HomeMy WebLinkAboutLEGACY AUTO - PDP - PDP120001 - CORRESPONDENCE - (8)04/02/2013: You are including the portion of Hall Addition First Filing in the square footage that
was dedicated as right of way at reception #20110016834.
Topic: Site Plan
Comment Number: 15 Comment Originated: 02/08/2012
04102/2013: Sheet PDP-CVR still has a title of Legacy Tractor.
02/08/2012: Please correct the project name on all sheets to Legacy Auto.
Comment Number: 19 Comment Originated: 02/08/2012
04/02/2013: There are still line over text issues.
02/08/2012: There are line over text issues.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford(a)fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 04/02/2013
04/02/2013: S&S Notes, Sht 2; please revise all occurances of the notes that state Local Entity
Engineer to state Local Entity Traffic Engineer.
Department: Transportation Planning
Contact: Emma McArdle, 970-224-6197, emcardleaa�fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 04/05/2013
04/05/2013. Please make sure the bus stop is located in a "transit easement" on your plat.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington CDfcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 02/07/2012
04/02/2013: The water main will likely have to connect to the 4" main in College. Get field
locates on ALL utilities along College south to the existing 4" water main ,and schedule a
meeting to review prior to the next submittal. It may be heldpful to have PFA also attend the
meeting.
02/07/2012: As noted at the November 22, 2010 conceptual review, this project will be
responsible for extending the water main at the northeast corner of the site with the objective of
connecting to one of the existing mains in the area. Schedule a meeting with Poudre Fire
Authority and Water Utilities staff to review and discuss options.
Comment Number: 2 Comment Originated: 02/07/2012
04/02/2013. There is no sewer in College; therefore, it is doubtful that the service extends east
as shown. It is suggested that a dye test be done to confirm the point of connection.
02/07/2012: Show the sewer service to the existing building.
Comment Number: 3 Comment Originated: 02/07/2012
04/02/2013: Add Standard Detail.
02/07/2012: Label sewer service clean -outs as traffic rated and add the standard detail.
Comment Number: 5 Comment Originated: 04/02/2013
04/02/2013: See redlined utility plans for other comments.
Comment Number: 34 Comment Originated: 04/02/2013
04/02/2013: There is a line that is running through the truncated dome detail on sheet 8.
Topic: General
Comment Number: 21 Comment Originated: 02/08/2012
04/02/2013: These plans were not resubmitted.
02/08/2012: There are line over text issues on the Architectural Details sheet.
Topic: Lighting Plan
Comment Number: 20 Comment Originated: 02/08/2012
04/02/2013: Are the line over text issues on these plans going to take away from the
readability? If so, please address the text issues.
02/08/2012: There are line over text issues.
Topic: Plat
Comment Number: 1 Comment Originated: 02/08/2012
02/08/2012: The boundary closes.
Comment Number: 5 Comment Originated: 02/08/2012
04/03/2013: This has not been changed. The subtitle must include "being a part of Hall Addition
First Filing".
02/08/2012: Please add the additional text to the subtitle, as shown on sheet 1.
Comment Number: 6 Comment Originated: 02/08/2012
04/02/2013: This has been addressed, but there are still issues with the square footages.
02/08/2012: Please add a total area to the ownership & subdvision statement.
Comment Number: 9 Comment Originated: 02/08/2012
04/03/2013: Please add the easement information for the pending Stormwater easement at the
northeast comer of the property.
02/08/2012: Please add easement descriptions to sheet 2.
Comment Number: 13 Comment Originated: 02/08/2012
04/03/2013: This has not been added.
02/08/2012: Please label & define the R.O.W. dedicated by the Hall Addition plat.
Comment Number: 28 Comment Originated: 02/08/2012
02/08/2012: If the pending Stormwater easement that we have shown on sheet 2 is recorded
before this plat, it will need to be shown on the plat & recording information referenced.
Comment Number: 29 Comment Originated: 04/02/2013
04/02/2013: Please change "person" to "persons" in the Statement Of Ownership And
Subdivision.
Comment Number: 30 Comment Originated: 04/02/2013
04/02/2013: The symbol along the south boundary line, looks like it is covered over. If it is a
new symbol, add a triangle symbol & description to the legend.
Comment Number: 31 Comment Originated: 04/02/2013
04/02/2013: The recording date shown on sheet 2 for Book 1413, Page 610 does not match
the legal description or the Larimer County Clerk & Recorder's website.
