to the north of this site. There is very little pedestrian or bicycle activity at the existing intersections near this site. - Using the short range background traffic volumes, overall operation will be acceptable at all key intersections. As with the current operation, some minor street left turns will experience delays at stop sign controlled intersections along Harmony Road. - A signal will be warranted at the Harmony/H-P West Access/ Technology intersection. Using the existing traffic plus the site generated traffic, all key intersections will operate acceptably. Using the short range total traffic forecasts, operation will be acceptable at all key intersections. The recommended geometry is shown in Figure 10. 1 24 street can either be striped to indicate the geometry shown in Figure 10 or it can be striped with more lanes. The geometry shown in Figure 10 indicates that Harmony Road has a four lane cross section with auxiliary lanes. It is expected that the westbound left turn approaching Technology Parkway will be built to the ,length required in the ODP transportation study. The lane lengths shown in Figure 10 are minimums, recommended with just development ,of Celestica Colorado, Phase 1 and background traffic. If longer lanes are built, there will be no operational concerns. Pedestrian Level of Service There are or will be five applicable pedestrian destinations within a quarter mile of Celestica Colorado. Two currently exist: the Wild Wood single family residential area, west of CR9; and Hewlett-Packard, north of Harmony Road. Three are future developments, which either have approved plans or are in the development process: Preston Townhomes, west of CR9; Preston Center, west of CR9; and Symbios Logic, northwest of the Harmony/ CR9 intersection. The Celestica Colorado site is in a designated future activity center at/near the Harmony/CR9 intersection. The level of service determination assumes that future developments will build their streets in accordance with Fort Collins Standards. This being the case, then pedestrian facilities will exist where they currently do not. This is a reasonable assumption. The Pedestrian LOS Worksheet and back up calculations are provided in Appendix H. The minimum level of service for activity centers is B for all measured categories. This will be met or exceeded to all identified destinations. It will be difficult to cross Harmony Road as a pedestrian without benefit of a traffic signal. The Hewlett-Packard West Access is considered to be the main entrance to this facility. This location is also central to the Harmony Technology Park and, as such, would be considered to be the main access also. This intersection is expected to be signalized within the study time frame. With a pedestrian phase at this signal, as well as, at the Harmony/CR9 intersection, pedestrian crossings of Harmony Road will be safe. Bicycle Level of Service The Harmony Technology Park is located in a future activity center. Four locations are identified as destinations for bicyclists: Hewlett-Packard, Wild Wood Farm, future Preston Center, and future Symbios Logic. They will be directly connected to the site via the future Harmony Road Arterial Bike Lanes, which have been identified by Fort Collins staff as being funded, and existing and future bike lanes on CR9. Therefore, with the 23 Hewlett-Packard .. N 3� ® X" x< 1 (170'-220')+T HARMONY `J (5(Y-70')+T ROAD (250'-340)+= + � (270'-360')+T + -� 450'+T N N } 0 3 OY TIMBER- I I+ = oR�-� Celestica Z¢ ow wooD +�: �, �r Colorado �OR �� / -� - 0 Ln c a 0 o: Legend: = Lane T = Taper SHORT RANGE GEOMETRY Figure 10 22 J I D I Table 5 Short Range Total Traffic Operation Intersection Harmony/CR9 (signal) Harmony/H-P West/Technology (signal) CR9/Timberwood/Site Access (stop sign) EB LT EB T/RT WB LT WB , T/RT NB LT SB LT Overall u 21 Level of Service AM PM C C B C B A A A A A C A B A A B Table 4 Existing Plus Site Traffic Operation Intersection Harmony/CR9 (signal) Harmony/H-P West/Technology (signal) CR9/Timberwood/Site Access (stop sign) WB LT WB RT SB LT Overall 441 Level of Service AM PM B B B B A A A A A A A A Tab 1 e .3 Short Range Background Traffic Operation Intersection Harmony/CR9 (signal) Harmony/H-P West Access (stop sign) SB LT SB RT EB LT Overall CR9/Timberwood (stop sign) EB LT EB RT NB LT Overall Level of Service AM PM B B F F* A B C B A D A B A A A A A A * Calculated delay greater than 100 seconds. i&I March 1991, allows for future traffic signals at the existing Hewlett Packard East Access and County Road 7. The plan did not consider additional signals. The results of this analysis indicated that the additional signal at the Harmony/Technology Parkway intersection would not have a detrimental effect on traffic progression along the Harmony Road Corridor. City staff is currently pursuing an amendment to the "Harmony Corridor Plan." Efforts are also underway with the Colorado Department of Transportation to break the Deeded Access Line at this location. Operations Analysis Capacity analyses were performed on key intersections adjacent to and near the Celestica Colorado site. The analyzed intersections were suggested in the scoping meeting with City staff. The analyses correspond with the traffic forecasts shown in Figures 6, 8, and 9. The Harmony/H-P East/Cambridge intersection was not analyzed since the only volumes that will change are the through volumes on Harmony Road. This intersection should be analyzed in future PDP transportation studies when this intersection is used to access the Harmony Technology Park. Using the background traffic volumes shown in Figure 6, the key intersections operate in the long range condition as indicated in Table 3. Calculation forms for these analyses are provided in Appendix E. Overall, the key intersections will operate acceptably. There will be delays to minor street left turns in the afternoon peak hour at the stop sign controlled Harmony/H-P West Access intersection. Using the traffic volumes shown in Figure 8, the key intersections operate in the existing plus site traffic condition as indicated in Table 4. This operation reflects a signal at the Harmony/H-P West Access/Technology intersection. Calculation forms are provided in Appendix F. Overall, the key intersections will operate acceptably. Using the traffic volumes shown in Figure 9, the intersections operate in the short range total traffic condition as indicated in __. Table 5. Calculation forms for these analyses are provided in Appendix G. All of the key intersection will operate acceptably. Geometric Analysis The geometry at the various intersections was analyzed using the short range total traffic forecasts and analyzed operation. The recommended long range geometry is shown in Figure 10. At the Harmony/CR9 intersection, the geometry is determined by the operation of the intersection. CR9 may be constructed to a width that could provide more lanes than indicated in Figure 10. The 18 a a Hewlett-Packard . mm 3� 0 0 O 225/440 2 � �— 75/15 CD h N f 880/1480 — Z o—1170/1760 /r— 115/160 HARMONY) + /—50/30 235Y100 —� } 265/25 1425 11 �n �n in 1295/1230 105/120 --4 0 0 165/100 Ln rn Y)lO M _3 DY to Celestica =Q 0 \Lo^ �NOM130 Colorado wa TIMBER- "' INI ^ E' WOOD � 5/5 110/210 f r NOM. o Ln n 5/20 —� `CL/1 L/111/1L M) u ' SHORT RANGE TOTAL PEAK HOUR TRAFFIC ROAD N M O_ o—135/20 —1275/1670 /� 5/5 110/15 -j) } r 1205/1320 iz.!P14Z 5/5 -� Ln o Ln AM / PM Rounded to the Nearest 5 Vehicles Figure 9 17 E-1 cd i Hewlett-Packard Ze m� LO CD LO 0 0 o ��, 205/435 o o 75/15 '" "' �" 725 1130 Z 910/1290 �- 30Y5 HARMONY + /—50/30 175Y45 -� + 265/25 - f 1180 925 o to o 1005 995 o -i o 65/65 ul� o c 165/100 Z N N N LO L� G a 0 m !