HomeMy WebLinkAboutNORTH COLLEGE DRIVE THRU - PDP - PDP160014 - CORRESPONDENCE -Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/02/2016
05/02/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, waamargue@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 05/04/2016
05/04/2016: Please show the existing water main on the utility plan.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcqov.com
Topic: General
Comment Number: 5 Comment Originated: 05/04/2016
LUC 3.2.4 (C) Due to the amount of public and decorative lighting in the area, a
photometric site plan will not be required; however, if there is any proposed
lighting on the building, we will need cut -sheets of the fixtures.
R
Comment Number: 21 L omment Originated:
05/03/2016
08/10/2016: There are still issues. See redlines.
05/03/2016: All benchmark statements & Basis Of Bearings statements must
match on all sheets.
Comment Number: 23 Comment Originated:
05/03/2016
08/10/2016: There are still incorrect descriptions. See redlines.
05/03/2016: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 24 Comment Originated:
05/03/2016
08/10/2016:
05/03/2016: Some of the right of way descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 28 Comment Originated:
08/10/2016
08/10/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Comment Number: 29 Comment Originated:
08/10/2016
08/10/2016: There are line over text issues. See redlines.
Topic: Plat
Comment Number: 4 Comment Originated: 05/03/2016
08/10/2016: Emergency Access Easement information will be needed.
05/03/2016: Please address the comments regarding access to the north of
the property. See redlines.
Comment Number: 25 Comment Originated: 08/10/2016
08/10/2016: Please change the title to "North College Drive Through" to match
the other plans.
Comment Number: 26 Comment Originated: 08/10/2016
08/10/2016: There are spelling issues. See redlines.
Topic: Site Plan
Comment Number: 27
08/10/2016: There are spelling issues. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221.6820, nhahn@fcgov.com
Topic: General
Comment Number: 2
08/09/2016: No additional comments.
Comment Originated: 08/10/2016
Comment Originated: 08/09/2016
Comment Number: 16
comment Originated: 08/10/2016
08/10/2016: Staff remains concerned about screening headlights of cars
stacking in the eastbound drive -through lane. The Landscape Plan calls for a
hedge of Dwarf Korean Lilacs to act as a screening treatment but these plants
may not be effective on a year-round basis. Please select another species that
is effective during the winter months. Staff has seen the Blaauw Juniper used
with success in similar environments. Also, would there be sufficient land area
for a low (two to three feet high) earthen berm in this area to supplement the
plants to enhance the screening?
Comment Number: 17 Comment Originated: 08/10/2016
08/10/2016: Be sure that the trash and recycling area is large enough to accommodate
containers for used cooking oil.
Comment Number: 18 Comment Originated: 08/10/2016
08/10/2016: Since there is no Lighting Plan, please add to Note Six that pole
lighting, if located used along the west and south property lines, must be
equipped with House -Side Shields. And, please add to this note that if LED is
used as the light source for exterior lighting, the Kelvin temperatures must not
exceed 3,000 degrees.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcqov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 05/04/2016
08/09/2016: Repeat will look for materials at FDP.
05/04/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, waamargue@fcgov.com
Topic: General
Comment Number: 5
08/10/2016: Please add a LID table to the drainage plan.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Construction Drawings
Comment Originated: 08/10/2016
Comment Number: 19 Comment Originated: 05/03/2016
08/10/2016: There are still issues. See redlines.
05/03/2016: Please make corrections to the Benchmark Statement as marked.
See redlines.
4
Department: PFA
Contact: Jim Lynxwiler,
Topic: General
970-416-28697 llynxwiler@poudre-fire.org
Comment Number: 4
Comment Originated: 08/10/2016
08/10/2016: FIRE LANE MARKING
Fire lanes signs must be provided and labeled on future plans. Redline
corrections given to project team on 8/10/16
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcqov.com
Topic: General
Comment Number: 2 Comment Originated: 05/04/2016
05/04/2016: It is not clear from the site plan the status of the existing fence and
its location along the west and south property lines. Who owns this fence? Is
the fence six foot high solid wood or is it chain link? Given the fact that an
auto -related use, with evening hours of operation, is being proposed next to
residential, this fence takes on added importance in accomplishing
compatibility. Staff will inspect this fence to determine its ability to provide the
necessary buffering called for in Sections 3.5.1(1-1)(1)(J). If not suitable, a new
fence (with gate or opening for the aforementioned walkway) will be required.
