HomeMy WebLinkAboutUPTOWN PLAZA - PDP - PDP130025 - CORRESPONDENCE - REVISIONSProvided Comment 01.,., gated: 09/06/2013 Comment Number: 09/06/2013: Add notes to the site plan that: all signage will comply with the sign code; Done building -mounted and pole -mounted light fixtures will be shielded and down directional; mechanical units will be screened from view, meters and conduits attached to the wall will be painted to match the building color, and roof vents will be painted to match the roof. Provided Comment Originated: 0910612013 Comment Number: 3 09/06/2013: show the building dimensions on the site plan Provided Comment Number: 4 Comment Originated: 09/06/2013 09/06/2013: The land use data table should contain a listing of the potential types of commercial uses. Provided to the best of our ability at this time, the liquor storle to ail uses we t marketing efforts have not date. With the area e a being located near td by zoning will be considered, uhe CSU campus and housing, we anticipate identified a strong market for pedestrianfor oriented young people's tenants. Comment Number: 7 Comment Originated: 09/04/2013 09104/2013: The lighting fixture detans have text that is hard to read. Please clean this up. See redlines. We have included separate catalogue cuts for the fixtures. Topic: Site Plan Comment Number: 8 Comment Originated: 09104/2013 09104/2013: Please add a legal description of the property where this project is located. Done Department: Transportation Planning Contact: Emma McArdle, 970-224-6197, emcardle(ii!Dfcg0v com Topic: Site Plan Comment Originated: 0910912013 Comment Number: 1 09/09/2013: Can you clarify on the site plan that there is a sidewalk at grade adjacent to the street? Done.There needs to be an accessible path with accessible ramps at the driveways also. Done. See site plans Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(aVcaov.com Topic: Construction Drawings Comment Number: 2 Comment Originated: 09/0912013 09/09/2013: Add note to coordinate abandonment of existing water services with CoFC Water Utilities (see redlined utility plans). Added note as requested. Comment Number: 3 Comment Originated: 09109/2013 note to remove the curb stops and meter pits. Added note as requested. 09/09/2013: On the water services to be abandoned, add Comment Number: 4 Comment Originated: 09/09/2013 09/09/2013: Revise the labeling of the of the fire line connection as shown on the redlined utility plans. Revised labeling as requested. Topic: Landscape Plans Comment Originated: 09l09l2013 Comment Number: 1 09/09/2013: Show water and sewer mains and services on the landscape plan and adjust plantings to meet required separations distances. Done Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes(�f_ co� ov com Topic: Building Elevations Comment Originated: 09/0612013 Comment Number: 5 09/06/2013: Show the height of the building from grade to the tallest portion of the building. Done Topic: General Comment Originated: 0910612013 Comment Number: 6 09/06/2013: Provide a detail of the trash enclosure - showing materials, height and dimensions Provided Topic: Site Plan Comment Originated: 09/0612013 Comment Number: 1 09/06/2013: Show the setback distances from the building to the north, south, east and west lot lines. The building has been redesigned '�e a one story building that is less than 30 feet higher than finished grade. Roof access ladders are provided on the east a,. - .Jest walls. The aerial fire apparatus requiremen+ -) longer valid. Department: Stormwater Engineering. Contact: Wes Lamarque, 970-416-2418, WamargueCrDfcaov.com Topic: Floodplain Comment Number: 1 09110/2013: Please see redlines for all floodplain comments. & in drainage report. Topic: General Comment Number 2 Comment Originated: 09/10/2013 The floodplain waiver has been approved & has been noted on plans Comment Originated: 09/1012013 09/1012013: The site is also required to have 50% of the land area drain into a LID treatment facility. The development is meeting the 25% porous pavement requirement which can be counted towards this, leaving an additional 25% of the land area needing to be treated. Although 25% of the site is covered in porous pavement, more than 50% of the site will be treated by draining to this pavement and entering the detention by going through the porous pavement. t Number• 3 Comment Originated: 09110/2013 Commen 09/10/2013: Please document on the plans where the porous pavement will be located, as well as the underground detention. An exhibit has been added to clarify this information. Department: Technical Services thank you for your review and comments. The new plans have taken pains to eliminate similar future conflicts. Contact: Jeff County, 