/ / /7T7TI!/� Oa �i _J3 V OY Celestica xa �t- 505130 Colorado Fa �r J `CC11.L/111/1L� N LO r� O 135/20 oto + 1015/1200 ROAD + /—5/5 110/15 ---") } I 915/1085 - L o Ln 5/5 --� to o an AM / PM Rounded to the Nearest 5 Vehicles EXISTING PLUS SITE GENERATED PEAK HOUR TRAFFIC Figure 8 1F i 0 �� -16/57 r') Ln f- 26/98 27/29 101/58- r 56/51- o d O TIMBER_ WOOD Hewlett-Packard f 26/24 HARMONY �— 49/27 ROAD 9/29 � re 164/96 - I n� �7 fv-=17/717=11i�, ' oa _3 OY Celestica =a 40/126' Colorado wa 1 /3 !i �}— v l SITE GENERATED PEAK HOUR TRAFFIC AM / PM N Figure 7 15 A& R Hewlett-Packard A' m ' V 3 UJ _< _< vow �o r�i o 0 0 CO `D 205/380 f 850/1380 to o 15 - 135/20 0—1180/1610 /-- 85/130 175 HARMONY f---1125/173o ROAD + /_5/5 235 100- � f r 265/25 110/15 1320/1030 to o 0 1280/1200 1175/1240 50/70 - y co N vo 5/5 Ln o Ln ^ N o � 0 0 TIMBER - WOOD j 110/210 5/20 -� o Ln CN tn o� M AM / PM Rounded to the Nearest 5 Vehicles SHORT RANGE BACKGROUND PEAK HOUR TRAFFIC Figure 6 14 'L.J traffic was increased using various traffic studies cited earlier. For the PDP transportation study, the level of development reflected in the "Fossil Creek Reservoir Area Plan," March 1997, 'was not considered. This is a significant development that, if approved, would not likely be very far along in the time frame considered in this study. Peak hour background traffic is shown in Figure 6 Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figure 7 shows the short range peak hour site generated traffic with access as shown on the proposed site plan (Figure 4). One full movement access is proposed on Harmony Road. This is the public street access that is named Technology Parkway. While Cambridge Drive will continue to exist across from the Hewlett-Packard East Access, Cambridge Drive will not be connected to the Celestica Colorado site. Therefore, no traffic was assigned to this site access. As mentioned earlier, two accesses are proposed to CR9. The south access is expected to be primarily for service vehicles and trucks. No peak hour traffic was assigned to this access. Figure 8 shows the existing plus site generated peak hour traffic at the key intersections., Figure 9 shows the short range 'total peak hour traffic at the key intersections. This is the sum of the site generated and the background peak hour traffic. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. Using the traffic volumes shown in Figures 8 and 9, it is likely that Warrant 11, Peak Hour Volume signal warrant will be met at the Harmony/H-P West Access/ Technology intersection. This warrant will be met during the afternoon peak hour. It is also likely that Warrant 2, Interruption of Continuous Traffic and Warrant 10, Peak Hour Delay would also be met. Signal Progression An analysis was conducted in. the ODP transportation study to determine if the proposed signal at the Harmony/Technology Parkway intersection would impact future traffic progression along the Harmony Road corridor. Signal progression refers to the movement of through traffic along a roadway with no stops. Currently, the "Harmony Corridor Plan," prepared by the City of Fort Collins, if 13 If 0 M I Ln N 45%-50% _ 1 HARMONY ROAD Celestica o Colorado a A Q j LO I 0 20%-25% 0 TRIP DISTRIBUTION Figure 5 Land Use Industrial Portion - 700 employees (2 shifts of 350 each) Office Portion - 200 employees Total Table 2 Trip Generation Daily A.M. Peak P.M. Peak Trips Trips Trips Trips Trips in out in out 2340 235 45 215 258 880 95 13 15 78 3220 330 11 58 230 336 primarily be used by employees. The south access to CR9 is a service access that is intended to be used primarily by trucks. It is expected that this access will not be used very much during the peak hours. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information, prepared by the Institute of Transportation Engineers (Trip Generation, 5th Edition), and interviews with project team staff and consultants were used to project trips that would be generated by the proposed uses at this site. Table 2 shows the trip generation at full development of the Celestica Colorado site. Land use code 130 (Industrial Park) was used for the manufacturing employee count and land use code 750 (Office Park) was used. for the office/ administrative employee count. The mix of uses is similar to the existing Hewlett-Packard facility to the north. Since the 700 manufacturing employees will work on two shifts with some overlap in the afternoon, the trip generation as calculated from the reference document was adjusted. The adjustment resulted in higher trip generation. In the ODP transportation study, trip generation for the Hewlett-Packard facility was calculated and compared to current counts. The calculated peak hour trip generation was approximately 30 percent higher than actual counts. This difference is likely caused by transportation demand management and alternative modes. This was applied to the ODP transportation study trip generation. However, since some transportation demand management options may not be available to partial development of the Harmony 'Technology Park (phase 1 of Celestica Colorado), no adjustments were made to the trip generation in this PDP 'transportation study. Trip Distribution The directional distribution of the generated trips was determined for the Celestica Colorado site. This distribution depicts a short range condition. The distribution was determined based upon a gravity model analysis and was confirmed by City staff. The trip distribution is shown in Figure 5. Background Traffic Background traffic is defined as the traffic that is and/or will be on the area streets that is not related to the proposed development. Future analysis year was 2000 (short range). This is a developing area of Fort Collins and, as such, the traffic increases are largely dependent upon land development. Background 10 C e N 0 Q .. NO SCALE } 3� C MBERW OOC DRIVE (Proposed) OHfNHHHH�ffNHHHfO �� nunuumunnuuuun SITE PLAN I Figure 4 Bicycle Facilities There are no identified bicycle facilities currently along Harmony Road, however, there are wide shoulders on both sides of Harmony Road. Given the amount of bicycle activity observed !' (provided in Appendix A), these shoulders were judged to be ' adequate. In the scoping meeting, staff indicated that the City has secured funding to provide bicycle facilities