Loading...
HomeMy WebLinkAboutTIMBERLINE STORAGE - MAJOR AMENDMENT - MJA160003 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS (9)Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 12 In evaluating the request for the Timberline Storage, MJA160003, Staff makes the following findings of fact: A. The Project Development Plan complies with process located in Division 2.2 — Common Development Review Procedures for Development Applications of Article 2 — Administration. B. The Project Development Plan complies with relevant standards located in Article 3 — General Development Standards. C. The Project Development Plan complies with relevant standards located in Division 4.27 Employment (E) of Article 4 — Districts. RECOMMENDATION: Staff recommends Planning and Zoning approve the Timberline Storage, MJA160003, based on the findings of fact on page 12 of the staff report. ATTACHMENTS: 1. Zoning & Site Vicinity Map 2. Applicant's Statement of Planning Objectives 3. Timberline Storage Planning Document Set (Site Plan, Landscape Plan, Elevations & Photometric Plan) 4. Applicant's Analysis of Primary and Secondary Uses in Employment Zone Near Prospect Rd. and Timberline Rd. Staff Report — Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 11 Secondary uses shall not occupy more than 25% of the total gross area of the development plan. Timberline Storage will perform similarly to surrounding primary uses in terms of form and function. Enclosed mini - storage, however, is a secondary use and it occupies more than 25% of the gross area of the development plan. Staff has interpreted the 25% maximum secondary use regulation to apply to the Employment district as a whole rather than just at the level of an individual development plan. In this case, the applicant provided an analysis of the land uses in the Employment zone around the Prospect Rd and Timberline Rd area. More than 90% of the uses in this Employment zone area are primary uses. When taking the Timberline Storage development into account, the Employment zone in this area will still contain 88% primary uses. Since this proposed development does not push the amount of secondary uses in the Employment zone around Prospect Rd and Timberline Rd over the 25% allowed by code, this development complies with this code standard. C. Section 4.27(D)(4) — Dimensional Standards The maximum height of buildings in the Employment zone district shall be 4 stories. None of the proposed buildings will exceed 2 stories. D. Section 4.27(E)(1)(a) — Site Design When there are multiple parcels with different owners, the applicant shall work with adjacent property owners to establish a pattern of streets, outdoor spaces, building styles, and land uses. Timberline Storage shows a shared access point that will serve the existing car wash, proposed future office building, and proposed storage facility. Each of the buildings is designed in a way to complement the existing buildings nearby. E. Section 4.27(E)(3) — Enclosed Mini -Storage Facilities Where enclosed mini -storage facilities face a public street, the entire linear frontage along such street shall include only buildings designed for human occupancy, landscaping, accessory parking and/or drives. The entire frontage of the storage component of this proposed development contains landscaping to screen the storage facilities from the street. 4. Findings of Fact/Conclusion: Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 10 cultured stone wainscot and pilasters to provide relief to the long horizontal masses of the building. This combination of setbacks, wainscot, and pilasters provides ample variation in massing. T. Section 3.5.3(E) — Character and Image Each building shall contribute to the uniqueness of a zone district and the community at large with predominant materials, elements, features, color range, and activity areas tailored specifically to the site and its context. Walls should be articulated, facades should have entry features clearly defined and should also have a clear base and top. As discussed in part O of this staff report, the form of the building and proposed materials fit into the established architectural context of the immediate vicinity. Each wall facing the street is clearly articulated with changes in plane, variation in materials, and by having a clear base and top defined by differing materials. The entries for each building are clearly distinguished with awnings. The base and top of each building is established through a change of materials. U. Section 3.6.6 — Emergency Access All developments must provide adequate access for emergency vehicles by complying with Chapter 9 of the City Code. The proposed emergency access easement shown on the site plan satisfies this code requirement. 