Loading...
HomeMy WebLinkAboutFORT COLLINS MUFFLER - PDP/FDP - 24-97 - CORRESPONDENCE - ALTERNATIVE COMPLIANCE REQUESTr Mar-06-98 20:39A S.J. Stainbicker 970-207-0424 P.02 Spring Court Subdivision - Ft. Collins Muffler Please contact me with any further concerns not previously addressed by staff. We appreciate the opportunity to cferify issues prior to final approval. winbicker, A.I.A. i Mar-06-98 10:39A S.J. SZainbicker 970-207-0424 P.01 Ms, Leanne Harter Current Planning Department City of Fort Collins FL Collins, Colorado B0522 re: Spring Court Subdivision - Ft. Coffins Muffler Request for Alternative Landscape Compliance Dear Leanne: March 6, 1998 Referencing your initial project comments of October 2, 1997. specifically item 9.a discussing the parking lot perimeter requirements along the east property fine. We have developed the final landscape to be in compliance with the Alternative Compliance requirements of Section 3.2.1.N. Following discussions with the various utility departments and Tm Buchanan it was agreed the plan as submitted meets or exceeds the Design Standards requirements. Several existing site conditions provided for the canopy tree buffer alternative design: 1. Existing uses to the east are compatible uses, providing similar vehicular repair services and thus pose no conflict or specific screening concerns. 2, There is approximately a 5 foot vertical grade difference and existing structural concrete retaining wall separating the two properties. 3. Existing Electric, Telephone and Sanitary Sewer utilities already exist serving adjacent uses to the south in an easement area along the east property line. Modifications of the existing utilities is not practical nor requested by City Staff, 4. Utility and landscape criteria require a minimum separation of 10' of tree plantings to utility locations. This distance is not available. 5. The plan internalizes parking within the site and as such only allows for six parking spaces. Additional landscape islands would compromise the minimal parking count and conflict with additional storm drainage easements also required. 6. Four new trees have been upsized in caliper sizes as wall as an additional tree provided offsita to the neighbor to the south to mitigate the developments impact where it is most desired and valuable. To restate, through the input from various Staff departments the plan represants the design review procedure required by the City Plan, meets or exceeds the purpose of the perimeter landscape requirements and satisfies the Alternative Compliance requirements of tree canopy cover, enhancement of neighborhood continuity and connectivity, fosters non -vehicular access. and demonstrates appropriate landscape design in an existing in fill condition. 970.207.0424 970.225•0252 FAX 748 HINSDALE ONVE FORT [OILINS•[O OBS25