along Ilarmony Road. With implementation of this capital improvement project, I' bicycle facilities along Harmony Road will be adequate. There are bicycle lanes on the north leg of CR9. There are no bicycle facilities on the south leg of CR9. Given the current motor vehicle traffic on the south leg of CR9, bicycles can safely integrate with other traffic. Bicycle activity was very low on CR9 in the peak hours. This area currently falls into the city-wide minimum LOS level. There are two existing destinations, H-P and Wild Wood in the area. The bicycle LOS worksheet for these destinations is provided in Appendix D. There is reasonable connectivity to bicycle lanes on CR9, north of Harmony Road, and to the wide shoulders along Harmony Road. Transit Facilities Transfort currently serves this area of Fort Collins (Hewlett- Packard, in particular) by the Southside Shuttle Route. It only runs during the peak hours on weekdays. It has 70 minute headways. The east terminus is. the Hewlett-Packard facility and the west terminus is near the Drake Crossing Shopping Center. It provides direct transfer capabilities with Routes 1, 5, 6, 7, and 10. The existing transit service in the area would be defined as level of service E. III. PROPOSED DEVELOPMENT Celestica Colorado is a proposed office and manufacturing complex in the southeast quadrant of the Harmony/CR9 intersection in Fort Collins. Figure 4 shows the ODP site plan. This site will be developed in phases covering a 3-8 year program. Figure 4 shows three access points to the existing public street system, one access to Harmony Road and two accesses to CR9. The access to Harmony. Road is Technology Parkway, a public street. In the ODP traffic study, this intersection was shown to be signalized when warranted. The main access to the Celestica Colorado site will be from Technology Parkway. The Celestica Colorado driveway is located approximately 650 feet south of Harmony Road. The north access to CR9 is the secondary access to the site. It will 11 N 6�R F,Q HORSETOOTH ROAD , N O O h HARMONY ROAD 1 O 1 1 O� 0 1 O� O m ♦ a W of Legend: Z w 1. Hewlett-Packard o 2. Symbios Logic (future) ~ 3. Preston Center (future) 4. Preston Townhomes (future) 5. Wiidwood COUNTY ROAD 36 1" = 2000' PEDESTRIAN STUDY AREA 7 Figure 3 Table 1 1997 Peak Hour Operation Level of Service Intersection AM PM Harmony/CR9 (signal) B B Harmony/H-P West Access (stop sign) SB LT F F SB RT A B EB LT B B Overall A A Harmony/H-P East Access/Cambridge (stop sign) NB LT/T/RT C D SB LT/T E F* SB RT A B EB LT B B WB LT A A Overall A D * Calculated delay greater than 100 seconds. M ® o N N N --187/378 -- 696/1028 - 3/16 12,054 17X43 } 1076 865 - �\ 8/10 —)� n rn to 10 10 tD no 13 2622 —� 1004 927 —y / i Site 1 N Hewlett-Packard O eh 131/17 5 HARMONY i � — 0�8/1213 1328 ROAD 1 110/11 - } 903/970 — 1 — /2 o cq Legend: AM / PM .Daily RECENT TRAFFIC COUNTS s Figure 2 Existing Motor Vehicle Traffic Peak hour traffic flow at the key intersections is shown in Figure 2. These counts were obtained in 1997. Raw traffic count ' data is provided in Appendix A. The traffic counts indicate a higher eastbound directional split in the morning peak hour and a higher westbound directional split in the afternoon peak hour on Harmony Road. Daily approach volumes at the Harmony/CR9 intersection are also shown in Figure 2. These counts were obtained by the City of Fort Collins in September 1996. Existing Motor Vehicle Operation Table 1 shows the operation at the key intersections during the peak hours. Calculation forms are provided in Appendix B. Appendix C describes level of service for signalized and unsignalized intersections from the 1994 Highway Capacity Manual. Overall, the key intersections operate acceptably. During the peak hours, minor street left turns experience some delays at the stop sign controlled intersections. Pedestrian Facilities There are no pedestrian facilities along either Harmony Road or CR9 adjacent to this site. H-P has budgeted and intends to build a sidewalk along their frontage of CR9. The Celestica Colorado site is within 1320 feet of the Wild Wood residential area and the Hewlett-Packard industrial/office campus. It is also within 1320 feet of the proposed Symbios Logic site and the proposed Preston Center commercial area. Figure 3 shows the pedestrian study area and the designated pedestrian destinations. Pedestrian activity at the key intersections was counted. Three pedestrians were observed at the Harmony/CR9 intersection in the morning peak hour. One pedestrian was observed at the Harmony/West H-P Access in the afternoon peak hour. There was no pedestrian activity observed at either of the other peak hour or at other intersections. Pedestrian counts are shown in Appendix A. There are sidewalks within Wild Wood and within the Hewlett-Packard facility. There is a pedestrian button at the Harmony/CR9 signalized intersection. There are no cross walks at this intersection. There is a median refuge area in Harmony Road, but there is no auxiliary pedestrian activation button in the median. A pedestrian LOS worksheet is provided in Appendix D. The analysis determined the LOS from this site to the existing uses within 1320 feet of the Celestica Colorado site. Later in this report, a pedestrian LOS analysis will be provided for future land uses and improvements to the pedestrian system. 4 I SITE LOCATION 1" = 3000' N Figure 1 3 II. EXISTING CONDITIONS ' The location of the Celestica Colorado site is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily agricultural, industrial, institutional, or residential. Residential and institutional uses exist to the west of the Celestica Colorado site across CR9. The I institutional uses are Preston Junior High School and a psychiatric hospital. The residential use is a single family residential area known as Wild Wood. There is an industrial use (Hewlett-Packard) to the 'north of the site. East and south of the site are agricultural and large lot residential uses. Land is essentially flat adjacent to the site. The center of Fort Collins lies to the northwest of Celestica Colorado. Roads The primary streets near the Celestica Colorado site are CR9, Harmony Road, and Cambridge Drive. CR9 is west of the site. It is a north -south street designated as a minor arterial north and south of Harmony Road. Adjacent to the site, it has a paved two lane cross section. North of Harmony Road, CR9 is paved to a width of 70 feet. Specifics of the short range future cross section of CR9 will be addressed in this study. The long range future cross section of CR9 was addressed in the ODP transportation study. There is a signal at the Harmony/CR9 intersection. QHarmony Road is a four lane state highway, designated as a major arterial. Harmony Road has an interchange with I-25. In the vicinity of the site, the cross section consists of two lanes in each direction with a grass median. There are right- and left -turn lanes at most intersections, including CR9. In the future, Harmony Road is expected to be widened to six through lanes. Cambridge Drive is a north/south local street, intersecting with Harmony Road approximately 0.50 miles east of CR9. It currently serves a few single family residential units on the east side of Cambridge Drive. Cambridge Drive is directly across from the east access of Hewlett-Packard. Hewlett-Packard also has an access approximately 0.25 miles east of CR9. Both of these accesses are stop sign controlled, full -movement intersections. 