3. Compliance with Article 4 of the Land Use Code — Employment (E), Division 4.27: The project complies with all applicable Article 4 standards as follows: A. Section 4.27(B)(3) — Permitted Uses The proposed uses, enclosed mini -storage facility, is an allowed use in the Employment zone district subject to review by the Planning & Zoning Board. B. Section 4.27(D)(2) — Secondary Uses Secondary uses shall be integrated both in form and function into a larger employments district development plan that emphasizes primary uses. ■ L Staff Report — Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 9 away from the back of the sidewalk, this design provides enhanced visual relief to masses that would otherwise be 95'-200' in length. These setbacks, furthermore, allow for more room for vegetative screening. Enhanced landscaping prominently featured along Midpoint Dr. and Specht Point Rd. will soften the image of the buildings and provide a better street presence than if the buildings strictly adhered to the build -to line. Meeting the build -to line standard for the office portion of the project is complicated by the access for the site. The proposed development will use the existing access point off Midpoint Dr. that currently serves the carwash nextdoor. Given this existing site constraint, it would be impossible for the office portion of this project to meet the build -to line standard without changing the access for Timberline Storage and the existing carwash. A change to the access point would require approval from the City of Fort Collins Engineering department and would likely require a variance to access point spacing requirements since the existing driveway aligns with the access road for Centerpoint Plaza and Allied Building Products to the south. The future office building also constitutes a small portion of the total frontage of the project so its impact on the development for this code standard in minimal. In summary, portions of the Timberline Storage development meet the letter of the build -to line standard. For the portions of the development that do not, the end result is a development that meets the intent of the code. The proposed site plan will provide buildings that are broken into smaller modules, enhanced landscaping to provide an improved presence on the street, and the consolidation of access points along Midpoint Dr. S. Section 3.5.3(D) — Variation in Massing Single, large, dominant building mass shall be avoided in new buildings. Changes in mass should relate to entrances, integral structure, and/or the organization of interior spaces and should not be solely for cosmetic effect. Each street facing portion of the buildings proposed have the mass broken up in multiple ways. Buildings A, B, C, D, K, J, and I all feature setbacks in the building ranging from 10' to 25' that relate to storage units with different proportions. All of the street fronting buildings also feature a Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 8 P. Section 3.5.1(1) - Outdoor Storage Areas/Mechanical Equipment The proposed plan is consistent with the requirements of the Land Use Code in regards to the location of outdoor storage, screening of storage areas, and screening of rooftop mechanical equipment from public view. O. Section 3.5.3(C)(1) — Orientation to a Connecting Walkway One main entrance of any commercial building shall face and open directly onto a connecting walkway with pedestrian frontage. Both the office portion of the storage facility and the future building have main entrances that face and directly connect to a walkway that connects to the sidewalk network on Midpoint Dr.. R. Section 3.5.3(C)(2) — Orientation to Build -to Lines for Streetfront Buildings Along streets smaller than a full arterial, buildings should be located no more than 15 feet from the right-of-way. At least 30% of the total length of the building along the street shall extend to the build -to line area. The intent of this code section is to develop an urban form of development where buildings front streets and enhance the experience of the pedestrian. The proposed buildings meet the intent of this code section. Due to the layout of the buildings, the storage units have varying setbacks from the right-of-way. Building K is the closest to the right-of-way with the western point of the building approximately 10' away from the Midpoint Dr. right-of-way. Building 1A is the furthest setback from the Specht Point Rd. right-of-way with the closest portion of the building setback 28'-4". To meet the letter of this code section, the buildings would need to have a curved shape along Midpoint Dr.. Along Specht Point Rd., the buildings would need to be rotated clockwise to be more parallel to the street. This orientation would not necessarily benefit the layout of the site. Section 3.5.3(D) requires the buildings to be broken up into modules to prevent monolithic masses. As such, the proposed buildings are broken into two sections with a large setback to break up the mass of the buildings. These setbacks range in size from 10' for Buildings J + K up to 25' for Building C. While this design choice puts the buildings further Staff Report — Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 7 K. Section 3.2.2(K)(5) - Handicap Parking Parking lots with less than 25 spaces must provide at least 1 handicap parking space. The parking lots proposed for each phase are less than 25 spaces and each provides 1 handicap parking space. L. Section 3.2.3 -Solar Access, Orientation, Shading All developments must be designed to accommodate active and/or passive solar installations and must not deny adjacent properties access