Loading...
HomeMy WebLinkAboutBROOKFIELD SECOND FILING, TRACTS D & E - PDP/FDP - FDP150025 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST (3)ADrainage and Erosion Control Report* REQ q Final Utility and Drainage Plans* (24"x 36"— unfolded) REQ 0 Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf REQ Transportation Impact Analysis* (TIA), updated* X ❑ Soils Report* D - until after hearing Deeds* (contingent on final approval) D LI Mylars* (Mylars not needed until Final plans are approved) D ❑ Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf received ❑ Other information the Director may require: - Subsurface Hydrologic Study* X - Easements/Agreements* REQ (if needed; letter of intent prior to scheduling hearing) - Environmental Reports* REQ - E.C.S. - Building Materials Exhibit D - until 2nd round Revised Lighting Plan: D - until 2nd round of review ❑ An electronic copy of all submitted materials (above) on a disk or other digital storage device (1 copy). REQ *This document is meant to be used as a checklist only. For a more detailed list and explanation of each of these items, please see the handout "Submittal Requirements: Final Plan Review" June 29, 2015 2 FOP Submittal Requirements City of Development Review Guide — STEP 6 of 8 F6rt Collins SUBMITTAL CHECKLIST: FINAL PLAN REVIEW Brookfield Second Filing PDF/FDP, Round 1 The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Community Development and Neighborhood Services Department. Submittal Check -in notes from Jason Holland, 7-13-2015: 1. In order to expedite your review, please review the applicable detailed submittal check -sheets and Development Review Guide at: http://www.fcqov.com/develoomentreview/applications.Php and: http://www.fcgov.com/drq/introduction.i)hi) to ensure that your plan information is complete. 2. In addition to paper copies, a digital copy of materials is required with the initial application and resubmittals at the time of check in. This can be submitted via CD or flash drive. 3. Please bring a copy of this check sheet, all submittal materials and attached project routing sheet at the time of check -in. 4. Prior to submittal, schedule a submittal appointment with Development Review staff at the following number: 970-221-6750. 5. Refer to Routing Sheet for specific document quantities. Copies of all reports can be routed digitally for this project, each of the "CD" copies required must be on a separate CD. IQJAEO-1 X= Items waived; D= Deferred until noted; SN= copy still needed from Initial Submittal; REQ=Revised documents needed per staff comments; N/A not applicable Application form and filing fee. Application Form.pdf REQ Transportation Development Review Fee — please contact Engineering at 221-6605 for information. TDR Fees and Application.pdf REQ ❑ Name and address of each owner of property within the boundaries of the development plan area. received ❑ List of names of all general and/or limited partners, managers and directors and/or officers and directors of the corporation involved as either applicants or owners. received Final Site Plan* (24-x 36-- folded) REQ �fJ Subdivision Plat* (24" x 36" - folded) REQ NArchitectural Elevations* (24"x 36-- folded) REQ Plan* (24"x 36"- folded) REQ Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580