1 2 I. INTRODUCTION This transportation impact study addresses the capacity, geometric, and control requirements at and near the proposed Celestica Colorado site, located within the Harmony Technology Park PUD near the Harmony/CR9 intersection in Fort Collins, Colorado. This transportation study addresses the project development plan (PDP) issues at the initial phase of development of the site in the short range future (year 2000). The long range transportation impacts were addressed in the "Harmony Technology Park Overall Development Plan Transportation Impact Study," May 1997. This approach was discussed with and agreed to by the Fort Collins Traffic Engineer. During the course of the analysis, numerous contacts were made with the project architect (Young & Wright), the project planning consultants (BHA Design and Blackfox Commercial Real Estate), and the project engineering consultant (Sear -Brown Group). This study generally conforms to the format set forth in the Fort Collins Transportation Impact Study Guidelines. The study involved the following steps: Collect physical, traffic, and development data; Perform trip generation, trip distribution, and trip assignment; Determine peak hour traffic volumes and daily traffic volumes; Conduct capacity and operational level of service analyses for all pertinent modes of transportation; Analyze signal warrants; Analyze signal progression. This report is prepared for the following purposes: Evaluate the existing conditions; Estimate the trip generation of the proposed development; Determine the trip distribution of site generated traffic; Evaluate level of service for all modes of transportation;. Determine the geometrics at key intersections; - Determine the impacts of site generated traffic at key intersections. Information used in this report was obtained from the City of Fort Collins, the planning and engineering consultants, the future site users, research sources (ITE, TRB, etc.), and field reconnaissance. The following traffic studies were reviewed and considered in preparing this study: "Symbios Logic Site Access Study," April 1996. "Hewlett-Packard Company Traffic Study," December 21, 1995; "The Preston Center at Wild Wood Site Access Study," November 1995; - "English Ranch Site Access Study," August 1995. 1 LIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Traffic Counts ................................ 5 3. Pedestrian Study Area ................................ 7 4. Site Plan ............................................ 9 5. Trip Distribution .................................... 12 6. Short Range Background Peak Hour Traffic ............. 14 7. Short Range Site Generated Peak Hour Traffic ......... 15 8. Existing Plus Site Generated Peak Hour Traffic ....... 16 9. Short Range Total Peak Hour Traffic .................. 17 10. Short Range Geometry ................................. 22 APPENDIX A Recent Traffic Counts B Current Peak Hour Operation C Description of Level of Service D Existing Pedestrian and Bicycle Level of Service E Background Traffic Operation F Existing Plus Site Traffic Operation G Short Range Traffic Operation H Future Pedestrian and Bicycle Level of Service 1 TABLE OF CONTENTS Page ' I. Introduction 1 II. Existing Conditions .................................. 2 LandUse .............................................. 2 Roads 2 Existing Motor Vehicle Traffic ....................... 4 ' Existing Motor Vehicle Operation 4 Pedestrian Facilities 4 Bicycle Facilities 8 Transit Facilities ................................... 8 III: Proposed Development ................................. 8 TripGeneration ....................................... 10 ' Trip Distribution .::::..........................••... 10 Background Traffic 10 TripAssignment ...................................... 13 SignalWarrants ...................................... 13 Signal Progression 13 Operations Analysis 18 GeometricAnalysis ................................... 18 1 Pedestrian Level of Service .......................... 23 Bicycle Level of Service 23 Transit Level of Service ............................. 24 IV. Conclusions .......................................... 24 LIST OF TABLES Table Page 1. 1997 Peak Hour Operation 6 2. Trip Generation ................................. 11 3. Short Range Background Traffic Operation ............. 19 4. Existing Plus Site Traffic Operation ................. 20 �" 5. Short Range Total Traffic Operation .................. 21 CELESTICA COLORADO I PROJECT DEVELOPMENT P____. TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO AUGUST 1997 Prepared for: Young & Wright, Architects Inc. 172 St. George Street Toronto, Ontario, Canada M5R 2M7 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 I17T PLAN SHAPE: ARCHITECT: STATE ID NO.: SLR1573 Unknown ORIGINAL OWNER: SOURCE: Henry A. Ziegler SOURCE: B. T. Brown BUILDER/CONTRACTOR: Unknown THEME(S): SOURCE: Early High Plains Farming and Irrigation to 1900 CONSTRUCTION HISTORY (DESCRIPTION, NAMES, DATES, ETC., RELATING TO MAJOR ALTERATIONS TO ORIGINAL STRUCTURE): CONTINUED YES X NO HISTORICAL BACKGROUND (DISCUSS IMPORTANT PERSONS AND EVENTS ASSOCIATED WITH THIS STRUCTURE): This house was built about 1900 by Henry A. and Martha L. Ziegler. Henry Ziegler was born in Iowa in 1858 and came to Colorado in 1881, living in various parts of the state before his marriage to Martha Luella Maxwell in Denver in 1892. Martha Ziegler was born in Ohio in 1861 and cane to Colorado in 1892. The Zieglers lived in Denver for three years before coming to Fort Collins in 1895 and establishing a farm in the Harmony Agricultural District. The Zieglers lived on their farm for 20 years before moving into the city of Fort Collins. Like other farmers in the area, the Zieglers raised cattle, sheep, corn, alfalfa, and barley. Ziegler later rented the house to William Bender. Later the house was awned by the Webster family, who owned a number of farms in the vicinity of Fort Collins. CONTINUED YES X NO SIGNIFICANCE (CHECK APPROPRIATE CATEGORIES AND BRIEFLY JUSTIFY BELOW): ARCHITECTURAL SIGNIFICANCE: HISTORICAL SIGNIFICANCE: REPRESENTS THE WORK OF A MASTER ASSOCIATED WITH SIGNIFICANT PERSONS POSSESSES HIGH ARTISTIC VALUES X ASSOCIATED WITH SIGNIFICANT EVENTS OR PATTERNS X REPRESENTS A TYPE, PERIOD, OR METHOD OF CONSTRUCTION CONTRIBUTES TO AN HISTORIC DISTRICT STATEMENT OF SIGNIFICANCE: This house is significant for its association with the development of agriculture in the vicinity of Fort Collins, having been one of the farmhouses established in