Loading...
HomeMy WebLinkAboutBANNER HEALTH MEDICAL CAMPUS - PDP - PDP130003 - CORRESPONDENCE - REVISIONSBHA Response: The temporary access loop will be for emergency and security purposes. Access control will be detailed in the final compliance plan. Public vehicle access will be restricted to paved driveway surfaces. Comment Number: 8 Comment Originated: 02/05/2013 02/05/2013: LUC 3.2.4 There are some parking areas (North Parking, South Parking and Southwest Parking) that the averages are not meeting the Minimum foot-candle requirements of 1. Please revise plans so that averages meet the Minimum Foot-candle level of 1. CCRD Response: The lighting has been adjusted to bring the North, South, and Southwest parking area averages up to 1.0 FC. Comment Number: 9 Comment Originated: 02/05/2013 02/0512013: Site plan should include note about future phases developing subject to a Minor Amendment (contact Jason Holland for exact wording). BHA Response: Not applicable. Comment Number: 10 Comment Originated: 02105/2013 02/05/2013: Signs and their locations are approved through PDP/FP review process. Signs and their locations are subject to s separate sign permit. If applicant wishes to keep sign information in plans a not should be included on the site plan and elevations that signs are for reference only and will be permitted through a separate sign permit. BHA Response: Proposed monument sign locations are indicated for information only. Note was added to sheets specifying "Sign locations indicated for information only. To be reviewed through separate process". Comment Number: 11 Comment Originated: 02/05/2013 02/05/2013: LUC 3.5.1(1) All mechanical/utility equipment (vents, flues, meters, HVAC... etc) shall be screened. Plans need to indicate locations of such equipment and include notes on how it is screened/painted. BA Response: Miscellaneous vents and flues (other than those required to extend beyond any screening due to airflow requirements) will be screened by the building parapets. All large mechanical equipment will be screened by metal panel walls painted to match the building color palette. Any equipment on the ground will be screened within the service yard. Final locations of equipment will be shown at Final Compliance; conceptual locations are currently located on the elevations and site plan. Page 22 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www.bhodesion.com concrete pad area and the dimensions of the enclosures. BA Response: The trash enclosures, pads and walk-in access are shown on the site plan and can also be seen on the exterior elevations. All trash enclosures to have walk-in access. During phase 1 there needs to be a walking path from the main hospital to the trash and recycling enclosures. BHA Response: Access to the trash and recycling enclosures will be via an underground tunnel connecting the main building with the Central Utility Plant ("CUP") and adjacent trash / recycling containers. This facility will be using trash compactors and will not have public access to trash / recycling containers. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 4 Comment Originated: 01/28/2013 01 /28/2013: We will need to see detail of the fence being used to screen the loading area. BA Response: A portion of the wall will be constructed of the masonry block used on the building. As indicated on the drawings, a portion of the fence will be constructed of wrought iron. Additional details of fence will be provided in Final Compliance Comment Number: 5 Comment Originated: 01130/2013 01/30/2013: On the site plan please show the drip line of the structures that is being used to meet the required covered parking requirements. BHA Response: Drip lines of covered bike parking areas have been indicated. Comment Number: 6 Comment Originated: 01/3012013 01/30/2013: LUC 3.5.3(D)(2)(a)1. No wall that faces a street shall have a uninterrupted length that exceeds 30ft. It appears on the East side of the hospital there is wall uninterrupted wall that exceeds the 30ft requirement. BA Response: The masonry screen walls on the east side of the building at the CUP have been staggered to meet this requirement. Comment Number: 7 Comment Originated: 01/30/2013 01/30/2013: The area in the 1st Phase that is minimal interim site improvements will need to be restricted from vehicle use. Please provide details on how this will be accomplished. BA Response: These areas will restrict vehicle access through a physical barrier and will be resolved and detailed in the final compliance plan. Also the Temporary Emergency Access easement will need to restrict vehicles from using it other than times of Emergency, possible break away chains. If the applicant desires other vehicles to travel on it then it will need to be asphalt or concrete. Page 21 of 22 landscape architecture I planning I urban design voice: 970, 223, 7577 fox: 970.223.1827 w m.bhodesign.com 02/12/2013: The fire hydrant locations will be reviewed with PFA. Any changes will be noted on the redlined plans. NE Response: The proposed fire hydrant location in the northwest area has been revised. Comment Number: 3 Comment Originated: 02/12/2013 02/12/2013: Utility maps show a 3/4" water service stubbed north of the main in Le Fever and east of Lady Moon. This needs to be located and shown on the plans. NE Response: The drawings have been revised to show the existing %-inch water service along LeFever Drive as mentioned. Comment Number: 4 Comment Originated: 02/12/2013 02/12/2013: At final, include plan and profile drawings of the 12" water main. NE Response: Noted. Comment Number: 5 Comment Originated: 02/13/2013 02/13/2013: Will the water main construction be phased? NE Response: Water main phasing will be determined in final compliance as discussed with Roger. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 01/28/2013 01/28/2013: LUC 3.5.1(G) Buildings over 40ft in height requires a Shadow Analysis and Visual Analysis. If these were provided Zoning did not receive a copy of them. BA Response: A Visual Analysis and Shadow Analysis have been provided as part of the resubmittal. Comment Number: 2 Comment Originated: 01/28/2013 01/28/2013: What is the route for the Licensed Waster Haulers during Phase 1, since the route indicate on Exhibit 3 is not to be constructed in Phase 1? Banner Response: Cinquefoil and La Fever roads are being fully constructed in phase 1 construction. The Banner directed route for the Waste haulers is as follows: Trucks will be coming from 1-25 going West on Harmony Road to Lady Moon, south to La Fever east to Cinquefoil and north to the Central Plant. They will then exit the Central Plant going North on Cinquefoil to Harmony Road proceeding east on Harmony to 1-25. Comment Number: 3 Comment Originated: 01/28/2013 01128/2013: LUC 3.2.5 Trash and recycling enclosure are required to be designed with walk-in access without having to open the main service gate and located on concrete pad at least 20ft from a public sidewalk. The proposed enclosures for both the hospital and MOB have not included walk-in access and will need to be revised. Also please label the Page 20 of 22 voice: 970,223.7577 fax: 970.223.1827 landscape architecture I planning I urban design wvi .bhodesign.com Emergency Center access in Phase 1. These errors or inconsistencies drive the need to request the TIS be revised. Delich Response: The trip generation was calculated for the entire hospital and medical office building at full development. The full development trip generation was then proportionally divided between the Phase 1 and Phase 2 components based upon floor area. Figure 14 in the TIS has a typo and will be corrected in the final version of the TIS Comment Number: 3 Comment Originated: 02/12/2013 02/12/2013: Please provide more discussion of what went into the Background growth volumes (unexpected volumes at Lady Moon and Harmony, especially the north bound volumes, and on LeFever.) Numbers are larger than expected. Traffic assumes other undeveloped land and current proposed developments were included as well as general growth but Traffic would like more information about what made up the background growth in the Long Term. Delich Response: The long range background traffic assumed full build -out of the Harmony Technology Park ODP. Department: Transportation Planning Contact: Emma McArdle, 970-224-6197, emcardle@fcgov.com Topic: General Department: Transportation Planning Contact: Emma McArdle, 970-224-6197, emcardle@fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/1212013 02/12/2013: Thank you for depicting the bus stops on the plans as I requested in Conceptual Review. This meets the LUC requirements for transit facilities for this site. BHA Response: Noted. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 02/12/2013 02/12/2013: There is another 12" water main stubbed to the east of Lady Moon north of Timberwood. This main needs to be shown on the plans with the necessary notes for the abandonment. NE Response: The drawings have been revised to show the additional existing 12-inch water main stub. Comment Number: 2 Comment Originated: 02/12/2013 Page 19 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www.bhodesign.com 02/12/2013: TIS indicates the need for dual north bound left turn lanes on Lady Moon at Harmony in the Long Term future. TIS also indiactes dual west bound left turn lanes on Harmony at Lady Moon which would require a second south bound lane on Lady Moon south of Harmony. City will need to discuss those future additional lane possibilities and how we will plan for those improvements. There is the possibility Lady Moon may need more right of way from this development to help in providing for those future lanes. Traffic will provide further comments on the topic as the City discusses the issue. Delich Response: There are 3 northbound lanes on Lady Moon Drive approaching Harmony Road. When dual northbound left -turn lanes are needed, the left -turn lanes will be the two lanes east of the existing median. The other northbound lane will become a through/right-turn lane. When dual westbound left -turn lanes are needed on Harmony road, a second southbound lane will be added on the west side of Lady Moon Drive. If additional right-of-way is needed for this receiving lane, it will come from the parcel west of Lady Moon Drive. Comment Number: 6 Comment Originated: 02/12/2013 02/12/2013: How much traffic is expected in and out of the Service Entrance on Cinquefoil? Is a seperate access necessary or could the service area be accessed from the Emergency access? Delich Response: The TIS does not forecast the amount of Service Entrance traffic. This traffic will likely be light and probably not during the peak hours. Comment Number: 7 Comment Originated: 02/14/2013 02/14/2013: City discussed need of right turn lanes on Harmony at Lady Moon and at Cinquefoil. The City has concerns with turns being made from the high speed travel lanes. This concern is even greater at Cinquefoil as the smaller amount of right turning traffic may be less expected by advancing Eb motorists. The City is requesting rural design east bound right turn lanes at both intersections. Delich Response: In the short range future, these right -turn lanes are not required, but are required in the long range future. Topic: Traffic Impact Study Comment Number: 2 Comment Originated: 02/12/2013 02/1212013: The TIS had a few errors or discrepancies internally and seemingly between what the applicant is providing staff. One of the internal errors is in the Trip Generation table. Another is the Harmony and Lady Moon long term analysis shows dual north bound left turn lanes in the analysis but only a single left turn in Figure 14. Figure 14 shows dual west bound left turn lanes but only a single south bound receiving lane on Lady Moon (analysis at LM and RT Access and also at Rock Creek shows only a single Sb lane on Lady Moon in its analysis). Figure 13 indicates Cinquefoil extending to LeFever in the short term, but the applicant seems to be stating they only want to extend Cinquefoil to their Page 18 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www.bhodesign.com NE Response: Yes it will be remain, please see note 6 on sheet 1 which states the platted portion of the 60' road right-of-way is vacated by the plat. Topic: Site Plan Comment Number: 1 Comment Originated: 02/12/2013 02/12/2013: There are line over text issues on sheets 2, 3 & 6. BHA Response: Line over text issues have been resolved. Comment Number: 2 Comment Originated: 0211212013 02/12/2013: There are text over text issues on sheet 2. BHA Response: Line over text issues have been resolved. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanfordOfcgov.com Topic: General Comment Number: 1 Comment Originated: 02/12/2013 02/12/2013: Traffic Op's would like to see the median on Lady Moon extended southwards to Timberwood and a left turn lane added. NE Response: A "pork chop island" has been added to the right-in/right-out in lieu of extending the Lady Moon raised median any further then currently designed as discussed with Ward. Comment Number: 4 Comment Originated: 02/12/2013 02/12/2013: The length of the north bound left and right turn lanes are longer than what Traffic has for their length. Are the lane lengths accurate or are there roadway modifications planned to widen and lengthen the north approach on Lady Moon at Harmony? Please verify the current north bound turn lane lengths if no modiufications are planned. If the length of the turn lanes are not to scale please provide evaluation of adequate storage capacity (queue analysis) for the expected short term total traffic volumes each turn lane is expected to handle. Delich Response: The current lengths of the left -turn lane is —190 feet and the right -turn lane is —260 feet. With the extension of the median, the left -turn length will be ^260 feet. The right -turn lane will remain at ^260 feet. The short range calculated left -turn queue is 123 and 118 feet and the right -turn queue is 0 and 0 feet, in the respective peak hours. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: General Comment Number: 5 Comment Originated: 02/12/2013 Page 17 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970.223.1827 www.bhodesign.com 02113/2013: There are many bearings and distances missing on sheets 2 & 3. NE Response: Dimensions and bearing have been added. Comment Number: 25 Comment Originated: 02/13/2013 02/13/2013: Please label all surrounding properties as unplatted, or if platted with subdivision name. NE Response: Surrounding properties have been labeled accordingly. Comment Number: 26 Comment Originated: 02/13/2013 02/13/2013: Please remove "State Highway No. 68" from the Harmony Road label. It is no longer a state highway. NE Response: The reference to "State Highway No. 68" has been removed. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Plat Comment Number: 27 Comment Originated: 02/13/2013 02/13/2013: Please show the bearings & distances for the long boundary lines along Cinquefoil Lane and Lady Moon Drive on both sheets 2 & 3. NE Response: Bearings and distances have been added. Comment Number: 28 Comment Originated: 02/13/2013 02/13/2013: Are the easements along Harmony Road general easements or Fort Collins Loveland Water District easements. See redlines. NE Response: The existing easements along the south side of Harmony Road are for both the City of Fort Collins and Loveland Water District. Comment Number: 29 Comment Originated: 02/13/2013 02/13/2013: Please correct the reception number for the right of way easement at the southeast comer of the property on sheet 3. It has too few numbers in it. NE Response: Reception number has been corrected. Comment Number: 30 Comment Originated: 02/13/2013 02/13/2013: What are the two lines that cross Le Fever Drive on sheet 3? See redlines. NE Response: The two lines are "old" lot lines and have been removed. Comment Number: 31 Comment Originated: 02/13/2013 02/13/2013: Please show the section comer to the south of the property that establishes the west line of the northeast quarter of the section. NE Response: The center X corner has been added to plat. Comment Number: 32 Comment Originated: 02/13/2013 02/13/2013: Does the 60' road right of way dedicated at reception # 88006278 south of Le Fever Drive still remain? Page 16 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970.223.1827 wwvc.bhodesign.com NE Response: The word "The" was added to the subtitle on all sheets. Comment Number: 16 Comment Originated: 02/12/2013 02/12/2013: Please make sure that all easements are locatable. See redlines. NE Response: Dimensions have been added to proposed easements. Comment Number: 17 Comment Originated: 02112/2013 02/12/2013: There are easements and rights of way shown as dedicated by seperate document, that will need the recording information added. See redlines. NE Response: All recording information for offsite easements and right-of-ways shown as being dedicated by separate document will be shown on final plat prior to recordation. Comment Number: 18 Comment Originated: 0211312013 02/13/2013: Are there any lienholders? If so, please add the Lienholder signature language. NE Response: The sale of the property is pending and therefore the property owners/lien holders have not been determined. Comment Number: 19 . Comment Originated: 02113/2013 02/13/2013: If no sight distance easements are needed for the Plat, the language on sheet 1 may be removed. NE Response: Sight distance language has been removed. Comment Number: 20 Comment Originated: 02/13/2013 02/13/2013: There are notes on sheet 1 and the labels on sheet 4 that state "vacated by owner with this plat" & "vacated by this plat". This must be done by City Council action. NE Response: These right-of-ways are privately owned and not dedicated to the City. Notes 5 & 6 on sheet 1 have been revised to state that these are private roads. Comment Number: 21 Comment Originated: 02/13/2013 02/13/2013: Please describe the markings on the section corners found. NE Response: Descriptions of marking were added where applicable. Comment Number: 22 Comment Originated: 02/13/2013 02/13/2013: Please provide monument records for the corners used for control. NE Response: Monument records for the three (3) corners that are shown on drawings will be submitted with this PDP re -submittal. Comment Number: 23 Comment Originated: 02/13/2013 02/13/2013: Are the areas at the northwest & southeast comers of the property easements? If so, please label them as such. NE Response: The easement at the northwest corner is a utility, drainage, and access easement and has been labeled as such. The easement at the southeast corner is a utility and drainage easement and has been labeled as such. Comment Number: 24 Comment Originated: 02/13/2013 Page 15 of 22 voice: 970.223.7577 fox: 970.223.1827 landscape architecture I planning I urban design www.bbodesign.com 02/12/2013: Can the text in the profiles on sheets C500, C501, C502 & C503 be masked? The gridlines are going to create problems with copying & scanning the plans. NE Response: Drawings