HomeMy WebLinkAboutFORT COLLINS MUFFLER - PDP/FDP - 24-97 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Date:
Planner: JAAMe,-, TralicOperations:
Engineer: M.coi".
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
k
DrAfA Z
Stormwater
Icl;aul�a,s
Water/Wastewater
TraM( Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routing Sheet i
FEW
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
OWN
FIRE
IN
t •
.
WADVANCE
..........
-
PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
SCHOOLS: POUDRE/THOMPSON
.
.....C.IN
m
RAILROAD:���
..........::
•.,•.....CIN
IN
...........IN
:
::::::......
.....:::IN
C.....
IN
m
IN
WINN