the Harmony district around the turn of the century. The house is architecturally significant due to the integrity of its design, craftsmanship, materials, location, and setting. The house is representative of the Edwardian Vernacular style in its asymmetrical massing, two-story corner porch, bay windows, and cross -gables with diamond -shaped windows. Notable details include the brick construction, with brick extending to eaves without break; the evenly coursed, rusticated stone foundation, and the stone window sills and lintels. The large scale of the house makes it a local landmark. CONTINUED YES X NO REFERENCES (BE SPECIFIC): Fort Collins Planning Department, Historic Preservation files; Larimer County Assessor; Ben Preston, Fort Collins, Colo., Telephone Interview, May 1992; B. T. Brown, Fort Collins, Colo., Telephone Interview, May 1992; Carol Turner, "Harmony Historic Structures Report," City of Fort Collins Historic Preservation Office: Fort Collins Courier, 15 February 1921 and 22 February 1932. CONTINUED YES X NO L SURVEYED BY: R. L. Simmons/T. H. Simmons AFFILIATION: Front Range Research Associates, Inc. I DATE: June 1992 �COLOPADO HISTORICAL SOC:=" Office of ArcnaeoIogy anp i,;toric Preservat;on 1300 Broadway, Denver, ._,,:rioo 80203 HISTORIC BUILDING IN\,ENi!;RY RECORD I II PROJECT NAME: For; Collins Survey of Historic Places, 1992 I CURRENT BUILDING NAME: Harmony House ADDRESS: 3105 E Harmony Rd. Fart Collins, Colorado 110525 r HISTORIC NAME: Ziegler Farm 11 DISTRICT NAME: FILM ROLL NO.: lA NEGATIVE NO.: NOT FOR FIELD USE Eligible _ Nominated _ Det. Not Eligible Certified Rehab. Date ZO NTY: CITY: STATE ID NO.: 5LR1573 Larimer Unincorporated TEMPORARY NO.: 11 OWNER: K 8 M Company 3201 Shore Rd. Fort Collins, CO 80524 TOWNSHIP 6N RANGE 68W SECTION 04 NW 1/4 NE 1/4 U.S.G.S. QUAD NAME: Fort Collins, Colo. YEAR: 1960 (PR1984) X 7.51 151 BLOCK: N/A LOT(S): N/A ADDITION: N/A YR. OF ADDITION: N/A LOCATION OF NEGATIVES: DATE OF CONSTRUCTION: City of Ft. Collins Planning ESTIMATE: 1900 ACTUAL: SOURCE: Larimer County Assessor USE: PRESENT: �,,ye� Residence HISTORIC: Farmhouse f STORIES: 2 SQ. FOOTAGE: 2960 ARCHITECTURAL DESCRIPTION: Large, two-story brick house with hipped roof and cross -gabled sections; cut away corner on northwest. Widely overhanging eaves with modillions; wood shingle roofing. Cross -gables have pent roofs and diamond -shaped windows with Queen Arne panes. Two story porch at intersection of gables has corner entrance, brick pillar supports, and solid brick porch walls with stone trim. Two paneled and glazed doors which open onto porch have heavy stone lintels; wood paneling around entrance. Facade has two-story bay window with stone sills and lintels. East elevation has two-story bay window with 1/1 light windows with stone sills and lintels. Also on east elevation is circular window on second story. Two story bay window on west. Raised, evenly coursed stone foundation with basement level windows- Brick chimney. One story frame porch &RN�� Y� D? YES X NO ADDITIONAL PAGES: YES X NO STYLE: Edwardian Vernacular MATERIALS: Brick, Wood, Stone CONDITION: EXCELLENT X GOOD FAIR DETERIORATING EXTENT OF ALTERATIONS: X MINOR MODERATE DESCRIBE: CONTINUED TES ORIGINAL SITE x MOVEC DATE(S) OF MOVE: NATIONAL REGISTER ELIGIBILITY INDIVIDUAL: X YES CONTRIBUTINd TO DISTRICT: YES LOCAL LANDMARK DESIGNATION: No NAME: DATE: ASSOCIATED BUILDINGS? X YES TYPE: House/Outbuildings IF INVENTORIED, LIST ID NOS.: MAJOR X NO NO NO NO 1 _ .0 t Celesti ca ;fills in. blaP ks on timeline, obs,� Electronics company has designs on 600,000 sq. feet, 2,100 workers SrROBEWr SAUN The tolvadoan i, - Since declaring in April its Business plans to come to Fort Col- lins, Celestica Colorado Inc. Celestica7s goals: had left two questions unan- 'W Build 200,000 :square swered. feet Of lnanufacturin� g and How soon? And hojj7_ office 'sp'aCe)JjFj!1S.titVting many? I ' . � ? P I,ofits Campus. The How soon 6uld the elec' Pmjcet would allow foj'up to tronics anmanufacturing ' y -18 assemb] _Iimk_riejjV, ing py start 0 Phase- I would 4 . i�- up _11;-i�n corporate campus in and , lo .;January Janua b rt Collins? And many 1999. At that time, Celestica jobs would the company gen- -Colorado,"' -' ., - , would employ erate? ` I 1,200, inclilding 1000 pro - On . Monday, a Celes'tica� ­.'duction jobs and, 266 support executive bTought clarity to Positions.: (Curr9tly,',Celes- both questions. tica employs about 450 in ,1Speaking at the fall meet- Fort Collins.) ing of the Fort Collins Eco- 'N Phase 11 would include nornic Development Co another 180 000 feet. Genera A target daj� =0%t set, 'Joe Mixsen set rp� r iration" Celestica Gene imanager r out,. but employment would a Project timetable. reach 1,700,,,u " , I copople In the end, the company bkon. could build a 600,000- 11 P? III requires the i square -foot plant — or 4, " Purcl*�J of anadditional16 roughly half the size Of acres, W166 Celestica will Hewlett-Packard's Fort Col- have under option. The final lies pus — and employ phase calls for, anothei 1 2,100 people. 200,000, square feet and irt As planned, Celestica will employment total of 2,100. soon buy 32 acres of develop- Of course, "the 'physi( al ment land along East Har- growth depends on business mony Road, directly across growth, of which Celestica the street from HP. seems confident. And contingent upon city Celestica's . niche* is con- -approval, the company will tract manufacturing for break ground on the new large electronics corpo- ,plant in January, MixseU rations, including HP. That said. In outline form, here are See CELESTICA, Page AS Job Markets Predict Real Estate Activity Jobs are a "leading indicator" of real estate activity. Watch the rise or fall of the job market and you'll see the real estate market follow in about six to eighteen months. The following table shows the growth rates for various job markets in Colorado. The figures are calculated as of June of each year. Source: Colorado Economic Chronicle. Job Market Growth Rates 1997 1996 Job Market Growth Rate Growth Rate Change Larimer County 5.7% 4.2% +1.5% Weld County 2.9% 5.8% -2.9% Boulder County 3.8% 3.1% +0.7% Denver Metro 1.8% 3.5% -1.7% El Paso 3.7% 7.1% -3.4% Northern Colorado Employment Remains Strong Northern Colorado continues to see strong employment growth and declining unemployment rates. Here are the unemployment statistics for July, 1997 and a comparison to a year ago. Unemployment Statistics July'97 July'96 State of Colorado 3.1% 4.3% Larimer County 3.0% 3.9% Weld County 3.7% 4.9% Fort Collins 3.2% 4.2% Loveland 2.8% 3.7% Greeley 3.8% 5.0% Source: Colorado Department of Labor and Employment Who Is "Celestica"? Northern Colorado has a new major employer - high tech manufacturer Celestica. Who are they and what are their plans in Colorado? Celestica is a private company that once was a part of IBM. They are headquartered in Toronto, Canada, employ 5500 people worldwide, and have annual sales of $2.6 billion. Recently, they purchased a part of Hewlett-Packard's manufacturing business and are currently located on the Fort Collins H-P site. Celestica plans to move across the street (Harmony Road) into H-P's new 155 acre technology park as soon as their 200,000 square foot manufacturing facility can be completed. According to Fort Collins Economic Development Corporation, Celestica plans to employ 300 to 400 full time high tech manufacturing workers and another 300 to 400 part-time. r PROJECT DEVELOPMENT PLAN . LANDSCAPE PLAN HARMONY TECHNOLOGY PARK F I R S T F I L I N G CELESTICA COLORADO G.di. SUMET s ov s AUGV T f6. i99T RCV. O 9= M roVl OARUM OMBi Willa RETAM GBOAL MMSS c,o.