Comment Number: 32 Comment Originated: 04/02/2013
02/07/2012: A drainage easement is required for the existing storm sewer outfall which drains
the mobile home park to the north. This storm sewer is located in the northeast part of the site.
Comment Number: 6 Comment Originated: 02/07/2012
02/07/2012: A drainage easement is required for the limits of the detention pond.
Comment Number: 7 Comment Originated: 02/07/2012
02/07/2012: Water quality is required per Volume 3 of the Urban Drainage Manual. This
includes a certain water quality volume associated with the type of mitigation. Snouts by
themselves do not meet the City's water quality requirements.
Comment Number: 8 Comment Originated: 02/08/2012
02/08/2012: The drainage easements for the storm sewers need to be 20 feet unless it can be
shown 15 feet will work using OSHA trenching quidelines.
Comment Number: 9
Comment Originated: 02/08/2012
02/08/2012: Some freeboard is required for the detntion pond to safely direct the flows over
the emergency spillway. One foot is the requirement. Six inches may work for this site if the
flow depth of the emergency spillway is 3 inches.
Comment Number: 10 Comment Originated: 02/08/2012
02/08/2012: In the text of the report, please address the 4 step process related to BMPs per
Volume 3 of the Urban Drainage Manual.
Comment Number: 13 Comment Originated: 04/08/2013
04/08/2013: A drainage easement is required for the storm sewer outfalling the property to the
north. It is located in the northeast portion of the site. The City will provide survey information
on the exact location of the storm sewer.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty(a)fc4ov.com
Topic: Building Elevations
Comment Number: 22
04/02/2013: These plans were not resubmitted.
02/08/2012: There are conflicting notes on sheet PDP-A4.1.
Topic: Construction Drawings
Comment Number: 24
Comment Originated: 02/08/2012
Comment Originated: 02/08/2012
04/02/2013: Both benchmarks listed have been destroyed by road construction, and have
been replaced with new benchmarks. Sheet 2 still needs a second benchmark added.
02/08/2012: Please add a second benchmark to sheets 1 & 2.
Comment Number: 26
Comment Originated: 02/08/2012
04/02/2013: There are still line over text isues on these sheets.
02/08/2012: There are line over text issues on sheets 3-5.
Comment Number: 27
04/02/2013: This is still an issue.
Comment Originated: 02/08/2012
02/08/2012: The profiles on sheet 6 could be easier to read, if the linework & text are brought
in front of the profile gridlines.
Comment Number: 33 Comment Originated: 04/02/2013
04/02/2013: Please change the index on sheet 1 to match the titles of sheets 4 & 5.
Comment Number: 11 Comment Originated: 02/10/2012
02/10/2012: Erosion Control Report:
Please use City Ordinance 174, 2011, specifically, Volume 3, Chapter 7, Section 1.3.3 Titled
"PDP Erosion Control Report and Drawings Submittal Requirements." To assure your supplying
the correct information for you Erosion Control Report.
Comment Number: 12 Comment Originated: 02/10/2012
02/10/2012: Erosion Control Drawing (Plans):
a) On your General Details Page (2 of 10) says on line #11 that BMPs cannot be removed
except under the direction of a "Local Entity Engineer" who might this be? I believe you mean
Local Erosion Control Inspector? Double check all the written details to assure you are talking
about the correct person in the City.
b) On the General Details Page (2 of 10) on #13 your sheet says 90 Days which for the city
is 30 days. This also is confusing because your Details on the Erosion Control Sheet (7 of 10)
says 30 days, make sure you clarify the 30 Days in all locations.
c) VTC Details, Use larger Rock, 3-6" is better for a purpose of a tracking pad. Also if the
tracking pad is to be truly 50ft long, you might want to try drawing the VTC to scale on the plans.
Also on the detail it says to remove the soil at''/2 the filter depth, how do you measure a filter
depth on a tracking pad? Also describe how to maintenance the tracking pads? If you simply
mean stir the rocks and remove excess sediments, say that, you want to make this document
pretty clear to the builder what is expected on site.
d) Your drawings did not contain any of the sequence drawing as prescribed in the
requirements. Look over ordinance 174 to help clarify.
Please use City Ordinance 174, 2011, specifically, Volume 3, Chapter 7, Section 1.3.3 Titled
"PDP Erosion Control Report and Drawings Submittal Requirements." To assure your supplying
the correct information for you Erosion Control Drawings.
Topic: General
Comment Number: 1
Comment Originated: 02/07/2012
02/07/2012: The Development is required to detain half of College Avenue along the site's
frontage. These flows need to be routed into the detention pond.
