2. Buffer will need to be examined closer by the environmental planner. 50' buffer is required
from top of bank, from the plan I cannot tell where that is, formal plan will need to show this.
3. Landscaping shall meet all standards of Article 3.
4. Elevations shall comply with Section 3.5.3, this includes haveing a recognizable base and
top. Please submit a color rendering with your formal submittal, with colors labeled.
5. Modifications may be needed for Orientation to Connecting Walkway and Orientation to
build -to lines for street front buildings.
6. Please clearly illustrate different phasing on all plans (site, landscaping).
7. The proposed development project is subject to a Type 1 review and public hearing, the
decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for
this development request is not required to hold a neighborhood meeting for a Type 1
hearing, but if you would like to have one to notify your neighbors of the proposal, please let
me know and I will can help you in setting a date, time and location for a meeting.
Neighborhood Meetings are a great way to get public feedback and avoid potential hick -up
that may occur later in the review process.
8. Please see the Development Review Guide at www.fcgov.com/drg. This online guide
features a color coded flowchart with comprehensive, easy to read information on each
step in the process. This guide includes links to just about every resource you need during
development review.
9. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
hftp://www.colocode.com/ftcollins/landuse/begin.htm.
10. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for
a Modification of Standard.
11. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/currentplanning/submiftals.php.
12. The request will be subject to the Development Review Fee Schedule that is available in the
Community Development and Neighborhood Services office. The fees are due at the time
of submittal of the required documents for the appropriate development review process by
City staff and affected outside reviewing agencies. Also, the required Transportation
Development Review Fee must be paid at time of submittal.
13. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
Page 8 of 8
City of
ort Collins
determine if a traffic study is needed for this project.
10. Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS).
11. A 15' utility easement behind the right-of-way established with the North College
improvement project will be required.
12. This site is adjacent to CDOT roadway and all access to the site is governed by an access
control plan. The access control plan will need to be followed and implemented with any
project. Plans will be routed to CDOT for review and approval and the applicant may need
to obtain access permits from CDOT.
13. Construction improvement plans will be needed for this project.
14. A development agreement will be done with this project.
15. A Development Construction Permit (DCP) will need to be obtained prior to starting any
work on the site.
16. Matt Wempe is in transportation planning and his contact information is 416-2040,
mwempe@fcgov.com regarding the private drive issue.
17. With the discussion at conceptual on public street vs. private drive and sub -phasing, we'll
need additional discussion on how full or partial portions are built and what may need to be
tied to the first phase in order to prevent a disjointed development plan.
ELECTRIC ENGINEERING
Contact: Rob Irish, 970-224-6167, ririshOJcnov.com
1. The existing building is fed from a 1-phase 50KVA transformer on the West side of the
building. This transformer is fed from a switch cabinet along College Ave. at the Northeast
'corner of the existing lot. The 4,400 s.f. addition to the existing building looks like it will
impact this primary electric line.
2. Any relocation or modification to the existing electric facilities will be at the owners
expense. This will need to be coordinated with Light & Power Engineering.
3. Owner will need to submit a C-1 form and One -line diagram with their electrical needs to
Light & Power Engineering. A transfomer location within 10' of a paved surface will need to
be coordinated. Owner may want to consider sizing the transformer for all the additions
and new buildings on the property. Contact Light & Power Engineering @ 221-6700.
4. Owner will be responsible for Electric Capacity Fees, Building Site charges and system
modification charges where applicable.
CURRENT PLANNING
Contact: Emma McArdle, 970-221-6206, emcardleO-fcgov.com
1. Please submit the memo from our meeting in May regarding the use of this site with your
formal submittal.
Page 7 of 8
R
city of
rt Collins
brick are not acceptable). If the numerals are mounted on a side of the building other than
the side off of which it is addressed, the street name is required to be posted along with the
numerals.
PLEASE NOTE: In order for its address to be visible from College Avenue, the wecond
building may need to have a business sign/address located at College Avenue.
006 International Fire Code 505.1
ENGINEERING DEVELOPMENT REVIEW
Contact: Marc Virata, 970-221-6567, mvirata(a�fcaov.com
1. The Access Control Plan for North College specifies that two access points would serve
the site in the long term, a commercial local road between the property and the Lamplighter
as well as an additional access point to the north along the property. The proposed site
plan proposes two access points, however a private drive instead of a commercial local
road is shown. As was previously indicated on the 3/15/2010 conceptual review the City is
potentially willing to change the commercial local road designation specified in the Access
Control Plan to a private drive. The applicant and the City should have further discussion
on specifics should this proposal proceed. Further internal City discussion would be
needed and amending the Access Control Plan (and receiving buy -in from CDOT) would
be needed.
2. The following two comments would likely not be applicable if the result of an agreement to
move forward with amending the Access Control Plan to remove the commercial local
street and instead provide a private drive takes place:
3. 36' half right=of-way for the future commercial local street would need to be dedicated at
this time.