¢w. s.suve.w ♦..,yc,w,s rows a.a. W si�.,r ww �w�wpe°n�..r,urr yw'a wnr'uVr r�ies s.uu.0 e... ��✓+ Np.ue.e�enui e.se.s. w v � ems.. �Yw e.v.v. wn�cui'PW�ww-. b.m..uM . Apr ♦ s^��i ww..�nra�v+�+s «sr i. w� e�n,u�uuu, �im�eb.�Mw.w r u�e.re.�tierr u. wu„ryu�eN�iww`� PLANT MATERIALS LW yw. rp..r rW w �^P. • .M+l�.r� anima r reiW.. ,.r�e�yu nT m rW rrM 4 bus .�s�. � •r.n � a ac n �"wAe poi♦'M LANIIETAPE ckTTWRI W ii ram` 77 PROJECT DEVELOPNERT PLAN - LANDSCAPE PLAN HARMONY TECHNOLOGY PARK F I R S. T F I X. I N G CELESTICA COLORADO SHEET M GC a n VGVST So. 1007 REV, OCTOEEE 1 19 D7 ' NORT■ 0. IF R1 m PROJECT DEVELOPMENT PLAN - SITE PLAN HARMONY TECHNOLOGY PARK F I R S. T F I X. I N G CELESTICA COLORADO a.eisn s a s s y z o c e .wovsr •e, •s'av ncv. ocronm v<. �av> � - � w m MR Ifilll�111111� I I I I I I aii� mt r f•1 171C■t 00ayeoe LAND DN: NO■T■ 0 s i Y r�`� uwa w.V�W .iwu...w. .- o��,� i I 1 �\ .I i 1 i I it m NMRIP CaTmanoN GFUMALMM •'�wa wo m.a ecc r�e'w. w..uew wnw...-��n wrw.u.N.mnww� PROJECT DEVELOPMENT PLAN - SITE PLAN HARMONY TECHNOLOGY PARK F I R E. T F I L I N G u,; _ •.- �---« CELESTICA COLORADO _ SHEET . OF 6 o., rr.Tvvrr. �,wr.w ■ R. ■ CITY LIMIT LON ►wr HOP ��♦ EXI&TWA 04 6Yph URE NEWLETT-PACKARD 100 LOGIC WECAMPUS HARMONY ROAD ■ OC2 HOP CENfER � � ■ NOD �■ ■ %MENEM HOP ■ P1lEETON ■ JR. N16H ■ OC410M HOP ■ ■ ■ ■ ■ RL A ■ ■ ■ ■ ■ CITY LIMB ■ ■ ■ ■ POB61L CREEK ■ bTWy AREA URBAN GROWTH AREA aOIJDARY CONTEXT DIAGRAM HARMONY TECHNOLOGY PARK FIRST FILING Mara scuE fib]: p) Larimer County Symblos Hewlett Packard Co. OUT Logic z 0 HC Q O City Limit HA MONY ROAD RI efts H C He any r Preston Su ivislon Center HC RL HC o) OUT cc OUT z 0 Urban Growth Area E COUNTY RD 36 Lorimer County VICINITY MAP #12-97A Harmony Technology Park 1st Filing, Phase I, Celestica Colorado Type II (LUC) PDP N 1"=1000' City of Fort Collins Comm, ty Planning and Environmenta. rvices Current Planning MEMORANDUM TO: Planning and Zoning Board FROM: Ted Shepard, Senior Planner RE: Condition of Approval for Harmony Technology Park - Celestica DATE: November 6, 1997 Due to continued deliberations at the Colorado Department of Transportation (CDOT) regarding the extent of access at the Harmony Road/Technology Parkway, Staff recommends the following condition of approval: At the time of Final Compliance, full -turning signalized access shall have been granted by CDOT for the Harmony Road/Technology Parkway intersection, or the developer demonstrates, in final form, how the issues related to complying with minimum required Level of Service are solved at the Harmony Road/County Road #9 intersection, and how direct pedestrian access across Harmony Road is solved. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 9 related to traffic on Harmony Road and screening the loading zone along C.R.#9. The P.D.P. complies with the standards addressing these concerns. 9. Findings of Fact: In review and evaluation of Celestica P.D.P., Staff makes the following findings of fact: A. The land use, light industrial, complies with Harmony Corridor Plan. B. The land use is permitted in H-C, Harmony Corridor Zone District. C. The land use complies with the Harmony Technology Park O.D.P. D. The P.D.P. complies with the Harmony Corridor Standards and Guidelines with one exception. E. A variance request to allow a building material of less quality on the south elevation is recommended based on the peculiar and exceptional practical difficulties required for future expansion on the balance of the 34 acre site. F. The P.D.P. complies with the District Standards with two exceptions. G. Two modifications are recommended to (1.) allow primary entrances that face the adjacent streets but require pedestrians to cross intervening driveways, and (2.) to allow the building to be oriented to face the adjacent streets but separated from the street by intervening front yard parking. H. The P.D.P. complies with the General Development Standards. RECOMMENDATION: Staff recommends approval of Harmony Technology Park, First Filing, Celestica, P.D.P., #12-97A. Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 8 The proposed building features a combination of tilt -up, pre -cast concrete, glazing, and architectural grade metal panels (not a "Butler" type system). The easterly entrance features horizontal overhangs ("Brise Soleil") to add visual relief. There are indentations and projections which contribute to shadowing and breaking up the facade especially along the north elevation which is 600 feet long. The metal cladding will be rust colored to add depth to the structure. The glazing will not have a reflectivity of greater than 60%. The structure is not over 40 feet in height. E. Street Pattern and Connectivity The P.D.P. connects to the surrounding street system with all modes in a manner that is safe, efficient, convenient and attractive. There are multiple direct connections to such destinations as Preston Commercial Center (future) and Hewlett-Packard via a signalized intersection. The open campus promotes neighborhood compatibility rather than forming a barrier. (Unlike H-P, Woodward Governor and Symbios Logic, the facility is not fenced in.) The street pattern will contribute to the proposed street network of the Harmony Technology Park O.D.P. F. Transportation Level of Service The P.D.P. maintains the adopted level of service standards for vehicles, bikes and pedestrians. Primary access is gained from C.R.#9 and Technology Parkway. There is no direct vehicular access off Harmony Road. In order to signalize the Harmony Road/Technology Parkway intersection, an amendment to the Harmony Road Access Control Plan is being processed with CDOT. All key intersections will operate acceptably. G. Transit Facilities The P.D.P. accommodates transit stops on C.R.#9 and within the site for Transfort's Southside Shuttle. Although there is presently no transit service on C.R.