HomeMy WebLinkAboutSUNOL ACRES (LOT 1, STROEBEL M.R.D.) - PDP - 31-97 - CORRESPONDENCE - (8)Comna,..Itity Planning and Environmentai. d"ervices
Current Planning
City of Fort Collins
Mr. Dick Rutherford
Stewart and Associates
103 South Meldrum Street
Fort Collins, CO 80521
Dear Dick:
The following comments have been received regarding Sunol Acres.
January 8, 1998
1. An additional strcet tree should be added to Charlie Lane in the location shown on the attached photo
COPY.
2. Please add the following notes to the Landscape Plan:
A. "Tree/Utility separations shall not be used as a means of avoiding the planting of required
street trees."
B. "Topsoil that is removed during construction activity shall be conserved for later use on
areas requiring revegetation and landscaping."
C. "Prior to installation of plant materials, areas that have been compacted or disturbed by
construction activity shall be thoroughly loosened Organic amendments such as compost,
peat or aged manure shall be thoroughly incorporated at a rate of at least three (3) cubic
yards of amendment per 1,000 square feet of landscape area"
3. A Final Soils Report and Pavement Design will be required for the street prior to construction. New
borings will need to be made after utilities are installed and the streets are rough graded The
pavement design needs to be based on the new borings and based on other data from the City's
Engineering Department. For further information, please contact Rick Richter, 221-6605.
This concludes our comments at this time. As always, please call if you have any questions or concerns
regarding these comments.
SincerelLShepard
Ted
Senior Planner
Enc.
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020