Comment Number: 2
Comment Originated: 02/07/2012
02/07/2012: The site needs to detain basin 4 as well. These flows should be able to be routed
into the inlet near the southern boundary of the site.
Comment Number: 3
Comment Originated: 02/07/2012
02/07/2012: The designed flows that would leave the pond over the emergency spillway need
to be analyzed and shown how they can pass through the properties to the south and west
without inundating any structures to the nearest public right-of-way.
Comment Number: 4
Comment Originated: 02/07/2012
02/07/2012: The detention pond needs to meet the requirements in the City of Fort Collins
Detention Pond Landscape Standards.
Comment Number: 5 Comment Originated: 02/07/2012
Comment Number: 1
01/23/2012: No comments
Department: PFA
Contact: Jim Lynxwiler,
Topic: General
Comment Originated: 01/23/2012
970-416.28691 jlynxwiler(a)poudre-fire.org
Comment Number: 2
04/03/2013: WATER SUPPLY
Comment Originated: 04/03/2013
Hydrant spacing and flow must meet minimum requirements based on type of occupancy.
COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi residual pressure,
spaced not further than 300 feet to the building, on 600-foot centers thereafter.
2006 International Fire Code 508.1 and Appendix B
The location of the proposed building in Phase IV will exceed the allowable maximum distance
to the nearest hydrant on College. Another hydrant will be required along the EAE on the east
side of building IV.
Comment Number: 3 Comment Originated: 04/03/2013
04/03/2013: FDC
Fire Department Connections shall be installed in accordance with NFPA standards. Fire
department connections shall be located on the street side of buildings, fully visible and
recognizable from the street or nearest point of fire department vehicle access. The location of
the FDC shall be approved by the fire department.
2006 International Fire Code 912.2
Comment Number: 4
Comment Originated: 04/03/2013
04/03/2013: KEY BOXES REQUIRED
Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved
location(s) on every new building equipped with a required fire sprinkler or fire alarm system.
The top shall not be higher than 6 feet above finished floor.
2006 International Fire Code 506.1 and Poudre Fire Authority Bureau Policy 88-20
Comment Number: 5 Comment Originated: 04/03/2013
04/03/2013: PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from
the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals
on a contrasting background.
2006 International Fire Code 505.1
Contact: Ron Gonzales, 970-416-2864, ronzales cDpoudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 02/10/2012
02/10/2012: Please, verify all turning radii are 25 feet inside and 50 feet outside.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(cDfcgov.com
Topic: Erosion Control
Department: Internal Services
Contact: Steve Olt, 970-221-6341, solt(o)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/08/2012
02/08/2012, Helen Matson of the City's Real Estate Planning Department offered the following
comments:
a.The acquisition on North College Avenue has been finalized. The Warranty Deed was
recorded at Reception #20110016834 in Larimer County. The property boundary should be
moved westerly accordingly.
b.The Stormwater Utility is planning a project in this area. Real Estate Planning will be
contacting the "owner" to see if projects jive.
Comment Number: 2
Comment Originated: 02/08/2012
02/08/2012: Russ Hovland of the Building Inspection Department is forwarding a letter to the
Applicant that addresses: 1) a Building Permit Pre -Submittal Meeting; 2) Adopted codes that
construction shall comply with, and, 3) Legacy Auto, project specific concerns.
Department: Light And Power
Contact: Doug Martine, 970.224.6152, dmartineia fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/01/2012
03/25/2013: At least a basic design of the electric system needs to be coordinated with Light &
Power Engineering to confirm that there are no conflicts and that the electric utility utility system
can be installed. For example, it appears that it makes both electrical and economic sense to
consolidate both buildings from one transformer.
02/01/2012: Electric development and system modification charges will apply. Please
coordinate power requirements with Light & Power Engineering at (970)221-6700.
Comment Number: 4 Comment Originated: 03/25/2013
03/25/2013: At area light is shown just east of the transformer adjacent to the phase IV building.
The east side of the transformer will be the front side which must have 8 feet of unobstructed
clearance in front. The other 3 sides must have a minimum of 3 feet clearance. The size of the
transformer cannot be confirmed without knowing the electric loads to be on each building. The
most likely transformer will be 67' wide x 4'8" deep
Comment Number: 5 Comment Originated: 03/25/2013
03/25/2013: A new 6" water main is shown near the N.E. corner of the site. This water main
appears to be virtually on top of a F.O. line. My records show that this F.O. line belongs to the
City Traffic Dept. Please verify with them that the water main location is acceptable. Also, there
is a high voltage power line running N-S along College Ave. The water main must be a
minimum of 10 feet from the power line.
