Loading...
HomeMy WebLinkAboutSUNOL ACRES (LOT 1, STROEBEL M.R.D.) - PDP - 31-97 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. �f vivoz- fic,GEC!' s�,� . �. .) Planner: DA'yE c! TiL/NG Ek ? Traffic Operations: Engineer: Date: Nov. 8, 1998 Site I land Items Requested Plat Utility Drainage Rpt Other Items Required Site Redlined Items Being Returned land Plat Utility Drainage Rpt Other Items Being Returned Engineering X X / Stormwater >< X, X v Ae'l Rrics t,End Z /AIV 0 -xc A Pr Water/Wastewater Traffic Operations Trans. Planning Transfort Natural Resources Park Planning Totals Other: a rAd 7Z n.e A-11y A-0F 44SE/'sE'N7f 2' I` 7,crt w�}T�X 27EX 7v 8&7 Vc Note: All redlined items should be returned with the resubmittal/ revisions. U 6-riO-V�c-q- lctif' (= - ('et I i ✓i e5 Revisions Routing Sheet FILE: PROJECT PLANNER ����►��r������ ENGINEERING: PAVEMENT mmmm BUILDING INSPECTION El m Elmmm 'mmm ElNEW ADVANCE PLANNING ME El MwElm WATER CONSERVATION WE Elm MmM POST OFFICE m 0 El El Elmmmmm m El El mmmmm PUBLIC SERVICE m El El M Elmm m IN El El MmmMl STATE HIGHWAY DEPARTMENT El El El m DITCH COMPANY m m El El mom RAILROAD: UP or BN/CS 0 WE MEN m ME El MEW= mmo mmmm©mmmmmmm ..c..J V/-/,