970-221.6588, icountyC-fcaov.com Topic: Building Elevations Comment Number: 1 09/0412013: No comments. Comment Originated: 09/04/2013 Topic: Construction Drawings Comment Originated: 0910412013 Comment Number: 2 09104/2013: Please correct the sub -title on sheet 1. This project is located on Lot 1, Diamond Shamrock Corner Store Subdivision. See revised. Comment Originated: 0910412013 Comment Number: 3 09/0412013: Please add a number for the second benchmark listed on sheets 1 & 2. If this is supposed to be benchmark 19-97, it is listed as being located on the southeast comer of Elizabeth & Shields. See redlines. See revised. Comment Originated: 0910412013 Comment Number: 4 09/04/2013: There are line over text issues on sheets 3, 4, 5 & 6. See redlines. See revised. Topic: General 5 Comment Originated: 09/04/2013 Comment Number. 09/04/2013: SECOND FLOOR PLAN: There are line over text issues on sheet PDP-A5. See redlines. This sheet is deleted since we have no residential uses in this submittal. Topic: Landscape Plans 09/0412013: No comments. Topic: Lighting Plan The Unit Level Addressing form ca : obtained by contacting the GIS office at gis@fr ,com or (970) 416-2483. Department: Light And Power Contact: Justin Fields, 970-224.6150, le_1_ds Efcaov.com Topic: General Comment Originated: 0910912013 Comment Number: 1 09/11/2013: A 3-phase 150 kva 120/208v served the gas station. It is on the Western edge of the property and it serves Taco Bell as well. It will be the owners responsibility to install the service from the transformer to the building. Acknowledged. Construction documents will address this issue. Comment Originated: 09/0912013 Comment Number: 2 09111 /2013: Any relocation or modification to existing electric facilities will be at the owners expense. Acknowledged Comment Number: 3 Comment Originated: 09/0912013 09/11/2013: A CA form and 1-line diagram will need to be submitted to Light and Power Engineering, 970-221-6700, The CA form is available at http:/Iwww.fcgov.com/utilities/img/site_specificluploads/c-1 form.pdf. The form will be submitted with the construction documents by the project electrical engineer per our discussion. Comment Originated: 0910912013 Comment Number: 4 0911112013: Electric capacity fees and building site charges will apply. Credit will be given for the 400 amp 208 volt service that the gas station had. Acknowledged. Thank you. C ment Number• 5 Comment Originated: 0911112013 om 09/1112013: The existing streetlights need to be shown on the landscape plan. Shade trees need to maintain 40 feet of clearance with streetlights and ornamental trees need to maintain 15 feet of clearance with streetlights. Existing street lights are being shown on the landscape plan and the suggested separation observed. Comment Number: 6 Comment Originated: 09/11/2013 09/11/2013: All units need to be individually metered. The residential units have been deleted from the project. We anticipate installing individual meters for each commercial tenant. Department: Park Planning Contact: Craig Foreman, 970-221.6618, cforeman@fcgov.com Topic: General Comment Originated: 0812612013 Comment Number: 1 08/26/2013: No comments Department: PFA Contact: Jim Lynxwiler, 970-416-2869, Ayn IerCrDnoudre-fire.ora Topic: General 09/11/2013: FIRE ACCESS FOR STRUCTURES EXCEEDING 30' (OR THREE OR MORE STORIES) IN HEIGHT In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. 2006 International Fire Code Appendix D; Poudre Fire Authority Administrative Policy 85 5 09/10/2013: Please add tree proter s specifications found in LUC 3.2.1 G to sheet PDP L2. Added 09/10/2013: Add standard landscape notes including the following. All of the following notes have been added. • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. • The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. Comment Number: 5 09/10/2013: Comment Originated: uw lut2013 Please identify if tree grates will be used around new trees along Elizabeth and the size and type of grate. Tree grates will be used around two of the existing trees being preserved in the plaza. See landscape plan. C ment Number: 6 Comment Originated: 09/10/2013 om 09/10/2013: Skyline Honeylocust would be a better species to use as the street tree along Elizabeth in the sidewalk cutouts so those trees can be changed to honeylocust. Consider using catalpa or Bur Oaks in the parking lot islands where Honeylocust is currently used. The few street trees that are being added have been changed to Honeylocust and the parking lot trees changed to Flowering Pear, Catalpa and Oak. Comment Originated: 09/1012013 Comment Number: 7 09/10/2013: The Forestry Division has noticed that Princess Kay Plum does not survive well. Consider using