to sunshine. The proposed building is designed and located to minimize the casting of shadows on adjacent properties and could accommodate future active and/or passive solar installations. M. Section 3.2.4 - Site Lighting The proposed lighting plan is consistent with the requirements of the Land Use Code in regards to the general standard, lighting levels, and design standards. N. Section 3.2.5 - Trash and Recycling Enclosures Trash and recycling enclosures must be provided in locations abutting refuse collection or storage areas, designed to allow walk-in access without having to open the main service gate, screened from public view, and constructed on a concrete pad. The proposed trash and recycling enclosure design satisfies the standards. O. Section 3.5.1(E) - Building Materials All proposed buildings shall use similar materials to existing buildings in the neighborhood or use similar architectural characteristics if dissimilar materials are proposed. The proposed building uses similar materials and architectural details to the existing buildings in the area. The proposed materials include cultured stone, aluminum, glass, and stucco. While cultured stone is not a prominent material in the area it is of similar or higher quality to the concrete masonry unit, architectural metal, and concrete found on other buildings in the immediate vicinity. The form of the building is also consistent with the unadorned, simple architectural style established in the area. Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 6 G. Section 3.2.2(D)(1) - Access and Parking Lot Requirements; Pedestrian/Vehicle Separation To the maximum extent feasible, pedestrians and vehicles shall be separated through provision of a sidewalk or walkway. Where complete separation of pedestrian and vehicles is not feasible, potential hazards shall be minimized by using landscaping, bollards, special paving, lighting, and other means to clearly delineate pedestrian areas. Timberline Storage separates pedestrians from vehicles by providing a sidewalk separated from the driving and parking area via curb. H. Section 3.2.2(E) - Parking Lot Layout The proposed parking lot layout is consistent with requirements of the Land Use Code in regards to circulation routes, orientation, landscaped islands, and points of conflict. Section 3.2.2(J) - Setbacks The proposed parking lot is setback further than the 10-foot minimum from non -arterial streets and 5-foot minimum along a lot line required per the Land Use Code. J. Section 3.2.2(K)(2) — Nonresidential Parking Requirements The minimum, maximum, and proposed parking are contained in the table below. Timberline Storage is providing parking within the range of required parking and thus meets the requirements of the Land Use Code. Please note that since the future building for Phase 2 does not have a use established so the parking counts assume a minimum aligned with a potential office use and a maximum aligned with a potential restaurant use. Table 1: Timberline Storage Parking Use Min. Parking Max. Parking Parking Provided Self -storage (17 .5 per employee .75 per employee 9 spaces employees) = 9 s aces = 13 spaces Office/Restaurant 1/1,000 sq. ft. = 10/1,000 sq. ft. = 22 spaces 4,731 sq. ft. 5 spaces 47 spaces Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 5 parking lot. The parking lot on the west side of the office for the storage facility also features evergreen trees to provide further visual relief and year-round greenery. D. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping 6% of the interior space of all parking lots with less than 100 spaces shall consist of landscaping. Each parking area has bulb outs at each end with deciduous shrubs and canopy shade trees, which satisfies this code requirement. E. Section 3.2.2(C)(4)(b) - Bicycle Parking Space Requirements The minimum number of bicycle parking spaces required for a self -storage facility is 4 since the most similar use is Industrial. Timberline Storage will provide one bicycle rack that contains 4 bicycle parking spaces. For the office/restaurant portion of the development, 4 bicycle parking spaces are required minimum for an office use with at least 1 of those spaces provided in an enclosed location. The site plan shows 3 bicycle parking spaces provided by a fixed rack and 1 bicycle parking space inside the building, which meets the requirement for having at least 1 bicycle parking space in an enclosed location. F. Section 3.2.2(C)(5) - Walkways Walkways must be provided to link sidewalks with building entries through parking lots. These walkways must also provide direct connections to off - site pedestrian and bicycle destinations. The Timberline Storage site provides a connecting walkway for both phases of the project. For the storage facility, the connecting walkway runs on the western portion of the site, connecting the front door directly to the sidewalk on Midpoint Dr. without crossing a vehicle use area. For the future building, the sidewalk connects to the front door on the east side of the building. The site plan shows a crosswalk where this section of the sidewalk crosses the drive aisle for the southern parking area. This sidewalk then continues south