Re: Howes Street Hideaways H
Lot 11, Block 105, Harrison's Addition; Fort Collins, Colorado
Dear Leanne,
This is a response to certain Conceptual Review comments dated October 27, 1997. They are
primarily Stormwater Utility related and supplement the Conceptual Review comment response
provided by Pinecrest Planning and Design.
2. Stormwater Utility
a. See response by Pinecrest Planning and Design.
b. The Final Drainage and Erosion Control Report has been been prepared by Shear
Engineering Corporation. The report was prepared as an amendment to the Final
Drainage and Erosion Control Report prepared for Howes Street Hideaways and
complies with Old Town Master Plan requirements.
c. Water quality will be considered in the final design as a requirement of the new
Stormwater Criteria Manual.
d. Offsite easements will be considered for the property immediately adjacent to this site.
However, there are several properties in this basin which accept offsite stormwater runoff
historically and it is unreasonable to expect offsite easements for properties which are
affected by more than this single property.
If you have questions, or require further information on any item, please call at (970) 226-5334.
Sincerely
Brian W. Shear, P.E.
Shear Engineering Corporation
BWS/mb
cc: Chris Ray; Rayline Development Corporation
Tom Dugan; Pinecrest Planning and Design
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.031 1
I believe this addresses all of the comments for the Concept review, but if you should require additional
information or should have any questions, feel free to give me a call.
Sincerely,
PineCrest Pining and Design LLC
cc: Chris Ray, Brian Shear
Howes Street Submittal
3
■ See response from Shear Engineering Corporation Letter dated December 15,
1997 which is attached.
d. Offsite easements and grading are common issues with infill developments such as this. An
easement needs to be provided for the offsite flows that were given written permission for
past development.
■ See response from Shear Engineering Corporation Letter dated December 15,
1997 which is attached.
4. Light and Power
a. This duplex will be addressed the same way as the others developed. There is an existing
underground to the house and any changes to relocate this service will be your
responsibility.
■ Comment noted and any costs associated with relocating the existing electric
service will be paid for by the developer.
b. The development in the area is starting to load up the existing transformer, and if there is
any change as a result of this proposal, you will be responsible for the charges.
■ Comment noted.
c. The normal development charges and policies will apply.
■ Comment noted and all development policies will be followed and if there are any
development charges, these will be paid for by the developer.
5. Engineering Department
a. The street oversizing fee is $554/dwelling unit.
■ This fee is noted and will be paid at the time of building permit.
b. You will be required to repair/replace any curb, gutter, and sidewalks that are damaged.
■ Any public improvement damaged as a result of the construction of this duplex will
be repaired by the builder.
c. Utility plans and a development agreement will be required.
■ Utility plans are enclosed as part of this submittal and we will work with City staff
on the preparation of the development agreement at the appropriate time.
6. Poudre Fire Authority
a. The address of the duplex should continue in the same manner as those previously
developed.
■ The developer will work will the City Mapping in correctly addressing the new
duplex and there currently exists a sign on South Howes street identifying the
existing duplex units adjacent to this proposed duplex.
7. Current Planning Department
a. Under the new Land Use Code (in effect March 28) you will have to submit a project
development plan. The project development plan will generally specify the uses of the land,
the layout of landscaping, circulation, architectural elevations, and building and preliminary
plat. The PDP is more specific than the Preliminary submittals for the LDGS. You may
choose to submit the PDP concurrently with the Final Plans as well. The submittal
requirements are attached, and when you are ready to submit, please call Dana Goode at
221-6750 to schedule a submittal meeting.
■ The submittal has been prepared under the new Land Use Code and it is a
combined Project Development Plan (PDP) and Final Compliance Review
submittal. Note that the lot is currently platted as part of the Harrison Addition so
a new plat was not prepared or submitted.
b. An area of Notification Map is attached.
■ The Affected Property Owners list was prepared using the area of notification map
supplied by the Current Planning Department.
c. You will be required to comply with Article 3 and Article 4 of the Land Use Code.
■ Article 3 and Article 4 of the Land Use Code have been reviewed and the Applicant
believes that the project is in compliance with the requirements.
2
PivieCrest Plarrirg arS Desi.5" LLC
Lanbscape Arcliitecture. Lana Planning anb Construction Manasement
4225 Westshore Way ♦ Fort Collins, CO 80525
(970) 226-1655 Fax (970) 226-1635
December 15, 1997
Ms. Leanne Harter
City Planner
City of Fort Collins
Current Planning Department
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522-0580
RE: Howes Street Hideaways - Phase II
Conceptual Review Issues
Dear Leanne:
In response to the Conceptual Review Comments Letter of October 27, 1997 related to the Howes Street
Hideaways - Phase II, please note the following:
1. Zoning Department
a. The property is located in the CC -Community Commercial zone district and it is a Type I
Review.
■ The proposed development is permitted in the CC -Community zone district under
the Type I review.
b. You are required to meet the current parking code requirements. For four bedrooms and
above, you are required to have 2.5 parking spaces.
■ The plan as submitted includes 4 parking spaces
2. Water/Wastewater
a. There is a 6" water main in Howes, and an 8" sewer main in Howes and in the alley to the
east.
■ Water service will be tied into the existing main in Howes and there currently is a
sewer service stubbed into the site to provide service to the main in the alley.
b. Plant Investment Fees and water rights will be due at the time of building permit.
■ This is noted and all required fees will be paid at the time of building permit.
3. Stormwater Utility
a. The site is located on inventory grid #71 and is in the Old Town drainage basin where the
fees are $4,150/acre. The new development fee is subject to the runoff coefficient reduction.
■ The fee amount is noted and will be paid at the time of building permit.
b. The standard drainage and erosion control reports and plans are required and they must
comply with the Old Town master plan imperviousness requirements including '/z of the
street and 'h of the alley. The reports and plans must be prepared by a professional engineer
registered in Colorado.
■ See response from Shear Engineering Corporation Letter dated December 15,
1997 which is attached.
c. Water quality for runoff must be considered and will be a requirement in the new
Stormwater Criteria Manual.