Loading...
HomeMy WebLinkAboutVENCOR, FORT COLLINS NURSING CARE - PDP/FDP - 23-97 - SUBMITTAL DOCUMENTS - ROUND 1 - HAZMATSJREngineering, Ltd. 2620 E. Prospect Rd., Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 • FAX (970) 491-9984 August 19, 1997 Ms. Leanne Harter City of Fort Collins Planning Department 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522 4935 North 30th Street Colorado Springs, Colorado 80919 (719) 593-2593 • FAX (719) 528-6613 6110 Greenwood Plaza Blvd. Englewood, Colorado 80111 (303) 740-9393 • FAX (303) 721-9019 Re: VENCOR Fort Collins - Nursing Care Center -- Hazardous Materials Impact Study Dear Leanne: I spoke with Mr. Ron Gonzales at Poudre Fire Authority concerning the need for a Hazardous Materials Impact Analysis. After I described the project to him, Mr. Gonzales informed me that this site did not need fit the requirements for a study as it does not have "potential on -site and/or off -site hazardous materials impacts" as stated under Item 1.0) in the "Project Development Plan Submittal Requirements", revised May 15, 1997. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, JR Engineering, Ltd. 1 David W. Klockeman. E. Project Manager 01 DIS Recycled