Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FORT COLLINS MUFFLER - PDP/FDP - 24-97 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEET
Project. -wZ4--9 F+. C4,,, A. 4- Date: 0VZck/ 9 7 Planner: Le4ime fark• Engineer: A; L Cl f r Traffic Operations: ���� ►�.��1.� Items Requested Site I land Plat I Utility I Drainage Rpt Other Items Required Engineering X x x x Redlined Items Being Returned Site I land Plat I Utility Drainage Rpt I Other Items Being Returned X Stormwater X X x /x Water/Wastewater x X x x X Traffic Operations Trans. Planning Transtrt Natural Resources Park Planning Totals Z. 3 3 3 I Other: Note: All redlined items should be returned with the resubmittal/ revisions. Revisions Routin _ .s MEN FILE: PROJECT P ENGINEERING: PAVEMENT BUILDING INSPECTION LIGHT &POWER MAPPING / DRAFTING m ADVANCE PLANNING R.O.W. PLANNING WATER CONSERVATION POST OFFICE PUBLIC SERVICE STATE HIGHWAY DEPARTMENT m DITCH COMPANY RAILROAD: UP or BN/CS m . . - - . . m�iii�i iWNW i���� IN m ©m�A�������� 55 1 (04