HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK-CELESTICA - PDP - 12-97A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTPage Two
Project Development Plan (Continued)
❑ Other information Director may require.
_Natural area or environmental study
c�ev "t ron coin
ACopy of applicable conceptual letter and explanation of how issues have been addressed.
Legal description of the site (one copy on 8 1/2" x 11" sheet).
Name and address of each owner of property within the boundaries of the
development plan area.
G�'List of names of all general and limited partners and/or officers involved as either
applicants or owners.
3r'bevelopment phasing schedule.
-B--Explanation of any variance request(s).
❑ Signed letters of intent indicated that all required off -site easements and off -site
rights -of -way, can be negotiated in time for final development plan submittal.
Revised 518197
Submittal Checklist
Project Development Plan
The following information is required to be submitted, unless waived, with all applications.
Any item waived must be dated and initialed by a planner with the City of Fort Collins
Current Planning Department.
0' Application form and filing fee (plus .50 cents for each APO label).
Three (3) lists of names and addresses of all owners of record of real property within
at least 500' of the property lines for the parcel of land for which the project is
proposed, exclusive of public right-of-way. (Two (2) lists typed on mailing labels (33
names per sheet) and the-othier-4''t on a reproducible copy of those labels.)
❑✓JCertification of Type I �r Type II ^L
W. L
Ld"/Site plan drawings (30 copies). (Refer to the submittal requirements which outline
information to be presented on the site plan.) 24"x36" (folded)
Subdivision Plat (23 copies). (folded)
CXf; Architectural elevations (6 copies). (folded)
Landscape Plan (20 copies). (Refer to the submittal requirements which outline
information to be presented on the landscape plan.) (folded)
GD(Statement of planning objectives (26 copies).
C(Transportation Impact Analysis (TIA) (6 copies).
/3 0,F-Dr-1- -
L Utility -plans (existing and proposed utility systems) copies). (unfolded)
Er Drainage and erosion control report (4 copies).
SaSoils report (2 copies).
C"Context diagram (5 copies). (folded)
[Lighting Plan (5 copies). (folded)
EX Hazardous Materials Impact Analysis (4 copies).
S//treet cross section schematics (if not included in the utility plans (8 copies). (folded)
Revised 518197 Continued on the following page.