4. The project is obligated for the half street design and construction of the commercial local
street along the southern boundary. Whether it would be beneficial to have this half
constructed at this time or financially obligated in a development agreement would likely be
at the applicant's preference.
S. Repays for the local street portion of College Avenue frontage improvements and
right-of-way would be required of the property prior to the issuance of a building permit in
conjunction with the development proposal.
6. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of
building permit. Please contact Matt Baker at 224-6108 if you have any questions.
7. Transportation Development Review Fee (TDRF) is due at the time of submittal. For
additional information on these fees, please see
hftp://www.fcgov.com/engineering/dev-review.php
8. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer6s
expense prior to the acceptance of completed improvements and/or prior to the issuance
of the first Certificate of Occupancy.
9. Please contact Joe Olson and Transportation Planning to schedule a scoping meeting and
Page 6 of 8
Cfty of
F'rt Collins
PLEASE NOTE: An EAE will be required for the site. Please contact me to discuss
location that must be dedicated.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
3. WATER SUPPLY
Fire hydrants, where required, must be the type approved by the water district having
jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum
requirements based on type of occupancy. Minimum flow and spacing requirements
include:
- Commercial and multi -family dwellings 1,500 gpm at 20 psi residual pressure, spaced
not further than 300 feet to the building, on 600-foot centers thereafter
- Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced
not further than 400 feet to the building, on 800-foot centers thereafter
- Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced
not further than 400 feet to the building, on 800-foot centers thereafter.
A hydrant located across an arterial cannot be considered for this reqirement unless the
building is fire sprinklered.
These requirements may be modified if buildings are equipped with automatic fire sprinkler
systems.
PLEASE NOTE: The closest hydrant is Icoated across College Avenue (an arterial) near
1806 N. College Ave. The closest hydrant on the west side of College is the northwest
corner of Willox Lane and College.
2006 International Fire Code 508.1 and Appendix B
4. FIRE SPRINKLER REQUIREMENTS
If the building has fire sprinklers, the following requirements must be met:
FIRE LINE
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line
unless hydraulic calculations can support a smaller fire line.
KEY BOXES
Poudre Fire Authority requires a key box ("Knox Box") to be mounted in approved
location(s) on every new building equipped with a required fire -sprinkler system or
fire -alarm system. Knox Boxes are required to be installed approximately 60 inches above
grade and no higher than 72 inches above grade.
FIRE DEPARTMENT CONNECTION
Fire department connections shall be installed remote from the buildings, and located on
the street or fire lane side of buildings, fully visible and recognizable from the street or
nearest point of fire department vehicle access or as otherwise approved by the fire code
official. 2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy, 2006
International Fire Code 506.1; and NFPA 13 (2007) 23.1.3
5. TURNING RADII
The required turning radii of a fire apparatus access road shall be a minimum of 25 feet
inside and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3
6. ADDRESS NUMERALS
Address numerals shall be visible from the street fronting the property, and posted with a
minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown
Page 5 of 8
ort Collins
Manual, Volume 3 - Best Management Practices (BMPs).
7. The Windsor Reservoir and Canal Company owns and operates the Eaton Ditch
(Larimer-Weld Canal) along the north property line. The ditch company will need to
approve the plans if there is any grading near the ditch. The contact is Bill Johnston,
Superintendent; 222-0090 (Cell), 454-3377.
8. The design of this site must conform to the drainage basin design of the Dry Creek Master
Drainage Plan as well the City's Design Criteria and Construction standards.
9. Stormwater development fees are $6,313/acre ($0.1449/sq.ft.) for new impervious area
over 350 sq. ft. In addition, there is a $1,045/acre review fee. No fee is charged for
existing impervious area. These fees are to be paid at the time each building permit is
issued. Information on fees can be found on the City's web site at
http://www.fcgov.com/utilities/builders-fees.php or by contacting Jean Pakech at 221- 6375.
PARK PLANNING
Contact: Craig Foreman, 970-221-6618, cforeman(afcgov.com
1. No comments
FIRE AUTHORITY
Contact: Carie Dann, 970-219-5337, CDANNO-poudre-fire.orq
1. BUILDING AREA
Proposed buildings that exceed 5,000 square feet for Type V construction shall be fire
contained or fire sprinklered. 2006 International Fire Code New Table 903.1 and Section
702
2. REQUIRED ACCESS
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or within the PFA's jurisdiction when any
portion of the facility or any portion of an exterior wall of the first story of the building is
located more than 150 feet from fire apparatus access as measured by an approved route
around the exterior of the building or facility. This fire lane shall be visible by painting and
signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for
approval prior to installation. In addition to the design criteria already contained in relevant
standards and policies, any new fire lane must meet the following general requirements:
- Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary
fire lanes or at construction sites.
- Have appropriate maintenance agreements that are legally binding and enforceable.
- Be designated on the plat as an Emergency Access Easement.
- Maintain the required minimum width of 20 feet throughout the length of the fire lane (30
feet on at least one long side of the building when the structure is three or more stories in
height).