have been revised accordingly. Comment Number: 12 Comment Originated: 02/12/2013 02/12/2013: Please correct the matchline on sheet C401, C501 & C505. See redlines. NE Response: Drawings have been revised accordingly. Comment Number: 13 Comment Originated: 02/12/2013 02/12/2013: Please correct the keymap on sheet C505. NE Response: The key map has been revised. Topic: General Comment Number: 3 Comment Originated: 02/12/2013 02/12/2013: All text on sheet 5 is very pixelated. Please sharpen the text up. CCRD Response: We have revised the configuration of our files to improve the graphics of the lighting cutsheets. Topic: Landscape Plans Comment Number: 4 Comment Originated: 02/12/2013 02/12/2013: No comments. BHA Response: Noted. Topic: Lighting Plan Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Lighting Plan Comment Number: 6 Comment Originated: 02/12/2013 02/12/2013: There are line over text issues on sheets E1 & E2. CCRD Response: Drawings have been modified to eliminate the text over line issues. Comment Number: 7 Comment Origii 02/12/2013: All text on sheets E3 & E4 is very pixelated. Please sharpen the text up. CCRD Response: We have revised the configuration of our files to improve the graphics of the lighting cutsheets. Topic: Plat Comment Number: 14 Comment Originated: 02/12/2013 02/1212013: The boundary and legal description close. NE Response: Noted. Comment Number: 15 Comment Originated: 02/12/2013 02/12/2013: Please add "The" to the subtitle on all sheets. Page 14 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www.bhadesign.com Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 2 Comment Originated: 02/13/2013 02/13/2013: Stormwater is ready for a public hearing with comment 1 and 4 resolved. NE Response: Noted, thankyou. Comment Number: 3 Comment Originated: 02/13/2013 02/13/2013: The City encourages this Development to include more LID practices in the drainage design. This could include bio-retention, porous pavers, etc. NE Response: Noted. Comment Number: 4 Comment Originated: 02/13/2013 02/13/2013: Approval by the Fossil Creek Reservoir Inlet Ditch owners is required for the outfall into their ditch. The location and release has been previoulsy approved, but not the construction details or specifics of the design. NE Response: We have been in discussions with Stephen Smith (Manager with North Poudre Irrigation Company) who manages the Fossil Creek Reservoir Inlet Ditch. Stephen will be obtaining preliminary approval from the Board on March 6, 2013. Department: Technical Services Contact: Jeff County, 970-221-6588, jcountyc&fcgov.com Topic: Building Elevations Comment Number: 5 02/12/2013: No comments. NE Response: Noted. Comment Originated: 02/12/2013 Topic: Construction Drawings Comment Number: 8 Comment Originated: 02/12/2013 02/12/2013: Please add a second benchmark to sheet C000 & C001. NE Response: A second benchmark has been added to sheets C000 and C001. Comment Number: 9 Comment Originated: 02/12/2013 02/12/2013: Please change the Basis Of Bearings Statement to match the Subdivision Plat. NE Response: The Basis of Bearing statement has been revised to match the plat. Comment Number: 10 Comment Originated: 02/12/2013 02/12/2013: There are line over text issues on sheets C200, C201, C300, C301, C302, C401, C500, C501, C502, C503, C504, C505 & C600. NE Response: Drawings have been revised accordingly. Comment Number: 11 Comment Originated: 02/12/2013 Page 13 of 22 landscape architecture I planning I urban design voice: 970.223, 7577 fox: 970.223.1827 www.bhodesign.com Department: PFA Contact: Jim Lynxwiler, 970-416-2869, 1lynxwiler0poudre-fire.org Topic: General Comment Number: 01 Comment Originated: 02/12/2013 02/12/2013: FIRE ACCESS Provide for emergency access to the north side of the hospital. The proposed drive isle surrounding the Helistop would be an acceptable means of access as long as the canopy over the drive isle at the ED entrance is of sufficient height. The current 20' width may be maintained at currently planned. BA Response: The Ambulance drop-off canopy has a clear height of 14'-0" and will provide sufficient emergency access to the north side of the building. Fire access to the north side of the campus is supported by the Fire Marshal. Further discussion on this subject and the subject of roof access is warranted. Please contact Jim Lynxwiler at 416-2869. NE Response: A proposed 20-foot wide emergency access will be provided around the proposed helistop. A turning template exhibit for the private drive around the proposed helistop, dated 2/20/13, was approved by Jim Lynxwiler. Comment Number: 02 Comment Originated: 02/12/2013 02/12/2013: FUTURE EAE TO MOB At this time, EAE to the future Medical Office Bldg. in the SW portion of the campus has not been provided on the Plat. If not added to the Plat now, the EAE shall to be a required addition at the time of future build out of this area. NE Response: An emergency access easement (EAE) will be provided by separate document in the future once this area has been defined in final design. Comment Number: 03 Comment Originated: 02/12/2013 02/1212013: HAZARDOUS MATERIALS The HMIA is under review by PFA. Banner Response: Waiting review comments from PFA Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarquec&fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/13/2013 02/13/2013: Letter of intents are needed for the required off -site drainage easements before a public hearing. These would include a drainage easement for the regional pond and all storm sewers that are located off -site. NE Response: Letter of Intents for off -site drainage easements will be provided prior to public hearing. Page 12 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970.223.1827 www.bhadesian.com WWW.FCGOV.COM. CCRD Response: Noted. ccrd will issue as part of a separate package directly to L&P. An electrical commercial service information form has already been submitted for the initial phase project, dated 01/08/13. Comment Number: 2 Comment Originated: 01/28/2013 01 /28/2013: The quantity, size(s), and location(s) or electric transformers will need to be coordinated with Light & Power Engineering after the 1-line diagrams and Commercial Service forms are submitted. CCRD Response: Noted. Once we submit the 1-line diagram, we will set up a meeting with L&P to coordinate size and location of transformers, fault current available, and metering requirements. Comment Number: 3 Comment Originated: 01/28/2013 01/28/2013: After plans are finalized and approved an AutoCad drawing (version 2008) of the overall utility/site plan will need to be sent to Terry Cox at TCOX@FCGOV.COM. Also a paper of pdf of the final overall utility plan will need to be sent to Doug Martine at DMARTINEna,FCGOV.COM. NE Response: Noted. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General Comment Number: 4 Comment Originated: 01/28/2013 01 /28/2013: After the subdivision plat and site plan are final, and the above information has been provided, Light & Power will need the name and address of where to send the invoices for the electric development charges. There will be 2 invoices, each for 50% of the total. The 1 st 50% invoice will be payable before installation of the electric utility facilities can be scheduled. The 2nd 50% will be payable before the electric system can be energized. Banner Response: Send all invoices to Mark Ostrand C/O Development and Construction, North Colorado Medical Center, 1801 16`h Street, Greeley CO. 80631. Comment Number: 5 Comment Originated: 01/28/2013 01/2812013: A copy of the landscape plan showing planned streetlights was sent to BHA design on 1-28-13. Street tree locations will need to be adjusted to provide a minimum of 40 feet clearance between trees and lights (15 feet if the tree is an ornamental type). BHA Response: The redlines have been received and the street light locations have been shown on the plans. Landscape locations have been adjusted to provide the necessary clearances. Page 11 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970.223.1827 www.bhadesign.com enough to support wetland plugs will be seeded and have supplemental plugs incorporated to aid in establishment. The areas are large and providing only plugs will be cost prohibitive. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 02/13/2013 02/13/2013: Provide tree numbers and percentages on final landscape plan. Select street trees from the City street tree list. BHA Response: The tree numbers and percentages will be added to the final compliance plan. Trees along street frontages have been selected from the City street tree list. Comment Number: 2 Comment Originated: 02/13/2013 02/13/2013: Please upsize trees in the numbers indicated on the tree mitigation plan. Upsized trees to be 3.0 inch caliper shade trees 2.5 inch caliper ornamental trees and 8 foot height evergreen trees. BHA Response: Tree sizing will be indicated in the final compliance plan. Comment Number: 3 Comment Originated: 02/13/2013 02/13/2013: Explore options to save existing trees. Existing trees should be retained to the extent reasonably feasible. Please clearly show existing trees to retain on the landscape plan. BHA Response: Due to necessary over lot grading, few existing trees if any will remain with full build out of the master plan however tree removal and mitigation will be done as necessary by phase. Phase one will leave many of the trees in the south west corner of the property. Comment Number: 4 Comment Originated: 02/13/2013 02/13/2013: Plant note 8.3 should add that tree separations are 10 feet between water and sewer mains and 6 feet between water and sewer service lines. BHA Response: Plant notes have been updated as requested. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartinecafcgov.com Topic: General Comment Number: 1 Comment Originated: 01/28/2013 01/28/2013: A 1-line diagram for each electric service will need to be provided directly to Light & Power Engineering. Also, an Electric Commercial Service Information form will need to be completed for each electric service. This form is available on Page 10 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www.bhodesign.corn elsewhere. Our standard for easements on a collector is 9', is there a specific need for 15' utility easements along Lady Moon? If not then we are in support of narrowing this easement to 9'. NE Response: Plat has been revised to show a 9-ft wide utility easement along the east side on Lady Moon Drive. Comment Number: 25 Comment Originated: 02/13/2013 02/13/2013: Sheet 4 - Per City Code the improvements should be constructed along the entire frontage of a lot regardless of a phasing plan. Multiple lots could be considered to potentially phase some of the public improvements. NE Response: Cinquefoil Lane and LeFever Drive will be designed and constructed along the proposed platted boundary. Topic: Site Plan Comment Number: 23 Comment Originated: 02/13/2013 02/13/2013: Sheet 2 - The sidewalk along Harmony road appears to be in very close proximity to the roadway edge for very long stretches. This does not match the intent of the Harmony corridor standards and could be a safety issue with pedestrians so close to roadway. BHA Response: The sidewalk along Harmony Road has been adjusted to maintain a minimum of 10' clear from the future edge of asphalt and additional curves have been added to increase the sinuosity of the path. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/11/2013 02/11/2013: An Ecological Characterization Study (ECS) was submitted to the City in December 2012 for this project. The ECS finds that the only development -related timing issue is that tree removal must occur outside of the songbird nesting season (April 1-July 31). A note to this effect should be added to the landscape and tree mitigation plans. This issue can be resolved at the time of final plan submittal, should the PDP be approved. BHA Response: A note limiting the tree removal timing window has been added to the landscape and tree mitigation sheets. Comment Number: 2 Comment Originated: 02/11/2013 02/11/2013: The landscape plan indicates several areas to be treated with a wetland seed mix. Based on staff experience, wetland plugs should be installed instead of a seed mix to increase plant success and reduce weed management needs. This can be resolved at time of final plan submittal. BHA Response: The lowest areas of the detention ponds that are expected to be wet Page 9 of 22 voice: 970.223.7577 fax: 970.223.1827 landscape architecture I planning I urban design vry .bhodesian.com would allow for monument signs to be placed closer to the road way. This can be taken to City Council after Planning and Zoning approval and this is the preferred process for engineering. Banner Response: Banner will address after Planning and Zoning approval per the preferred process. Comment Number: 3 Comment Originated: 02/13/2013 02/13/2013: An easement will need to be provided on the plat for the sidewalk along the Harmony Frontage. This sidewalk meanders into and out of the Right of Way and an public access easement will need to be included in the areas that it meanders outside of the right of way. NE Response: Plat has been revised to show proposed meandering sidewalk within proposed easement. Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerichC@fcgov.com Topic: Plat Comment Number: 4 Comment Originated: 02/13/2013 02/15/2013: Staff discussed this further after the Wednesday meeting and discussed the applicant's desire to not have parking on Cinquefoil. Staff could be accepting of keeping the 76' right of way cross section, removing the parking and instead adding center turn lane striping along Cinquefoil. 02/13/2013: Cinquefoil Right of Way needs to be 76' in total for a Minor Collector with parking. Revise callouts on all sheets. NE Response: Cinquefoil Lane and LeFever Drive were revised per agreement with City Engineering and Transportation Department staff. Comment Number: 5 Comment Originated: 02/13/2013 02/13/2013: Was the right of way that was dedicated per Rec. No. 200202066 dedicated as right of way or puclic access easement as we do not typically see "Right of Way Easement"? NE Response: This document is a Deed of Dedication for Right -of -Way to the City of Fort Collins. The note on the plat has been revised to delete the word "Easement". Comment Number: 6 Comment Originated: 02/13/2013 02/13/2013: What is the reasoning for not dedicating the south half of Le Fever Drive at this time? Per City Code all improvements along the frontage of a lot need to be improved and since this project is one lot Le Fever will need to be built. NE Response: The south right-of-way half of LeFever Drive will be dedicated by separate document since it is outside the proposed property line. Comment Number: 22 Comment Originated: 02/13/2013 02/1312013: 15' easements are proposed on Lady Moon and 9' easements are proposed Page 8 of 22 voice: 970.223.7577 fox: 970.223.1827 landscape architecture I planning I urban design www.bhodesign.com Harmony but the Harmory Road improvement and grading plans do not appear to show this design. NE Response: Since the Harmony Road Improvements will not be completed with phase 1 the drawings were set up this way to simplify drawing setup as we move into final compliance. Harmony Road Improvements at Cinquefoil Lane are shown on sheets C200 and C401. Comment Number: 21 Comment Originated: 02/13/2013 02/13/2013: C504 - Verify that right turn lane construction onto Lady Moon and/or ditch relocation will not require a construction easement or disturbance on adjacent lot. NE Response: There is adequate existing right-of-way for proposed improvements. Comment Number: 24 Comment Originated: 02/13/2013 02/l3/2013: C200 - Contact Clark Mapes for review of landscaping in median and what type of double curb or splash guard to use. Owner is responsible for maintenance of landscaping in median. NE Response: A note was added to the proposed median calling out proposed "sloped block" for the PDP re -submittal. Detailed design will be addressed in final compliance as discussed with Clark Mapes. Comment Number: 26 Comment Originated: 02/15/2013 02/15/2013: Double left turn lanes and 2 recieving lanes are identified on the long term TIS study for Lady Moon at Harmony. Right of Way will need to be dedicated to reserve these additional turn lanes in the future. It is engineering's request that an additional 12' be dedicated on this project to plan for the additional left turn lane in the future. The adjacent property to the west will be required to dedicate an additional 12' when it redevelops to account for the additional 12' for a receiving lane. Delich Response: The northbound geometry will be dual left -turn lanes and a combined through/right turn lane, which will fit into the current northbound width (curb -to -curb). Therefore, additional right-of-way will not be required on the east side (Banner) of Lady Moon Drive. The southbound portion will need to widen on the west side of Lady Moon Drive. Topic: Plat Comment Number: 2 Comment Originated: 02/13/2013 02/13/2013: Please consider vacating right of way along the east side of Lady Moon north of the right in, right out entrance. This would need to be done by seperate document but Page 7 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970,223.1827 www.bhadesign.com Comment Number: 14 Comment Originated: 02/13/2013 02113/2013: C401 - Some grades at the north end of the property appear to be very steep for a sidewalk, perhaps a culvert or chase could be used. NE Response: As discussed with Andrew Gingerich this will be addressed in Final Compliance Comment Number: 15 Comment Originated: 02/13/2013 02/13/2013: C500 - Provide profiles and cross sections for median during Final Submittal. NE Response: Noted. Comment Number: 16 Comment Originated: 02/13/2013 02/13/2013: C500 - Please revisit vertical curve length using 40 mph as the design speed for the collector road type. NE Response: Cinquefoil Lane's vertical alignment was designed to the Minor Collector criteria with a design speed of 40 mph. LeFever Drive's vertical alignment was designed to the Commercial Local criteria with a design speed of 30 mph. Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings Comment Number: 17 Comment Originated: 02/13/2013 02/13/2013: C502 - Revise the cross section on this sheet to be a minor collector with 76' of right of way. NE Response: Cinquefoil Lane and LeFever Drive were revised per agreement with City Engineering and Transportation Department staff. Comment Number: 18 Comment Originated: 02113/2013 02/13/2013: C502 - Extend offsite improvement design further to the south on Cinquefoil to show how ittiesintotheexisting intersection of Cinquefoil/Steelhead St -to -ensure it will work and the alignment stays consistent. NE Response: An exhibit that shows horizontal and vertical alignments for Cinquefoil Lane from LeFever Drive to Steelhead Street was presented to City engineering staff on Thursday 2/21/13. City Engineering Department staff acknowledged that this exhibit satisfies the City's requirement. Comment Number: 19 Comment Originated: 02/13/2013 02/13/2013: C504 - Revise the Keymap on this sheet. NE Response: The key map has been revised. Comment Number: 20 Comment Originated: 02/13/2013 02/13/2013: C504 - Plans show a right turn lane being proposed onto Cinquefoil from Page 6 of 22 landscape architecture I planning I urban design voice: 970.223,7577 fox: 970.223.1827 w w.bhodesign.coin Way and easements. Please revise and their locations. NE Response: Proposed monument sign locations have been revised. Note was added to sheets specifying "All proposed monument sign locations are shown for reference only and will be permitted through a separate sign permit". Comment Number: 9 Comment Originated: 02/13/2013 02/13/2013: C200 - How is the security gate to be operated on Cinquefoil Lane? It shall be positioned to allow for on vehicle to pull in and wait for gate to open without blocking sidewalk. This can be discussed further as we get more information on it's operation, type of vehicles accessing, etc. NE Response: The operation details for security gate will be addressed in final compliance as agreed upon with City staff. Comment Number: 10 Comment Originated: 02/13/2013 02/13/2013: C300 - A water service shall be provided for the median in Lady Moon to allow irrigation of the median landscaping. NE Response: Drawings have been revised to show a water service tap for the proposed Lady Moon Median. Comment Number: 11 Comment Originated: 02/13/2013 02/13/2013: C400 - Provide easements for drainage and the detention pond on the offside portion to the east. NE Response: A Letter of Intent (LOI) will be provided by Les Kaplan for offsite drainage easements. Comment Number: 12 Comment Originated: 02/13/2013 02/13/2013: C301 - Please check the location of the storm manhole in Lady Moon and ensure that it does not interfere with proposed median curb and gutter. Revise the location of the light pole in the middle of the site as it is in conflict with proposed storm sewer. NE Response: The proposed Lady Moon median extension has been slightly revised to avoid potential conflict with existing manhole. Comment Number: 13 Comment Originated: 02/13/2013 02/13/2013: C401 - Numerous Driveways appear to have greater than 750 sq. ft. of runoff draining out of them. Please revise the grading or provide additional improvements to keep runoff to less than 750 sq. ft. NE Response: As discussed with Andrew Gingerich this will be addressed in Final Compliance. Page 5 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fax: 970.223.1827 www.bhadesign.com 511aWc I Gll the entrance plaza. Please also widen the sidewalk path leading to the ER entrance from the main north/south 8 foot walk. BHA Response: Paths linking transit stops to the building entries have been widened to 8'min including the link between the west parking area and the ER entrance. Comment Number: 2 Comment Originated: 02/12/2013 Minor corrections: The owner's certification is not the correct form; Le Fever Drive needs to be labeled; label adjacent uses and zoning per the checklist; Note 7: what specifically does this mean?; please dimension the Harmony 80' setback on sheet 2 of 6. Please see redlines for further detail and comments. BHA Response: The owner's certification has been updated. Le Fever Drive is now labeled. Adjacent zoning is indicated in the vicinity map. Note 7 refers to the extent of improvements being limited to phase specific requirements. Extent of improvements chase will be addressed with final compliance plans. The 80' setback has been labeled on sheet 2. Redline comments have been addressed. Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerichc&fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 02/13/2013 02/15/2013: Staff discussed this further after the Wednesday meeting and discussed the applicant's desire to not have parking on Cinquefoil. Staff could be accepting of keeping the 76' right of way cross section, removing the parking and instead adding center turn lane striping along Cinquefoil. 02/13/2013: C000 - Revise cross sections to include Cinquefoil as a Minor Collector with 76' Right of Way and parking as was previously discussed in email. NE Response: Cinquefoil Lane and LeFever Drive were revised per agreement with City Engineering and Transportation Department staff. Comment Number: 7 Comment Originated: 02/13/2013 02/13/2013: C200 - Concrete in private driveways needs to extend back to the Right of Way. If the right of way is not vacated for the right in, right out on Lady Moon then we may make an exception for this Driveway since the Right of Way is so far behind the Cross pan. NE Response: Drawings have been revised to show proposed concrete being extended to R.O.W. Comment Number: 8 Comment Originated: 02/13/2013 02/1312013: C200 - Numerous monument signs appear to be shown with in the Right of Page 4 of 22 voice: 970.223.7577 fax: 970.223.1827 landscape architecture I planning I urban design www.bhadesign.com Comment Number: 10 Comment Originated: 02/13/2013 Further information is needed on the building elevations. It would be helpful to label the extent of projections and recesses at significant areas on each elevation. Also please dash in phase one vs. the complete build on the key maps. BA Response: The resubmitted drawings will indicate the phases on the key plan. The design team reviewed perspective images with the City to illustrate the extent of the projects. Topic: Landscape Plans Comment Number: 3 Comment Originated: 02/1212013 Sidewalk along Harmony- The Harmony Corridor Design Standards require that the sidewalk be set back from the edge of pavement at least 10 feet where approaching the intersection. Additionally, the sidewalk is required to meander substantially with a greater separation from Harmony Road. This is both a desired aesthetic and addresses safety concerns. It appears that the detention area has grown since the original concept and is now closer to Harmony than originally planned, which complicates the area further. The sidewalk will need to be incorporated into the detention area with low wall that match building material stone. BHA Response: The sidewalk along Harmony Road has been adjusted to maintain a minimum of 10' clear from the future edge of asphalt and additional curves have been added to increase the sinuosity of the path. Comment Number: 4 Comment Originated: 