Carried Over: August 10, 2016 - This comment has not been addressed. Staff
has inspected this fence that runs along the entire west property line and a
portion of the south property line. It is a six-foot, solid, cedar fence in poor
condition. While the height, and the fact that it's solid, contributes to buffering a
drive -through restaurant from the adjoining residential, Staff is concerned about
its deteriorating quality. It appears that this fence will not stand up to site
grading and development. Further, its poor quality will only be magnified in the
context of the proposed site upgrades and new building. Consequently, this
fence must be replaced in conjunction with the redevelopment. The applicant is
encouraged to consider a fence design that is reflective of the overall quality of
the proposed redevelopment. The new fence must include an opening to
accommodate the connecting walkway in the southwest corner of the site.
Comment Number: 9
Comment Originated: 05/04/2016
05/04/2016: The Landscape Plan needs to indicate how the electrical
transformer will be screened. Will screening be by a solid enclosure (meeting
the required clearance specifications) or by landscaping?
Carried Over: August 10, 2016: The proposed location of the electrical
transformer is in close proximity to the entrance and is visible from North
College Avenue. Please consider a more discreet location. Be sure that the
transformer is within ten feet of hard surface and screened from public view.
3
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcqov.com
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 08/10/2016
08/10/2016:
On sheet 5 of 6 in note number 2 incorporate this information into what is stated.
Spade harvested and transplanted trees shall also meet the plant quality
requirements in General Landscape note number 1 as defined by the American
Association of Nurserymen standards.
Comment Number: 4 Comment Originated: 08/10/2016
08/10/2016:
It appears that there may be only 10 mitigation trees provide for on the
landscape plan with 11 required. Check and if needed please identify an
addition mitigation tree.
Comment Number: 5 Comment Originated: 08/11/2016
08/11 /2016:
The two existing trees furthest to the east in the middle of the lot are labeled as
lanceleaf cottonwood but they are actually Siberian elm. The other information
recorded for these two existing trees is correct.
Department: Light And Power
Contact: Coy Althoff, CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/02/2016
05/02/2016: Light & Power has primary electric facilities running along the west
side of N. College Ave. in front of these properties. Both single and 3-phase
power is available to this area.
Comment Number: 2 Comment Originated: 05/02/2016
05/02/2016: Development charges, electric Capacity Fee, Building Site
charges and any system modification charges necessary will apply to this
development.
Comment Number: 6
Comment Originated: 05/02/2016
05/02/2016: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 7 Comment Originated: 05/02/2016
05/02/2016: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 8 Comment Originated: 08/01/2016
08/01/2016: Comments 3, 4 and 5 resolved. No other changes on behalf of
Light & Power.
2
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. corn/developmentreview
August 12, 2016
Sam Coutts
Ripley Design, Inc.
419 Canyon Ave Ste 200
Fort Collins, CO 80521
RE: North College Drive Thru, PDP160014, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343 ortshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Comment Number: 3
Comment Originated: 05/03/2016
08/09/2016: A reference to the offsite access easement should be included on
the plat. 05/03/2016: Legal public access from the North into the site needs to
be confirmed -assuming emergency access will need to be dedicated here, the
most simple way to do this is to dedicate an emergency access and access
easement for the driveway by separate document. The recording number for
this easement will need to be on the plat.
Comment Number: 9
Comment Originated: 08/01/2016
08/01/2016: Tom Knostman, City Pavement Engineer, would like the existing
frontage to be better defined and any modifications or improvements for
access/ADA need to be noted. Tom can be reached at 221-6576.