#9, it is expected in the future. For the short term, the site will be served by the Southside Shuttle for peak hour service as it now does for Hewlett-Packard. In the long range, the Level of Service for transit is "B." 8. Neighborhood Information Meetinos Two neighborhood information meetings have been held. One was held for the Harmony Technology Park O.D.P. and one for Celestica P.D.P. The primary concern was how the future parcels in the O.D.P. would buffer the existing residential area along Cambridge Drive to the east. This issue was resolved at the O.D.P. level by establishing a conceptual buffer zone along the east property line. Other concerns Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 7 6. General Development Standards: The P.D.P. was reviewed and evaluated by the requirements of the General Development Standards of the Land Use Code. A. Landscaping and Tree Protection The P.D.P. provides significant canopy shading to reduce glare and heat build-up. Visual quality is achieved with street trees, parking lot islands, foundation plantings, and loading dock screening. The loss of three trees around the Harmony House is mitigated by adding six new trees at three inches in caliper. B. Parking and Circulation The parking and circulation will accommodate the movement of vehicles, bicycles, pedestrians, and transit safely and conveniently throughout the site. Transit stops are dedicated in the locations prescribed by Transfort. Bike racks are located near entries and lockers, showers and food service is provided onsite. The onsite pedestrian system provides adequate directness, continuity, street crossing, and visible interest especially given the requirement for a fire access loop road around the building. Connections are made to all perimeter streets. C. Historic and Cultural Resources The Harmony House will be preserved. This historic farmhouse, constructed circa 1900, is a two-story brick structure that faces directly onto Harmony Road. Referred to originally as the Ziegler Farm, the homestead and farm were an integral part of the Harmony Agricultural District for decades. The building is eligible for both local and state historic designation but has not yet been designated. D. Building The building form and materials are modernistic. This is dissimilar to the materials and form used in the immediate neighborhood (Hewlett-Packard). The only two modernistic structures in the southeast are ABB (Harmony and Innovation) and Fort Collins High School. The Land Use Code requires that: "If dissimilar materials are being proposed, other characteristics such as scale, proportions, form, architectural detailing, color and texture, shall be utilized to ensure that enough similarity exists for the building to be compatible, despite the differences in materials." Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 6 (a.) On the west entrance, there are four sidewalk connections from the adjacent streets to the primary entrance. (b.) On the east, there are three sidewalk connections from the adjacent streets to the primary entrance. (c.) The entire campus is open with no perimeter security fencing. This achieves a fundamental design goal of the Land Use Code that is not found on other existing major manufacturing facilities. (d.) The building cannot be brought any closer to Harmony Road (thereby enabling a sidewalk to connect without crossing a vehicle use area) due to the preservation of Harmony House, an historic, two-story brick house dating from circa 1900. For historic preservation purposes, the Celestica structure is set behind Harmony House. (e.) By being located behind Harmony House, the building is 270 feet back from Harmony Road, not just the minimum of 80 feet. This is beneficial to the visual aesthetics of the Harmony Corridor given the fact that the building is 600 long. (By way of comparison, ABB, in the Oak Ridge Business Park at Harmony and McMurry, is 270 feet long at the 80 foot minimum set back from Harmony Road.) Placing a 600 foot long structure 80 feet back from Harmony Road would be imposing and dominate the streetscape. (f.) Connecting sidewalks have been upgraded with amenities such as scored concrete crosswalks, illumination by ground -mounted lights, and framing the walks with trees. (g.) The parking along Harmony Road is screened by berms and landscaping with two parking lot modules of 70 and 106 spaces respectively. In conclusion, the P.D.P. demonstrates a high level of design for pedestrian connections and building orientation. Therefore, Staff finds that granting the two modifications would neither be detrimental to the public good nor impair the intent and purposes of the Land Use Code. Further, Staff finds that the P.D.P. as submitted will advance and protect the public interests and purposes of the Harmony Corridor District equally well or better than would a plan which complies with the standards for which the modifications are requested. Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 5 1. The first modification is in reference to the following district standard: "All buildings shall provide a primary entrance that faces and opens directly onto the adjacent street sidewalk or a walkway, plaza, or courtyard that has direct linkage to the street sidewalk without requiring pedestrians to cross any intervening driveways or parking lots." The building has two primary entrances (east and west) both of which face directly onto the adjacent street and sidewalk (Technology Parkway and C.R.#9). In both cases, however, pedestrians would have to cross an intervening driveway to gain access to the primary entrances. 2. The second modification is in reference to the following district standard: "To the extent reasonably feasible, buildings shall be oriented to face the adjacent street with no intervening front yard parking." As mentioned, the building is oriented to both Technology Parkway and C.R.#9. In both cases, however, there is intervening front yard parking. 3. Evaluation of the Two Modifications Evaluation and review of the two modifications are made together since they relate so closely. Modification requests may be granted if the P & Z Board determines and finds that the granting of the modification would neither be detrimental to the public good nor impair the intent and purposes of the Land Use Code and the Section from which the modification is requested and the applicant demonstrates that the plan as submitted will advance or protect the public interests and purposes of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested. In addition, in evaluating the two modifications, it is helpful to refer to the "Purpose" statement of the Harmony Corridor Zone District: "The Harmony Corridor District is intended to implement the design concepts and land use vision of the Harmony Corridor Plan - that of creating an attractive and complete mixed -use area with a major employment base." Staff recommends approval of the two modifications to the District Standards based on the following justifications: Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 4 And, 3. "In either of the foregoing circumstances, the variance may be granted without substantial detriment to the public good." The applicant's justification for the variance is based on the peculiar and practical difficulty and undue hardship that would result in construction of a matching pre- cast/glass/metal panel exterior on the south elevation based on the plans for future expansion to the south. Future plans