Department: Park Planning
Contact: Craig Foreman, 970.221-6618, cforeman@fcgov.com
Topic: General
6. In phase 2 a tree could be added in the lawn area just to the NW of the new building
located at the center of the project.
7. Add tree protection notes found in 3.2.1 (G)
8. Add these landscape notes:
• The soil in all landscape areas, including parkways and medians, shall be thoroughly
loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly
incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling,
discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment
per one thousand (1,000) square feet of landscape area.
• A permit must be obtained from the City forester before any trees or shrubs as noted on
this plan are planted, pruned or removed on the public right-of-way. This includes zones
between the sidewalk and curb, medians and other city property. This permit shall approve the
location and species to be planted. Failure to obtain this permit may result in replacing or
relocating trees and a hold on certificate of occupancy.
• The developer shall contact the City Forester to inspect all street tree plantings at the
completion of each phase of the development. All trees need to have been installed as shown
on the landscape plan. Approval of street tree planting is required before final approval of
each phase. Failure to obtain approval by the City Forester for street trees in a phase shall
result in a hold on certificate of occupancy for future phases of the development.
9. The existing tree on the north edge of the property is a multi -stem Siberian Elm. This
species is exempt from the tree retention requirements in 3.2.1. (F) The applicant has retained
the tree in the design at their discretion. The tree has several years of maturity. The City
Forester recommends that the applicant obtain additional information on the tree by having a
private certified arborist evaluate the elm. This individual could provide information on the trees
condition as it relates to suitability for retention, and identify needs for pruning, protection or
other treatments that could improve its structure, function and survivability.
Comment Number: 2 Comment Originated: 04/04/2013
04/04/2013: : Change the Spring Snow Crabs used as street trees to Chanticleer Pear to
match the design theme in this section of the North College Corridor.
The Forestry Divisions observations are that Princess Kay Plum does not typically survive for a
very long period of time. Using a flowering crabapple such as Radiant or another cultivar in its
place would add much better durability as a landscape tree.
Department: Historical Preservation
Contact: Josh Weinberg, 970-221.6206, iweinbergOfcgov.com
Topic: General
Comment Number: Comment Originated: 02/06/2012
Building not yet 50 years old, so there is no historic preservation review.
selecting plant materials within the buffer zone, but neither the Austrian Pine nor the Colorado
Blue Spruce are listed in that document. However, I am fine with these species being utilized,
but additional deciduous trees need also be provided, e.g., cottonwoods, plum, and
chokecherry. The four -wing saltbrush is a good addition, but other shrubs should also be
provided for increased diversity, e.g., rabbitbrush, serviceberry, and sand cherry, as
examples. Additional red -osier dogwood would also work.
01/27/2012: Within the 50' buffer zone, according to Article 3.4.1(E)(1)(g), the City has the ability
to determine if the existing landscaping within the buffer zone is incompatible with the purposes
of the buffer zone. The landscaping in the buffer zone, as currently proposed, in insufficient to
meet the standards of 3.4.1. For instance, the trees proposed within the buffer area (only three)
are lacking both in quantity (we want more trees and shrubs throughout the entire site) and
quality (the proposed trees are not native, please see the City's Native Plants Guide available
at http://www.fcgov.com/naturalareas/native-plants.php for a more appropriate plant palette).
Staff would be happy to meet with you to discuss these issues in more detail.
Topic: Lighting Plan
Comment Number: 1 Comment Originated: 01/27/2012
04/01/2013: 1 will need the revised lighting plan before this project can go to hearing.
01/27/2012: With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)
(6) requires that "natural areas and natural features shall be protected from light spillage from
off -site sources." Thus, lighting from the parking areas or other site amenities shall not spill over
to the buffer areas. The lighting plan must not allow for any foot candle spilllage into the buffer
zone, in addition to addressing zoning's comments below.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/07/2012
02/07/2012: Legacy Auto Forestry Comments
2-7-12
1. Additional trees may be required between parking areas and the street. Review Parking lot
Perimeter Landscaping standards 3.2.1 (E) (4) (a) (b) and how they may be applied to this
project with the Project Planner.
2. Ohio buckeye is not well adapted to areas that are in parking lot islands or low water use
areas. It is prone to leaf scorch in hot dry sites. Bur oak or Catalpa are good drought tolerant
trees for these situations.