Chanticleer pear or a flowring crabapple in its place. With the site plan changing so drastically from the previous submittal, the space for the Princess Kay Plums was eliminated anyway. Chanticleer Pears have been added to the plan. Department: Internal Services Contact: Seth Lorson, 970-224-6189, slorson(Mcoov.com Topic: General 09/09/2013: 1. Projects with three or more tenant units require the Unit Level Addressing form to be completed and submitted to the GIS Department once plans have met final approval through Development Review and are recorded with the City. This can occur anytime during construction, but before any utilities or address signs are installed. All addressing will be determined by the GIS Department and submitted to Poudre Fire Authority, USPS, Building Services, and Fort Collins Utilities. Failure to contact GIS and determining addresses through other means may result in address changes. Acknowledged 09/11/2013: The construction plan ed to indicate the reworking of the existing drive approach onto Elizabeth Street, creating a sidewalk across the drive�,dy as well as modifying the existing handicap rar an access ramp with truncated dome detection and having the drive approach in concrete within the right-of-way, in accordance with LCUASS detail 707. See revised plans for reconstruction notes, etc. 09/11 /2013: The access ramp on the west side of the driveway out to Elizabeth Street should ideally also be rebuilt with truncated dome detection, though this appears to require work on the neighboring property to the west, requiring an easement if not already in place. Should the access ramp on the west side not be built at this time, an access easement should be conveyed to the City that allows future redevelopment of the property to the west the legal ability to install an updated access ramp. We will provide an access easement for future reconstruction. Comment Originated: 0911112013 Comment Number: 4 09111/2013: The construction plans indicate that the patch for the street cut is to be per City requirements. As the roadway is private and not owned or maintained by the City. We understand that it is private but would still like the contractor to follow City requirements for street cut. Comment Number: 5 Comment Originated: 09/11/2013 0911112013: The construction plans show an area east of the property that implies off -site work is to be done. Please clarify if off -site work is needed and if so, a letter of intent is needed from that property owner prior to a public hearing, or indication of an already existing agreement/easement for the work. It is not intended to have to do work off site. Notes have been added to clarify this intent. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex anfcoov.com Topic: General Comment Originated: 0911012013 Comment Number: 1 09/10/2013: No comments. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcgov.com Topic: Landscape Plans Comment Originated: 09/10/2013 Comment Number: 1 09/10/2013: Can any additional good existing trees be retained? Please provide a statement that explains the need to remove significant trees. The site plan has been drastically revised to allow seven (7) additional trees to be retained, this count includes many of the existing street trees along Elizabeth St. Comment Number: 2 Comment Originated: 09/10/2013 09/10/2013: Contact the City Forester for an onsite meeting to obtain the number of mitigation replacement trees for each significant tree that will be removed. The requested meeting took place between the Landscape Architect and Forester in September of 2013. A table should be provided on sheet PDP L2 that has all the significant trees identified by number, diameter, and condition, retain or remove and mitigation number of new trees for each removed tree. The requested table has been added. Total the number of required upsized mitigation trees and provide for that number of upsized trees. Mitigation trees should be sized as follows. Shade Tree 3.0 inch caliper Ornamental Tree 2.5 inch caliper Evergreen Tree 8 feet height Noted, a statement of these requirements has been added to the Landscape Plan Comment Number: 3 Comment Originated: 09/10/2013 new sidewalk along Eliz th Street to reduce the monotony of a straight, uneventful and unexciting walkway past u,e project. We propose that the implerr. stion of this undulating sidewalk, the plaza and the preservation of the existing mature street trees provides a more exciting pedestrian experience, and justifies an exemption to the detached sidewalk rule and the build -to line requirement. Topic: Site Plan Comment Originated: 0911112013 Comment Number: 1 09/11/2013: The parking lot needs to have a 5' setback from the property