HomeMy WebLinkAboutCENTERPOINT PLAZA (RE-APPLICATION) - PDP - PDP150014 - CORRESPONDENCE - (5)12/01/2015: This has not been corrected.
10/13/2015: This has not been corrected.
08/06/2015: There is text that needs the size increased. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a).fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/12/2015
08/12/2015: The original approval was for office and retail use. With no
changes, no further traffic analysis is needed.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/11/2015
08/11/2015: Perovskia Atriplicifolia (Russian Sage) has been removed from
the City of Fort Collins Plant List. Please replace with a plant variety from the
current list. If you have questions contact Eric Olson at eolson@fcgov.com or
970-221-6704.
Comment Number: 2
Comment Originated: 08/11/2015
08/11/2015: The irrigation plan is incomplete. Please refer to the provisions
outlined in Section 3.2.1(J) of the Land Use Code. Identify grass type(s) and
show a water budget for site, identify hydrozones as well. Direct questions
concerning irrigation requirements to Eric Olson, at 221-6704 or
eolson@fcgov.com
Comment Number: 3
Comment Originated: 10/16/2015
10/16/2015: The irrigation plan is incomplete. Please refer to the provisions
outlined in Section 3.2.1(J) of the Land Use Code. Landscape Code requires
sprinkler heads with pressure regulating stems and check valves identified on
legend. Smart controller with weather station and turf zones equipped with flow
control valves, also missing from legend. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416.2418, wlamargueQfcgov.com
Topic: General
Comment Number: 3
Comment Originated: 08/12/2015
12/01/2015: Reminder comment for Final Compliance.
10/14/2015: Reminder comment for Final Compliance.
08/12/2015: Please show the proposed wet utilities on the landscape plan and
provide the required separation distances.
Comment Number: 4 Comment Originated: 12/01/2015
12/01/2015: Please provide 10 feet separation between the water and sewer
services.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29
UNADJUSTED + X.XX'.
10/13/2015: The information shown is incorrect. See redlines.
08/06/2015: The City has moved to the NAVD88 vertical datum. Please
provide the following information in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX&
Comment Number: 10
11/30/2015: There are line over text issues. See redlines.
10/13/2015: There are line over text issues. See redlines.
08/06/2015: There are line over text issues. See redlines.
Comment Number: 32
Comment Originated: 08/06/2015
Comment Originated: 12/01/2015
12/01/2015: There is an Access, Emergency Access, Drainage & Utility
Easement on sheet 5, that is shown as proposed. According to the Centerpoint
Plaza First Replat this easement was to be dedicated by separate document.
Please verify whether or not it has been dedicated.
Topic: Easements
Comment Number: 33 Comment Originated: 12/01/2015
12101/2015: The easements that were provided do not appear to match what is
shown on the plans. Please verify that all current easements are shown.
Topic: Lighting Plan
Comment Number: 34
12/01/2015: There are line over text issues. See redlines.
Topic: Site Plan
Comment Number: 23
12/01/2015: There are line over text issues. See redlines.
10/13/2015: There are line over text issues. See redlines.
08/06/2015: There are line over text issues. See redlines.
Comment Originated: 12/01/2015
Comment Originated: 08/06/2015
Comment Number: 24 Comment Originated: 08/06/2015
11/30/2015: Submitted Erosion Control Report, Plan and Escrow have redline
comments that need to be resolved at the time of FDP for this project.
10/13/2015: Submitted materials require did not meet Design Criteria. (a copy
of the guidance document is submitted to ensure the proper requirements are
addressed as the erosion control report did not talk to much more than 5-6 of
the criteria the sequence of activities chart was also confusing and did not give
a clear idea of the progress of the construction activities.) Erosion control
Escrow will need to be recalculated based upon changes to the Plan as well as
the seeding cost estimate was not a realistic cost for reseeding. Generally
reseeding costs over $1000/acre. Redlines on plans need to be addressed and
detail sheet needs to add all of the BMPs that are planned to be used on this
site. If you need clarification concerning this section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
08/04/2015: The site disturbs more than 10,000 sq-ft and in a sensitive area,
therefore Erosion and Sediment Control Materials need to be submitted for
FDP. The erosion control requirements are in the Stormwater Design Criteria
under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion
Control Materials Submitted do not meet requirements. Please submit; Erosion
Control Plan (has redline comments), Erosion Control Report (not submitted),
and an Escrow / Security Calculation (not submitted). If you need clarification
concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamarQue(a)fcaov.com
Topic: General
Comment Number: 7
Comment Originated: 12/01/2015
12/01/2015: The maximum allowed run-on area onto the porous pavers is
exceeded for paver area #2. Please revise to lower the run-on area.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(a)fcgov.com
Topic: Building Elevations
Comment Number: 31 Comment Originated: 12/01/2015
12/01/2015: No plans were provided for review.
Topic: Construction Drawing
Comment Number: 4 Comment Originated: 08/06/2015
11/30/2015: Please provide the following information in the EXACT format
shown below.
PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT
COLLINS DATUM)
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Project specific concerns:
1. Upgraded insulation is required for buildings using electric heat or cooling.
2. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min.
if building located within 1000ft to train tracks for certain occupancies.
3. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
4. Special combustion safety requirements for natural draft gas appliances.
5. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund(cDfc4ov.com
Topic: General
Comment Number: 1
Comment Originated: 08/06/2015
08/06/2015: Light and Power has electric facilities along the south side of
Midpoint Dr that could be utilized to provide both single or three phase power.
Comment Number: 2 Comment Originated: 08/06/2015
08/06/2015: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 3 Comment Originated: 08/06/2015
08/06/2015: Development and capacity charges will apply at owner's expense.
Comment Number: 4
Comment Originated: 08/06/2015
08/06/2015: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 5
Comment Originated: 10/14/2015
10/14/2015: The transformer needs to be located within 10ft of an all weather,
drivable surface. Please revise the Utility Plan and move the transformer to the
west 15ft to be within 10ft of the paved drive lane.
Comment Number: 6
Comment Originated: 10/14/2015
10/14/2015: The site plan has the transformer labeled as the trash dumpster.
Please revise.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam a().fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/04/2015
2016. A landscape plan for the project is currently being developed. Check with
the City of Fort Collins Project Manager Tim Kemp to see if it is advisable to
plant the two Bur Oaks shown on the plans between the sidewalk and curb or
just to note that street trees will be provided with the Timberline Road
improvements. Also if these trees are to be planted by the project determine in
the discussion with Mr. Kemp the location in the parkway where the oaks should
be placed to accommodate current and future widening.
Department: Internal Services
Contact: Russell Hovland, 970-416.2341, rhovlanda()fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated. 08/11/2015
08/11 /2015:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are offered to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI All 17.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
Topic: Landscape Plan
Comment Number: 3
Comment Originated: 08/05/2015
11/20/2015: Repeat comment. It does not appear that the seed mix has been
updated on the landscape plan. I will look for the updated seed mix on the Final
Plans.
10/12/2015: Thank you for providing details on the seed mix. It appears that
this seed mix is tailored more for the Midwest, Texas, and Oklahoma, and
includes a few non-native species. Annual rye is a particular nuisance in the city.
I'm working with the Natural Areas department to identify a more appropriate
mix for Fort Collins, and will follow up with you when I have that information. This
information can be updated on your plans at the time of Final Plan submittal and
does not require an additional round of review prior to hearing.
08/05/2015: A list of species included in the hydroseed seed mix needs to be
included on the landscape plan. A mix that includes native flowering plants in
addition to native grasses is preferred.
Department: Forestry
Contact: Tim Buchanan, 970-221.6361, tbuchanan(a)fcgov.com
Topic: Landscape Plans
Comment Number: 5
Comment Originated: 10/14/2015
10/14/2015:
Royal Flame Red Maple will not survive or thrive in Fort Collins area soils. Red
Maple is very sensitive to the high pH soils in Fort Collins. Substitute Royal Red
Flame Maple with a canopy shade tree adapted to the area. Good choices
would be Skyline Honeylocust, Catalpa and Hackberry. Some locations where
maples are currently shown appear to possibly pose a future conflict with the
Platte River Power Authority transmission lines and the lower distribution lines
along the railroad tracks. See comment number 7.
Comment Number: 6
Comment Originated: 10/14/2015
10/14/2015:
Review the LUC standard on Minimum Tree Species Diversity LUC 3.2.1 D 3.
For projects with 20-39 trees the maximum percentage of any one species is
33%. Adjust quantities used to meet this standard and list the percentage used
of each species in the plant schedule.
Comment Number: 7 Comment Originated: 10/14/2015
10/14/2015:
A number of trees appear to pose a possible future conflict with the Platte River
Power Authority Transmission lines and the distribution lines that run along the
railroad tracks. Set up an onsite meeting with the City Forester, a
representative from Platte River Power Authority, Clay Frickey the City Planner
to evaluate where trees are in conflict and if they can be planted or should be a
low maturing ornamental species. The issue appears to apply to a number of
trees currently shown on the plans. Written acknowledgment of the approval of
the Landscape Plan needs to be provided from Platte River Power Authority.
Comment Number: 8 Comment Originated: 10/14/2015
10/14/2015:
The section of Timberline by the project is planned to be improved/widened in
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
tcgov. com/developmentreview
December 04, 2015
Patricia Parish
RMG- Rocky Mountain Group
2910 Austin Buffs, Ste 100
Colorado Springs, CO 80919
RE: Centerpoint Plaza, PDP150014, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224.6045, cfrickey l( fcgov.com
Topic: Landscape Plans
Comment Number: 9
Comment Originated: 12/04/2015
12/04/2015: PRPA has issues with the landscape plan. Before hearing, we will
need to resolve their issues and get their approval on the proposed landscape
plan.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton(cDfcgov.com
Topic: General
Comment Number: 9
Comment Originated: 08/10/2015
11/30/2015: No letters of intent were submitted regarding proposed
easements. 08/10/2015: Need a letter of intent for work shown outside of the
existing easements. All work shown on the plans needs to be within existing or
future easements.. The letter of intent shall be provided before the project can
be scheduled for hearing.
Department: Environmental Planning