3. Douglas fir does not do as well as Austrian Pine or Blue Spruce on most Fort Collins sites.
The latter two are more reliable over time as landscape trees.
4. Conifer trees need to be specified as 6 foot height B&B. Shrubs need to be specified as 5
gallon.
5. Check trees species numbers for Minimum Species Diversity 3.2.1 (3)
Comment Number: 11 Comment Originated: 02/08/2012
04/02/2013: While it's realized that the metal sidewalk culvert is not being built with this specific
development, to the extent that the construction drawings have the detail, the detail should be
modified to the specification we're currently using.
02/08/2012: The metal sidewalk culvert detail if intended to be built with a phase in the
development has since been updated and should be modified as attached.
Topic: General
Comment Number: 6
Comment Originated: 02/08/2012
04/02/2013: I've had further discussion with Engineering, Traffic, and PFA on the emergency
access design for the project. PFA indicated that need for there may no longer be a need for
the emergency access onto College Avenue. If this is the case, the drive approach should be
removed and replaced with vertical curb and gutter closing off the driveway. Should the
emergency access remain, the drive approach should ideally be converted to rollover curb in
order to reduce the appearance of the access being used by the general public. The bollards
should be offset 2 feet from the property line onto private property to reduce the likelihood of
bicyclists and pedestrians conflicting with the bollards while utilizing the sidewalk.
02/0812012: The use of bollards to block the emergency access should be verified for
acceptability by PFA. If acceptable to PFA, the placement of the bollards should be outside of
public right-of-way, behind the sidewalk on private property.
Comment Number: 12
04/02/2013: Carried over for reference.
Comment Originated: 02/08/2012
02/08/2012: Matt Baker in Engineering Street Oversizing has provided the information that the
repay due for College Avenue improvements is currently $190,935.83. This amount is based on
today's dollars and would be adjusted with inflation at the time of repayment which would be
prior to issuance of a building permit.
Comment Number: 13 Comment Originated: 04/02/2013
04/02/2013: Project from my perspective is ready for a public hearing.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex ct fcgov.com
Topic: Construction Drawings
Comment Number: 3
Comment Originated: 01/27/2012
04/01/2013: The landscape plan notes says "15' buffer" instead of 50'. The buffer zone needs
to be labeled on the utility plans as well, and the Limits of Development includes the planting
area - please correct.
01/27/2012: The following notes/graphics will need to be added to the utility plan:
1. Please indicate the "limits of development" line, as per Section 3.4.1(N)(1) of the Land Use
Code.
2. Please add the following note to the utility, site and landscape plans "See Section 3.4.1 of
the Land Use Code for allowable uses within the buffer zone"
3. Please add an Environmental Planner signature to the signature blocks on the utility plans.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 01/27/2012
04/01/2013: The applicants have indicated that they used the Fort Collins Native Plant Guide for
the Decorative Paved Display Spaces along North College Avenue to satisfy Sections 3.2.1(E)
(4)(a) & (b), under Parking Lot Perimeter Landscaping, of the Land Use Code.
Comment Number: 10 Comment Originated: 02/07/2012
04/01/2013: Please provide the corresponding calculations of parking area and interior
landscaping square footage.
02/07/2012: Please provide a graphic showing how Section 3.2.1(E)(5) Parking Lot Interior
Landscaping in the Land Use Code is being satisfied.
Comment Number: 11 Comment Originated: 02/07/2012
02/07/2012: In accordance with Section 3.2.1(1)(4) Installation of the Land Use Code, please
add a note to the Planting Notes on the Landscape Plan (Sheet PDP-C3.2) regarding timing for
installation of landscaping per phase of development. Please see red -lined Landscape Plan,
Sheet PDP-C3.2.
Topic: Lighting Plan
Comment Number: 12
Comment Originated: 02/07/2012
02/07/2012: On the Lighting Photometric Plans, please bring the lineweights and spot values
up in intensity so as to make them legible.
Topic: Site Plan
Comment Number: 2
Comment Originated: 02/06/2012
02/06/2012: The Planning Objectives indicate 36 vehicle display spaces. Sheets PDP-C1.1A
and PDP-C1.1 B of the plan set show 33 & 34 spaces, respectively. Please identify the other 2
or 3 spaces.
Comment Number: 3
Comment Originated: 02/06/2012
02/06/2012: There is so much line work on the 2 Site Plans and it makes it very difficult to read
them. The utilities, curve radii, existing landscaping & notes, and possibly contours may be
eliminated from these plans.
Comment Number: 4
Comment Originated: 02/06/2012
02/06/2012: There is a lot of "line over" information on the Site Plans that must be eliminated.