line to the south. The parking lot on the south and east shall be screened with landscaping to block at least 75% of the vehicle headlights, see LUC Sec. rnan ). Done We moved the south parking lot 5' north, and have added landscaping to screen the headlights. the requirement for foundation planting has been incorporated where pedestrians are not invited to hop, but eliminated at the plaza and the south building elevation where shops will place their secondary s. Foundation p�anting along the east side of the building has been moved to the orooerty line so that ns can take advantage of the provided covered walkwayvia building awningslroofs. Also worthy of s the soils engineers recommendations against foundation plantings because of the expansive nature of rlying soils. See landscape plans for specific requirements for foundation planters. Comment Number: 2 Comment Originated: 09/11/2013 09111/2013: The parking lot interior landscaping shall be 6% of the interior space. This space needs to be delineated according to Figure 1 in LUC Sec. 3.2.1(E)(5) for staff review to confirm compliance. Interior parking lot landscaping is 13% as s own on the landscape plans an ite Data Chart. Comment Originated: 0911112013 Comment Number: 3 09/11/2013: If the site is removed from the floodplain as requested, why raise the "sidewalk cafe plaza"? It seems that this would lessen the engagement between the public and the commercial activity. The preservation of the existin street trees is the primary reason to maintain the existing contours on -site The site was previously leveled when it was a convenience store/gas station which resulted in the eastern portion of the site being approximately 2 Y2 - 3 feet higher than the east property line and the NE corner of the site. Thus the existing berm, on which the preserved trees are located. The design of the new plaza facilitates and encourages the interaction between the public and the commercial activity. Department: Engineering Development Review Contact: Marc Virata, 970.221.6567, mviratfcaov.com Topic: General Comment Originated: 09/11/2013 Comment Number: 1 09/11/2013: The construction plan indicates keeping the existing attached sidewalk and saw cutting out areas for tree and tree grates, which would leave about 2 feet of concrete width to the south of the cut-out area. See above commentary regarding street scape.The plans are then ambiguous on what occurs directly south in terms of hardscape. With the plans showing removal of the existing trees south of the existing walk, the implementation of trees in tree grates will need to result in the removal of the entire existing sidewalk and the installation of a new wider attached sidewalk. That concept has been abandoned and the existing street trees are now being preserved to the maximum extent possible. The sidewalk should be 12 to 15 feet in width to provide some shy distance away from the structures as well as being in keeping with the Campus West study. Although we propose to make the sidewalk undulating to enhance the pedestrian experience, we have honored the minimum width of 12 feet. Additional right-of- way dedication and/or access easement may need to be dedicated. None is proposed or anticipated with this new design. Comment Originated: 0911112013 Comment Number: 2 concrete block units, ` s occasionally interrupted in favor of brick or other compatible materials to reduce the monotony u, a single long kickplate. Display windows are han in a variety of ways, including storefront and single window pattems. Transoms are accomplished by either projected /soldier brick, projected stucco or some other type of metal cap. ne and brick - A base element shall be clearly defined by using structured materials such as sto (please provide details of the manufactured stone proposed). Our primary base element material is split face CMU. / - A top element with a cornice, stepped parapets etc... (See Sec. 3.5.3(E)(6). We have utilized both stucco cornices / and stepped parapets where the top is of a flat commercial shape. We have broken up the monotony of a single flat top plane with vertically raised cornices and, periodically, towers with sloped roofs. - Flat roofs with parapets are a signature of commercial/retail development and would be much better suited for this development. Done. The stucco areas within the gabled roofs are pretty stark. The gable / roofs have been deleted and substituted with flat cornices and hip roofs of standing seam roofing. The primary wall material of the "towers" is brick with a CMU base. The major horizontal element of the tops of the walls meets the city requirement of a minimum height of 20 feet above grade. However, there are a few isolated places