Loading...
HomeMy WebLinkAboutPALMER OFFICE BUILDING REMODEL - PDP/FDP - 22-97 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. of 0��ce Planner: Steve o+fi Engineer: A C� IP Traffic Operations: Date: G/Z 3 /9 7 Items Requested Site I Land Plat Utility I Drainage Rpt Other Items Required Engineering x x Redlined Items Being Returned Site I land Plat I Utility Drainage Rpt I Other Items Being Returned n Stormwater x x x water/wastewater x X �c Trafi ( Operations Trans. Planning x n Tran*rt Natural Resources Park Planning Totals 4- z 3 Other: hate: All redlined items should be returned with the resubmittal/ revisions. T_�.!'Y�6� 1�DJ f 90�0z I l i Revisions R Routing Sheet Item:I r, Date: FILE: PROJECT PLANNER ENGINEERING: PAVEMENT BUILDING INSPECTION MAPPING / DRAFTING FORESTRY ADVANCE PLANNING pf R.O.W PLANNING WATER CONSERVATION POST OFFICE PUBLIC SERVICE STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS ■■■■■ ■■■■■■ •••.._..■■. ■■ �■■iiiiiii