This makes certain areas of the plan illegible.
Comment Number: 5 Comment Originated: 02/06/2012
02106/2012: Is the pond in the southwest corner of the site really a "retention" pond, not a
detention pond?
Comment Number: 6
Comment Originated: 02/06/2012
02/06/2012. There are 2 described lines (metes & bounds) on the Site & Landscape Plans that
are not shown on the Subdivision Plat. What are they for? Please see red -lined Site Plans.
Apparently they are not needed on the plans and should be removed to help clarify the plans.
Department: Engineering Development Review
Contact: Marc Virata, 970.221-6567, mvirataiaftgov.com
Topic: Construction Drawings
Comment Number: 5
Comment Originated: 02/08/2012
04/02/2013: Add 40-97 after "Benchmark" to the second project benchmark.
02/0812012. A second project benchmark is needed to be referenced in the construction plan
set.
Topic: General
Comment Number: 1
Comment Originated: 02/06/2012
02/06/2012: Please better define "urban tractors" in the Description of Rationale in the Planning
Objectives.
Department: Current Planning
Contact: Steve Olt, 970-221-6341, solt(&fcgov.com
Topic: General
Comment Number: 13
Comment Originated: 02/07/2012
04/01/2013: A modification of this standard is required.
02/07/2012: As set forth in Section 4.22(B)(2)(d)l & 5 of the CS, Service Commercial District,
warehouses and wholesale distribution facilities must be located at least 200' from North
College Avenue. Just in case the property owner(s) were to want to include these uses on the
development plan please take note that none of the buildings are to be at least 200' from the
street.
Comment Number: 14 Comment Originated: 02/09/2012
02/09/2012: Please see red -lined Site & Landscape Plans and Subdivision Plat for Current
Planning comments.
Comment Number: 15 Comment Originated: 02/09/2012
02/09/2012: Please take "PDP" out of the sheet title on all plans (see red -lined plans).
Comment Number: 16 Comment Originated: 02/09/2012
02/09/2012: At least one more round of development review is necessary before this proposal
can be scheduled for an Administrative Public Hearing. Please see the Revision Routing
Sheet prepared by staff for the number of copies of each document to submit for a second
round of review. Contact the Development Review Center, at 970-416-2740, to schedule an
appointment for your re -submittal, when ready.
Comment Number: 17 Comment Originated: 02/09/2012
02/09/2012: The development plans label the ditch along the north side of the property as the
Weld & Larimer Canal. Shouldn't the name be Larimer & Weld Canal?
Comment Number: 18 Comment Originated: 02/09/2012
02/09/2012: Please return all red -lined plans and documents wit your re -submittal.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 02/07/2012
02/07/2012: The Landscape Plans satisfy Section 3.2.1(D)(3) Minimum Species Diversity of the
Land Use Code.
Comment Number: 8
Comment Originated: 02/07/2012
02/07/2012: One additional ornamental tree should be placed in the parkway just north of the
south driveway entrance to the site (see red -lined Landscape Plan Sheet PDP-C3.1A). This will
help satisfy Section 3.2. 1 (D)(2)(a) of the Land Use Code.
Comment Number: 9
Comment Originated: 02/07/2012
02/07/2012: Trees and shrubs are needed in the 15'-0" Landscape Buffers on the east sides of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224.6134 - fax
fcgov. com/developmentreview
April 09, 2013
Don Shields
WG Architects
P.O. Box 270788
Fort Collins, CO 80527
RE: Legacy Auto, PDP120001, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Seth Lorson, 970-224-6189, slorson a()fcgov.com
Topic: Building Elevations
Comment Number: 21 Comment Originated: 04/01/2013
04/01/2013: Please provide building elevations for all sides of all building for all phases.
Topic: General
Comment Number: 19
Comment Originated: 04/01/2013
04/01/2013: This plan shows phasing. Phasing can only be established with an Overall
Development Plan (ODP) which will require PDPs for each phase. The phasing shown in this
current proposal will all have to be completed in the 3 years that the PDP is active. Please see
LUC 2.2.11(B) & (C).
Topic: Site Plan
Comment Number: 20
Comment Originated: 04/01/2013
04/01/2013: The proposed building are required to be built to the build -to line along adjoining
streets per 3.5.3(B)(2). Or, alternative and exceptions may be considered per 3.5.3(B)(2)(d). Or,
a modification of standard is needed.
Contact: Steve Olt, 970-221.6341, solt(&fcgov.com