HomeMy WebLinkAboutBROOKFIELD SECOND FILING, TRACTS D & E - PDP/FDP - FDP150025 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST (3)ADrainage and Erosion Control Report* REQ q
Final Utility and Drainage Plans* (24"x 36"— unfolded) REQ 0
Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf REQ
Transportation Impact Analysis* (TIA), updated* X
❑ Soils Report* D - until after hearing
Deeds* (contingent on final approval) D
LI Mylars* (Mylars not needed until Final plans are approved) D
❑ Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf received
❑ Other information the Director may require:
- Subsurface Hydrologic Study* X
- Easements/Agreements* REQ (if needed; letter of intent prior to scheduling hearing)
- Environmental Reports* REQ - E.C.S.
- Building Materials Exhibit D - until 2nd round
Revised Lighting Plan: D - until 2nd round of review
❑ An electronic copy of all submitted materials (above) on a disk or other digital storage device (1 copy).
REQ
*This document is meant to be used as a checklist only. For a more detailed list and explanation of each of
these items, please see the handout "Submittal Requirements: Final Plan Review"
June 29, 2015 2 FOP Submittal Requirements
City of Development Review Guide — STEP 6 of 8
F6rt Collins SUBMITTAL CHECKLIST:
FINAL PLAN REVIEW
Brookfield Second Filing PDF/FDP, Round 1
The following information is required to be submitted with all applications, unless waived by staff. Any item
waived must be dated and initialed by a planner with the City of Fort Collins Community Development and
Neighborhood Services Department.
Submittal Check -in notes from Jason Holland, 7-13-2015:
1. In order to expedite your review, please review the applicable detailed submittal check -sheets and
Development Review Guide at: http://www.fcqov.com/develoomentreview/applications.Php
and: http://www.fcgov.com/drq/introduction.i)hi) to ensure that your plan information is complete.
2. In addition to paper copies, a digital copy of materials is required with the initial application and
resubmittals at the time of check in. This can be submitted via CD or flash drive.
3. Please bring a copy of this check sheet, all submittal materials and attached project routing sheet at the
time of check -in.
4. Prior to submittal, schedule a submittal appointment with Development Review staff at the following
number: 970-221-6750.
5. Refer to Routing Sheet for specific document quantities. Copies of all reports can be routed digitally for
this project, each of the "CD" copies required must be on a separate CD.
IQJAEO-1
X= Items waived; D= Deferred until noted; SN= copy still needed from Initial Submittal;
REQ=Revised documents needed per staff comments; N/A not applicable
Application form and filing fee. Application Form.pdf REQ
Transportation Development Review Fee — please contact Engineering at 221-6605 for information.
TDR Fees and Application.pdf REQ
❑ Name and address of each owner of property within the boundaries of the development plan area. received
❑ List of names of all general and/or limited partners, managers and directors and/or officers and directors of
the corporation involved as either applicants or owners. received
Final Site Plan* (24-x 36-- folded) REQ �fJ
Subdivision Plat* (24" x 36" - folded) REQ
NArchitectural Elevations* (24"x 36-- folded) REQ
Plan* (24"x 36"- folded) REQ
Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580