where it was necessary to vary that height, either higher or lower, to create visual interest and to break up the long plane of the roofs. / Note also that we are proposing the use of Qhotovgltaic panels to supplement our electrical demands. To / highlight this state of the art product, it required the incorporation of a sloped roof on a portion of the JJJ south elevation (away from the street) to maximize the solar capture efficiency. In order to prevent an overly high projection appearance, the lowest portion of that supporting wall is lower than 20', but rises on a steep slope to 20' in a few short feet of run. Topic: General Comment Originated: 0911112013 Comment Number: 1 09/1112013: The site plan notes that 38 bike parking spaces are provided inside the building but there are only 19 31a lockers. How will two bikes fit into each locker? Each bike is required to have 6 square p0.ruNr feet of space. a have deleted the residential portion of the project, so the in and residential bike parking requirement no longer app ies. We have provided 13 exterior bike parking spaces, with 4 of those being under cover, which exceeds city requirements as shown below: Fast Food 2,153 SF @ 1.511000sf Min 4 Financial 4,418 SF @ 1.014000sf Min 4 General Retail 8,672 SF @ 1.014000sf Min 4 Total 12 with 20% of 8 = 2 being under cover Topic: Landscape Plans Comment Originated: 0911112013 Comment Number: 1 09/11/2013: A 10' detached sidewalk with street trees is required. This sidewalk coupled with the 10' 25' build -to line should provide enough space to preserve some of the existing mature trees on site. tandards shall be permitted: 1. in LUC 3.5.3 C 2 (d) Exceptions to the b - atio or garden between a / order to fonn an outdoor space such as a plaza, courtyar , p a J building and the sidewalk. Such a larger front yard area shall have landscaping, low walls, fencing or railings, a tree canopy and/or other similar site improvements along the sidewalk designed for pedestrian interest, comfort and visual continuity. f At Staff s request we have moved portions of the building behind the Build To line in order to preserve the existing mature street trees and to create a pedestrian oriented plaza. See site and landscape plans for locations of planters, curbs, low walls and fencing to delineate the plaza from the sidewalk. Since the sidewalk will have to be replaced in order to satisfy city requirements of a minimum of a 10 foot width (the existing walk is only 7' wide), we have taken the liberty of adding new planters in the sidewalk to create the illusion of an undulating Community Development and Neighborhood Services City of 281 North College Avenue Box 580 Fart Collins FPO Fort Collins, CO 60522 o 970.221.6750 970.224.6134 - fax fcgov. com/d evelopmenfreview September 16, 2013 Jim Hillhouse Hillhouse Architects, Inc. 8897 Gander Valley Ln. Windsor, CO 80550 RE: Uptown Plaza, PDP130025, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com. Comment Summary: Department: Current Planning Contact: Seth Lorson, 970.224-6189, slorson(rpfcoov.com Topic: Building Elevations Comment Number: Comment Originated: 09/11/2013 V09/11/2013: Please provide color renderings of the building elevations and perspectives. Provided Comment Number: Comment Originated: 09/11/2013 / 09/11/2013: Generally the building elevations have a residential look. Please employ some design / characteristics that will express the commercial/retail nature of the building (see below). The Campus West Community Commercial District Planning Study Report specifically calls for urban development with a "new positive street environment". The residential portion of the original submittal has been deleted. e architec ura concept is now wholly a commercial use and appearance. The building has been totally redesigned to incorporate Staffs comments. Comment Originated: 0911112013 Comment Number: 3 09/1112013: In order to create a more commercial and urban design, the following elements will be helpful: / - Each store front (5-6 in total) shall be broken into modules that clearly define each business and break f up the massing and scale. Currently there is a stucco plane carrying across the building for 114' and picked up again 8' beyond for another 19'. Each storefront is now unique, but incorporates similar materials and color elements in a non -repetitive non -monotonous manner to present a cohesive persona. - Each storefront shall be clearly delineated by using features such as awnings, arcades, porticos etc... f(such as the metal awning provided on the east elevation). And utilize a more traditional retail frontage with a kickplate, display window, and transom. The kickplate is established by the use of split face