SHEAR
This letter serves as the response to your review comments concerning the final utility plans for
Howes Street Hideaways H. We have addressed the utility plan review comments, as well as
written comments noted on your Project Comment Sheet dated 6/23/98
Our responses to the written comments are as follows:
* A note calling out the location of the retaining wall detail is now on the Master Utility Plan.
This concludes our response to your review comments concerning the final utility plans for
Howes Street Hideaways H. If you have further questions or comments, please don't hesitate to
call at 226-5334.
Sincerely,
Mark Oberschmidt
Shear Engineering Corporation
MEO / mo
cc: Rayline Development Corporation
Pinecrest Planning and Design
Leanne A. Harter; Project Planner
Shear Engineering Corporation
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 I
June 30,1998
Page 2
Project No: 1536-08-97
This concludes our response to your review comments concerning the final
Final Drainage and Erosion Control Report for Howes Street Hideaways II.
questions, please contact us at 226-5334.
Sincerely,
Mark Oberschmidt
Shear Engineering Corporation
MEO / mo
cc: Rayline Development Corporation
Pinecrest Planning and Design
Leanne A. Harter; Project Planner
utility plans and
If you have any
Shear Engineering Corporation
J
June 30, 1998
Project No: 1536-08-97
Basil Hamdan
City of Ft. Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Howes Street Hideaways 111
Lot 11, Block 105, Harrison's Addition; Fort Collins, Colorado
Dear Basil,
This letter serves as the response to your review continents concerning the final utility plans and
Final Drainage and Erosion Control Report for Howes Street Hideaways Il. This response will
address the utility plan and Final Drainage and Erosion Control Report review comments, as well
as written comments noted on the Project Comment Sheet from the Stormwater Utility dated
6/ 19/98.
GENERAL / UTILITY PLANS:
All comments noted on the final utility plans and Final Drainage and Erosion Control Report
have been addressed.
* Cover Sheet general notes have been expanded as directed.
* Additional silt fence has been added to the Master Grading, Drainage and Erosion Control
Plan.
* Flow arrows have been added to the plan.
Our responses to the written comments are as follows:
* We have provided documentation showing that there is no increase in runoff onto Lot 10
from the Howes Street Hideaways H site. It is our understanding that a letter from the
owner of Lot 10 is not required after recent discussions between Chris Ray and yourself.
* The trench drains will outfall into the alley. The existing flowline elevations in the alley
are lower than the elevations at the end of the trench drains. Hence the water will flow into
the alley across the parking lot or through the grass. Cross sections have been provided
showing how the outfall from the trench drains relate to the existing grade at the alley.
* Grading easements are not required on Lots 11-14 since our client owns all the lots.
* There are no drainage and utility easements to show on the plans.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1
June 30, 1998
Project No: 1536-08-97
Roger Buffington and Jeff Hill
City of Fort Collins Water and Wastewater Utility
700 Wood Street
Ft. Collins, Colorado 80521
Re: Howes Street Hideaways H
Lot 11, Block 105, Harrison's Addition; Fort Collins, Colorado
Dear Roger and Jeff,
This letter serves as the response to your review comments concerning the final utility plans for
Howes Street Hideaways H. This response will address the utility plan review comments, as well
as written comments noted on your Project Comment Sheet dated 6/23/98
GENERAL:
* Refer to response by Pinecrest Planning and Design for items related to the landscape plan.
* All comments noted on the final utility plans have been addressed.
UTILITY PLANS:
* The proposed water service has been relocated so that it no longer crosses the property line.
The water service to the existing house will be disconnected at the curb stop and a new service
will be extended from the existing curb stop to the unit at the rear of the lot. A new service
will be installed off the main to service the existing house. Please refer to the plan for
additional details.
This concludes our response to your review comments concerning the final utility plans for Howes
Street Hideaways Il. If you have further questions or comments, please don't hesitate to call at
226-5334.
Sincerely,
Mark Oberschmidt
Shear Engineering Corporation
MEO / mo
cc: Rayline Development Corporation
Pinecrest Planning and Design
Leanne A. Harter; Project Planner
Shear Engineering Corporation
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311