Loading...
HomeMy WebLinkAboutSUNOL ACRES (LOT 1, STROEBEL M.R.D.) - PDP - 31-97 - CORRESPONDENCE -Commi y Planning and Environmental .vices Current Planning City of Fort Collins July 5, 2000 Mr. Dick Rutherford Stewart and Associates 103 South Meldrum Street Fort Collins, CO 80525 Dear Dick: Thank you for re -submitting plans for Sunol Acres on June 2, 2000. The following comments are offered: Please refer to the attached comment sheet and redline Utility Plan from the Engineering Department. 2. Please refer to the attached comment sheet and redline Utility Plan from the Stormwater Department. Please note that the necessary offsite drainage easements must be signed by the grantor(s) prior to the public hearing. 3. Please refer to the attached comment sheet and redlined Utility Plan from the Water and Wastewater Department. 4. Please re -label the plan set so that sheet 2 of 3 becomes sheet 1 of 3 since sheet 2 contains the signature blocks and site data. Then add to the title block of original sheet 1 so it reads "Context Diagram and Site Plan." 5. Please provide an updated affected property owners' mailing list based on the map that we previously provided. We can make another map if you need. We will need these names on self-adhesive mailing labels. Please provide $0.50 cents per name. We cannot schedule and advertise the public hearing without this list. (Repeat comment.) This concludes Staff comments. Please be aware that if revised plans are not received within 90 days of the date of this letter, the Director may remove the project from the development review process. Hopefully, this will not be the case as the comments are of a minor nature. Please note that the easements and mailing list are essential in order for this project to proceed. Sincere Ted Shepard Chief Planner 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020