Loading...
HomeMy WebLinkAboutED CARROLL MOTORS (3003 S. COLLEGE) - PDP/FDP - 5-98 - CORRESPONDENCE - REVISIONS (3)July 8, 1998 Leanne Harter Project Planner City of Fort Collins Current Planning Department 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Ed Carroll Motors - Project Development Plan Dear Leanne: The attached prints of Ed Carroll Motors Project Development Plan, Final Site and Landscape Plan, reflect revisions made in accordance with the comments in your letter of June 25, 1998. Our specific response to each comment is noted below, using numbering shown on your letter. 1. Zoning Dept. a. Bike racks have been indicated on the plan. b. A handicap ramp exists at the corner of McClelland and Swallow. c. noted. 2. Light and Power Utility - noted, and waiting on comments. 3. Engineering Department -addressed by Stewart and Assoc. 4. Stormwater Utility - addressed by Stewart and Assoc. 5. Water/Wastewater Utility - no comments. 6. Current Planning Department a. noted,on the plan. b. Striping has been noted on the plan. c. waiting on comments. d. additignal landscaping has been added. e. notes have been added. f. noted on the plan g. signature blocks have been changed Please review this information and should you have any questions, give me a call. Sincerely, JIM SELL DESIGN Inc. Brad Saucerman Landscape Architect/Project Manager encl. 153 WEST MOUNTAIN AVENUE FORT COLLINS, COLORADO 80524 970 484 1921 FAX: 970 484 2443 E-MAIL: 11MSELL@FRII.COM