call for a doubling of the building's size in the near future and, possibly, adding another 200,000 square feet in the long term. The amount of land area purchased by Celestica indicates three phases of construction at final build -out. In order to not interrupt the manufacturing process, future expansion is required to proceed with minimal disturbance. This is best accomplished with the use of metal panels versus tilt -up, pre -cast concrete panels. Upon the final phase, the south elevation will feature exterior materials to match the quality of the other three sides. Staff recommends approval of the variance request based on peculiar and practical difficulty and undue hardship of constructing a south wall of pre -cast concrete for phase one. Since the building is set up to expand to the south, the south wall must be made to adapt to future conditions . The south elevation is the least visible to the public so the impact of the metal wall is lessened. Finally, Staff finds that the variance may be granted without substantial detriment to the public good. 5. Harmony Corridor - District Standards: The P.D.P. was reviewed and evaluated by the requirements of the Harmony Corridor Zone District of the Land Use Code. A. Compliance with District Standards The P.D.P. demonstrates compliance with the District Standards by: Staying below the maximum roof height. Participating in an O.D.P. that establishes an integrated pattern of streets. B. Two Modifications to District Standards: The Planning and Zoning Board is empowered to grant modifications to the District Standards for P.D.P.'s which are pending approval. There are two District Standards for which the applicant is requesting modifications. Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 3 A. Compliance with Harmony Corridor Standards and Guidelines: The P.D.P. complies with the Standards and Guidelines by: Preserving the 80 foot setback along Harmony Road. Providing an eight foot wide, detached, meandering walk along Harmony Road. Constructing a rolling berm of varying height along Harmony Road. Landscaping the site in accordance with the "Harmony Oaks" design concept. Providing the approved type of lighting with no conflicts with landscaping. Screening parking from public streets with a visual break along Harmony Road, in modules of less than 200 cars. Screening utility equipment, storage areas, and loading docks. B. Variance Request - Harmony Corridor Plan Standard - Architecture The P.D.P. does not satisfy the following mandatory standard of the Harmony Corridor Plan: "Buildings shall be designed to ensure that all elevations are attractive, rather than placing heavy emphasis on the front elevation and downgrading the aesthetic appeal of the side elevations." The south elevation is predominantly an architectural grade metal panel. This material is used for its ability to be come down quickly and cleanly with minimum disruption to the manufacturing process for the purpose of future expansion. A sample is provided. Consequently, in accordance with the procedures of the Harmony Corridor Plan - Standards and Guidelines, a variance is requested. The Planning and Zoning Board is empowered to grant variances to the mandatory standards under the following circumstances: 1. "The strict application of the standard would result in peculiar and exceptional practical difficulties or exceptional and undue hardship upon the owner of the affected property." Or, 2. "The alternative plan, as submitted, will protect the public interest advanced by the standard for which the variance is requested equally well or better than would compliance with such standard." Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A November 6, 1997 P & Z Meeting Page 2 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: H-C; Hewlett-Packard Facility S: H-C; Vacant (Harmony Technology Park O.D.P.) E: H-C; Vacant (Harmony Technology Park O.D.P.) W: H-C; Vacant (Preston Commercial Center Preliminary P.U.D.) The parcel is part of a larger annexation known as Harmony Farm that was annexed in 1984. The parcel is also part of the 155 acre Harmony Technology Park Overall Development Plan which was approved on August 7, 1997. 2. Land Use - Overall Development Plan: The parcel is designated as "Parcel A, Phase One" on the Harmony Technology Park O.D.P. This parcel is designated as "Basic Industrial, Non -Retail Employment." This land use complies with the Harmony Corridor Plan. Since Celestica assembles electronic circuit boards for the computer industry, with office support, this land use is considered to be "Basic Industrial, Non -Retail Employment." Therefore, the proposed land use complies with both the Harmony Corridor Plan and the Harmony Technology Park O.D.P. 3. Code Compliance - Permitted Use in the Zone District: The Harmony Corridor Zone allows industrial uses such as research laboratories and light industrial uses permitted uses. All new structures greater than 80,000 square feet in floor area shall be subject to Planning and Zoning Review. Since the Celestica operation is considered light industrial, and with over 80,000 square feet, the use is considered permitted in the zone district, subject to P & Z review for compliance with the Land Use Code. 4. Harmony Corridor Plan Design Standards and Guidelines: The P.D.P. was reviewed and evaluated by the standards and guidelines of the Harmony Corridor Plan, as amended in 1995. The project complies with the standards and guidelines with one exception. ITEM NO. 4 MEETING DATE 1 1 /6/97 STAFF Ted Shepard Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Harmony Technology Park, First Filing, Celestica, Project Development Plan, #12-97A APPLICANT: Celestica, Inc. c/o B.H.A. Design, Inc. 2000 Vermont Drive Fort Collins, CO 80525 OWNER: Celestica, Inc. 844 Don Mills Road, 25/515 North York, Ontario M3C 1 V7 Canada PROJECT DESCRIPTION: Request for a Project Development Plan for a manufacturing and office building. The building would be a total 209,308 square feet divided between 176,287 square feet for manufacturing and 33,021 square feet for office. The site is 34.33 acres located at the southeast corner of Harmony Road and C.R.#9. The parcel is zoned H-C, Harmony Corridor. RECOMMENDATION: Approval EXECUTIVE SUMMARY: A manufacturing and office facility is a permitted use in the Harmony Corridor Zone District. The land use is defined as "Basic Industrial and Non -Retail Employment" which complies with the Harmony Technology Park O.D.P. The P.D.P. complies with the Harmony Corridor Standards and Guidelines with one exception. The use of metal panels on the south elevation is the subject of a variance request from the Harmony Corridor Plan - Standards and Guidelines due to the need for future expansion. The P.D.P. complies with the District Standards with two exceptions for which modifications are requested. Finally, the P.D.P. complies with the General Development Standards. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750 PLANNING DEPARTMENT