02/12/2013 Please see redlines for detailed landscape comments. Staff is concerned that the 10' no irrigation perimeter around buildings is excessive and creates areas within the plan where there is no foundation planting. Additionally more trees need to be shifted and incorporated into the private drive parkway. Quantities are also needed on the plant list and table information addressing tree diversity and Harmony oak standards. BHA Response: The landscape plan has been adjusted with several trees relocated to the tree lawn along the loop road. The 10' no planting zone has been maintained as required by the soils report. This setback will be revisited and reduced as allowed by subsequent soils analysis. The foundation aesthetic is important to the project and will be addressed with appropriate site treatments such as boulders, low walls, planters, etc. where constraints do now allow for typical landscape treatments and will be depicted with the final compliance plan. Plant quantities will be included with the final �C compliance plan. Topic: Site Plan Comment Number: 1 Comment Originated: 02/12/2013 The distance from the Tranfort stops to the main entrance is a concern. Is there a shuttle system planned, and if so, an 8 foot sidewalk should be provided from the transit stops to Page 3 of 22 voice: 970.223.7577 fox: 970.223.1827 landscape architecture I planning I urban design wvrv.bhodesign.com BA Response: Additional masonry material has been introduced to create a distinct base. A base treatment at EIFS location has also been incorporated. On the south elevations, additional masonry planes have been added for the final build. Phase One elevations have been updated with additional masonry planes and a more defined base treatment where EIFS is used. Comment Number: 7 Comment Originated: 02/12/2013 The parapets now extend to hide mechanical equipment on the roofs. This gives the building a more mass dominant appearance so windows appear slight in comparison. We would suggest the consideration of more glazing and larger openings to improve daylighting into the interior the building. BA Response: Because healthcare facilities have higher floor -to -floor heights windows will not have the same proportions as other buildings. The design incorporates vertical sunshades set higher than the window head to create a more traditional proportion between the size of the wall and the window. Many of the planned windows in public locations extend from the floor to the ceiling creating ample daylight in these areas. Windows in the patient rooms are set 2'-8" off the finished floor and extend to the ceiling. Department: Current Planning Contact: Jason Holland, 970-224-6126, jhollandCcDfcgov.com Topic: Building Elevations Comment Number: 8 Comment Originated: 02/12/2013 More discussion is needed regarding the placement of the Loveland stone and whether it is the best choice, or would a more horizontal cut pattern fit the overall style of the building better, such as the patterns used with recent additions at CSU. The stone pattern used with the police station on Drake would also be a good example. BA Response: Stone placement is used to denote major entry points to the facility as well as locations where users will access exterior courtyards. The use of stone provides simple wayfinding solutions to the building and is the most appropriate material for locations that are most tangible to users. Comment Number: 9 Comment Originated: 02/13/2013 We want to ensure that sufficient contrast and color harmony is achieved with the material section. The perspective renderings show the Type A CMU in a more beige hue. It would be helpful for the perspectives to more accurately reflect the red and brown hues shown with the Type A photograph. The color of the sunshades may also be a concern. BA Response: Additional detail has been shown to the City to represent the materials more accurately and how the richness of the materials respond to the changing light throughout the day. Page 2 of 22 landscape architecture I planning I urban design voice: 970,223.7577 fox: 970.223.1827 www.bhodesign.com 40- BHA Design In...,rporoted 1603 Oakridge Drive Fort Collins. CO 80525 March 13, 2013 Mr. Jason Holland Current Planning City of Fort Collins 281 North College Avenue Fort Collins, CO 80521 RE: Harmony & Lady Moon Medical Campus (Banner Health Medical Campus) Dear Jason, We are pleased to resubmit the Project Development Plan and Subdivision Plat documents for your review for the Banner Health Medical Campus project at the south east corner of Harmony Road and Lady Moon Drive. The following are responses to the initial Preliminary Development Plan review comments: Comment Summary: Department: Current Planning Contact: Jason Holland, 970-224-6126, jhollandC�fcgov.com Topic: Building Elevations Comment Number: 5 Comment Originated: 0211212013 Staff is most concerned with the extensive use of concrete masonry units as a siding material. We would need to get more and better photographic images of a similar building in order to feel more comfortable with the extensive use of this material. We would also need a board for all materials including metal panels and sunshades, for review, including product information. A dimensional reference for the CMU Types A and B are needed on the plans. BA Response: Additional information has been provided to the City as requested showing the detail and quality of the material. Comment Number: 6 Comment Originated: 02/12/2013 Overall the design does a good job of breaking up the building mass into a series of intersecting wall planes in a module format. While this does not follow the Building Standards in terms of base, middle and top, the concept of modules to break up the horizontal and vertical mass of the building elevation could be supported with additional module and base plane treatment. Areas of wall plane where stories are expressed over large expanses with only one masonry material are in need of more vertical relief, in particular the bed towers. More modules of stone and CMU material are needed to break up areas with large expanses of EIFS, such as the south elevation. EIFS is overemphasized. Phase One walls also need further material balance. Please refer to redlines. Page 1 of 22 landscape architecture I planning I urban design voice: 970.223.7577 fox: 970.223.1827 www. bhodesig n.com