If the building is equipped throughout with an approved automatic fire -sprinkler system, the
fire code official is authorized to increase the dimension of 150 feet.
Page 4 of 8
WATER -WASTEWATER ENGINEERING
Contact: Roger Buffington, 970-221-6854, rbuffington(cMcgov.com
1. The water and sewer mains in the vicinity of this site include a 4-inch water main in College
which extends from Willox to a point in front of the Lamplighter Motel, an 8-inch water main
which was extended across College from the former Grape Street, a 6-inch water main in
Willox Court and a 6-inch sewer at the southwest corner of the site.
2. This project will be responsible for extending the water main at the northeast comer of the
site with the objective of connecting to one of the existing mains in noted above. A meeting
with the developer's civil engineer, Poudre Fire Authority and Water Utilities staff is needed
to review options for routing this main to provide service to all buildings in this development
and provide adequate fire protection.
3. The water service to the existing building on the site is a %-inch service connecting to the
4-inch water main in front of the Lamplighter Motel on the west side of college.
4. Development fees and water rights will be due at building permit.
STORMWATER ENGINEERING
Contact: Glen Schlueter, 970-224-6065, gschlueter(dfcaov.com
1. Drainage requirements and fees are based on new impervious area; therefore, it is
important to document the existing impervious area. To determine these requirements, an
exhibit showing the existing and proposed impervious areas is needed.
2. A drainage and erosion control report and construction plans are required and must be .
prepared by a Professional Engineer registered in Colorado.
3. Since the site is being platted, the existing storm sewer lines need to have easements
shown on the new plat in addition to any new easements needed for detention for the
additions and the parking lot.
4. In the Dry Creek basin, the two year historic release rate is 0.2 cfs/acre. The drainage
outfall for the site may require obtaining easements from this property to Willox Court since
that appears to be the present outfall for the drainage. With detention, some of the site
could possibly drain to the existing storm lines from the North College Mobile Home Park if
the pipe under College Avenue is replaced. The existing pipe under College presently
flows from the east to the west. A new pipe would be needed to reverse the flow. This
would require an analysis of the outfall system through the new North College Market Place
to see if there is capacity for this site to flow that direction. The North College Market Place
design included capacity for an eight inch pipe from the mobile home park.
5. The detention pond is now shown at the low end of the site. The design engineer may have
sized the pond but no outlet pipe is shown. The drainage outfall though the buildings to the
west is the curb and gutter of Willox Ct. The design engineer will need to verify that the
outfall depth is sufficient to drain the detention and water quality pond.
6. Water quality treatment is required as described in the Urban Storm Drainage Criteria
Page 3 of 8
CONCEPTUAL REVIEW STAFF COMMENTS
Meeting Date: November 22, 2010
Item: Legacy Auto - 1845 N College Ave
Applicant: Don Shields
Fort Collins, CO
dons@wgarchitects.com
Land Use Data:
of
� rt Collins
This is a request to replat 1845 N College and the property to the north into a single lot. The part of
existing building and addition will be used for the sales offices for tractors,ATVs, trailers (27 feet
maximum length), small boats, conversion vans, cars, and light trucks. Also, part of this building will
be used for retail sales and part will be used for minor vehicle repair. The second building pad would
be a 5,000 s.f single -story building located on the western part of the site. The proposed use for this
building will be office/warehouse.
Comments:
ZONING
Contact: Peter Barnes, 970-416-2355, pbarnes(a)fcgov.com
1. The property is zoned CS. The former "boat sales" permitted use is no longer•allowed ;
pursuant to a code change. The sale of trailers up to 27' in lenght is questionable (research
will have to be done regarding previous agreements). All of the other uses are allowed
subject to'a Type 1 review process. The vehicle sales of cars and light trucks is allowed
and is currently approved for the south half of the lot, along with the existing "urban tractor'
sales. Shifting it to the north would be ok as long as the lineal frontage along College
devoted to this use does not increase over the existing lineal frontage on the south half.
2. The warehouse/mini-storage building must be at least 200 feet from N. College Avenue.
3. ATV and water sport inventory, etc. will need to be in a screened area. The site plan shows
a screened product storage, and I assume that's where these items would be.
4. The parking and vehicular use areas must be hard surfaced. Recycled asphalt or gravel
isn't an acceptable surface, except in the screened product storage.
5. It looks like most, if not all, of the car and light truck sales area is shown to be in the
landscape area. The landscape area is for landscaping, and vehicles can't be parked
there.
Page 2 of 8
Fort of
November 22, 2010
Don Shields
Fort Collins, CO
RE: Legacy Auto - 1845 N College Ave
Dear Don,
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224,6134 - fax
fcgov. com/currentplanning
Attached, please see a copy of Staffs comments concerning the request referred to as the
Legacy Auto -1845 N College Ave, which was presented before the Conceptual Review
Team on November 22, 2010.
The comments offered informally by staff during the Conceptual Review will assist you in
preparing the detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to contact me at 970-221-6206.