to the sidewalk alond Midpoint Dr., satisfying this code section. a ■ Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 4 2. Compliance with Article 3 of the Land Use Code — General Development Standards: The project complies with all applicable General Development Standards as follows: A. Section 3.2.1(D) — Tree Planting Standards All developments shall establish groves and belts of trees along all city streets, in and around parking lots, and in all landscape areas that are located within 50' of any building or structure in order to establish at least a partial urban tree canopy. The proposed landscape plan shows street trees planted at appropriate intervals, canopy shade trees planted in bulbouts adjacent to parking lots, and ornamental trees planted close to buildings to provide screening and a partial urban tree canopy, which meets this code standard. B. Section 3.2.1(E)(1) — Buffering Between Incompatible Uses and Activities Where uses or designs of buildings do not adequately mitigate conflicts between incompatible uses, enhanced landscaping and buffering should be used. An office complex sits on the east side of Specht Point Rd. opposite Timberline Storage, which could be considered an imcompatible use. To mitigate the impact of the presence of long storage units along Specht Point Rd., the landscape plan shows groves of evergreen trees, shrubs, wide spread ornamental grasses, and ornamental trees. This design will provide enhanced screening of the storage units and provide ample mitigation between conflicting uses. C. Section 3.2.1(E)(4) — Parking Lot Perimeter Landscaping The perimeter of parking lots are required to have trees planted at a ratio of 1 per 25 lineal feet along a public street and 1 per 40 lineal feet along a side lot line and parking setback area. Parking lots must also have screening to block at least 75% of light from vehicle headlights. The proposed landscape plan shows shrub beds extending the full length of each parking area along public streets that provide screening from the shine of vehicle headlights. Each parking area is flanked by canopy shade trees that provide ample tree cover for the perimeter of each ■ 1. Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 3 Figure 1: Timberline Storage Zoning & Site Vicinity D`. n E , - E LsedRd-- S' -y D \�� RC POL � . Campn FJmninfu:. IN �e, _ Oincxbvtl Dr v gYyY a � _ Bear M°unbin- ? LMN c B i j L yOe Jay Por• MancY 1 inch = 667 feet Timberline Storage Vicinity Map Staff Report —Timberline Storage, MJA160003 Planning & Zoning Board Hearing 09-08-2016 Page 2 • The Project Development Plan complies with relevant standards located in Division 4.27 Employment (E) of Article 4 — Districts. COMMENTS: 1. Background The property was annexed into the City of Fort Collins as part of the East Prosepct Street First Annexation on September 6, 1973. Lots 6 and 7 were platted as part of the Spring Creek Center PUD, which was recorded on April 1, 1999. The Spring Creek Center PUD had called for Lots 6 and 7 to each contain a 31,200 square foot, multi - tenant building. Each multi -tenant building could contain retail, office, restaurant, and/or other business service or industrial uses as defined in the Land Development Guidance System per the approved PUD. Since the approval of the Spring Creek Center PUD, lots 6 and 7 have sat vacant while the rest of the PUD has been built out. The surrounding zoning and land uses are as follows: Direction Zone District Existing Land Uses North Employment E Office, gas station, drive-thru restaurant South Employment (E) Office, institutional East Employment (E) Office West I Employment (E) Car wash A zoning and site vicinity map is presented on the following page. F6rt of MEETING DATE STAFF Sept. 8, 2016 Clay Frickev PLANNING & ZONING BOARD PROJECT: Timberline Storage, MJA160003 APPLICANT: Sam Coutts Ripley Design, Inc. 419 Canyon Ave. Suite 200 Fort Collins CO, 80521 OWNERS: Timberline Storage LLC 5232 Southern Cross Ln Fort Collins, CO 80528 PROJECT DESCRIPTION: This is a Major Amendment request for a mixed -use commercial development. The project consists of conditioned and unconditioned storage units, a small office and a future building (use yet to be decided). Vehicular access will be provided by an existing private drive in the Spring Creek Center. This project will replat lots six and seven of the Spring Creek Center PUD and vacate various access and drainage easements that were associated with the original PDP. The site is located in the Employment (E) zone district. RECOMMENDATION: Staff recommends approval of Timberline Storage, MJA160003. EXECUTIVE SUMMARY: Staff finds the proposed Timberline Storage Major Amendment complies with the applicable requirements of the City of Fort Collins Land Use Code (LUC), more specifically: • The Project Development Plan complies with the process located in Division 2.2 — Common Development Review Procedures for Development Applications of Article 2 — Administration. • The Project Development Plan complies with relevant standards of Article 3 — General Development Standards. Planning Services 281 N College Ave - PO Box 580 - Fort Collins, CO 80522-0580 fcgov.com/developmentreview/ 970.221.6750