Instructions: Input contour elevation and the surface area that contour enc
The spreadsheet calculates volume-provided-tnr A-/=r+igv+,,er
ELEVATIONm60--
A (B)
CONTOI
(ft)
^2)
(ft)
27.1200
28
00
0.88
28.40
6.00
0.4000
0.0000
0.0000
0.0000
0.00.00
0.00
0.00
0.00
0.00
0.00
VOLUME PRC
Ed Carroll Motors
7/26/98 J.C. I
i
INCREMENTAL
I VOLUME
I (ft^3)
1
i 4008.69
7756.30
: 0.00
0.00
I 0.00
i 0.00
1 0.00
0.00
0.00
11764.99
ftA
0.27 j ac-ft
B. Deming
I
Lt. C. Fog PCREA,S
S T � � � G � r
IdJS�F�� C,i�JJ�
pl.A1,7( METE.6L 7EPcD Iry G5
E� EV , hRract Gi,�) G 4ts)
Z Lf /
100 Year
Ed'Cairoll•Motors 7/26/98
100-year
Composite'C'I
0.9875
Area
2.01
Modified
Release Rate
1.25
j
M. FATER
D. JUDISH
DETENTION POND SIZING
5/95
Nov-97
TIME
TIME
INTENSI
Q 100
Runoff
Release
Required
Required
cum
100 year
1
Volume
Cum total
Detention
Detention
(mins)
(secs)
(in/hr)
(cfs)
(ft^3)
(ft^3)
(ft^3)
(ac-ft)
0
0
01 0.00
0
0.0
0.0
0.0000
5
300
8.7001 17.27
5180.524
375.0
4805.5
0.1103
10
600
7.1401 14.17
8503.205
750.0
7753.2
0.1780
15
900
6.06011 12.03
10825.51
1125.0
9700.5
0.2227
20
12001
5.2101 10.34
12409.44
1500.0
10909.4
0.2504
25
15001
4.6301 9.19
13784.96
1875.0
11910.0
0.2734
30
1800
4.2001 8.34
15005.66
2250.0
127.5 .7
0.2928
35
2100 j
3.8101 7.56
15880.98
2625.0
13256.01
0.3043
40
2400
3.600; 7.151
17149.321
3000.0
14149.3
0.3248
451
7001
3.280 i 6.511
17578.05
3375.0
14203.11
0.3261
50
3000
3.0201i 5.991
17982.97
3750.0
551
33001
2.800! 5.561
18340.251
4125.01
14215.21
0.3263
601
36001
2.600 5-A-61
18578.431
4500.01
14078.41
0.3232
65.
3900
2.4301 4.821
18810.661
4875.01
13935.71
0.3199
701
4200j
2.300i 4.571
19173.891
b;ebU-Uj
139 3.91
0.3196
75
45001
2.170 4,311
19382.3j
5625.01
13757.31
0.3158
801
48001
2.070; 4.111
19721.721
6000.0j
13721.71
0.3150
85
51001
1.960j 3.89
19840.81
6375.0
13465.8
0.3091
90
5400
1.870 " 3.71
20043.27
6750.0
- 13293.3
- 0.3052
95
5700
1.7701 3.51
20025.4
7125.0
12900.4 j
0.2962
100
6000
1.700;' 3.37
20245.73
7500.0
12745.7
0.2926
105
6300
1.6301 3.24
20382.68
7875.0
12507.71
0.2871
110
6600
1.5701 3.12
20567.27
8250.0
12317.31
0.2828
115
6900
1.5001 2.981
20543.46
8625.0
11918.51
0.2736
120
7200
1.440 i 2.86 j
20579.18
9000.0
11579.21
0.2658
Page 1
REVISION
COMMENT SHEET
DATE: July 9, 1998 TO: Stormwater
PROJECT: #5-98 Ed Carroll Motors - LUC Type II PDP/FC
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, July 29,1998
1. The submitted pond -rating curve is incorrect. The volume equation is being used
wrong. See the attached sheets for our calculations. You supposedly raised the high
water level, but the surface areas have not changed and are still too high by our
calculations. Please provide more available detention volume.
RESPONSE:
2. It is recommended that a pan be placed in the existing parking lot for the outlet from
the pond.
RESPONSE:
Refer to the redlined plans and report for additional review comments.
Date: -� L2 $l50111� Signature:
cG'•T M 8�.c+rJD Fo RD
��Na E abtRrE(2
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF MUONS Ssti w.sRQ'
_ Ply _ Site _ Damage Report _ Odff
U4 _ Redhe UWq _LM6qCCity of Fort Collins
PROJECT
COMMENT SHEET
Current Planning
DATE: July 27,1998 DEPT: Water & Wastewater
PROJECT: #5-98 Rd Carroll Motors _ LUC Type II
PDP/FC
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, July 29,1998
-Change note on landscape plan pertaining to landscape separation to read "water and sewer
mains and services".
-Is an irrigation tap needed for this development.
-See landscape and utility plans for other comments.
i
Date: Signature: !-
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_& PLAT X SITE _DRAINAGE REPORT _OTHER
XUTILITY X REDLINE UTILITY —XLANDSCAPE
City of Fort Collins
REVISION
COMMENT SHEET
DATE: July 9, 1998 TO: Engineering
PROJECT: #5-98 Ed Carroll Motors - LUC Type II PDP/FC
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, July 29,1998
GENERAL COMMENTS:
Sheet 3 of 4: Utility, Grading, Drainage and Erosion Control Plan
O You will need to have on offsite construction easement for the construction of
the retaining wall along the north edge of the property. Since this is an easement
agreement between the two property owners, please provide us with a copy of
the signed agreement. We will need to have this prior to this project going to the
P&Z Hearing.
O The Site and Landscape Plan still doesn't match the utility plans. Please address
this concerns.
Date: 711-3/yg Sipabm:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ PIS ✓ske _ Damage Report
✓ Utility ✓Redbu Utk /Lao&*
bicycle parking from the plan and add a note that it is to be located
near the main entrance of the existing Ed Carroll site. If this
location is not feasible, the bicycle parking on the site/landscape
plan should be moved along Swallow near the east edge of this
site so that it is in a visible and convenient location for those
patrons and employees that would utilize it.
That concludes staff comments at this time. Additional comments may be
forthcoming as various departments continue their review of the project
development plan.
It appears as if another round of revisions will be required to address the
remaining outstanding concerns, including the request for alternative
compliance. As that most likely will be the last round, we will try to make it an
abbreviated process and will schedule the Planning and Zoning Board date as
soon as everything is addressed. Possible dates for hearing by the Planning
and Zoning Board could include September 17th (however, we schedule for that
hearing on August 19th and we would need to have revisions to review by the
end of this week), October 1 st, or October 15th.
If you have any questions regarding these comments, please feel free to contact
me at 221-6750.
Best r ards,
r
Leanne A. Harter, AICP
City Planner
xc: Tim Blandford
file
Commu- " v Planning and Environmental vices
Current Planning
City of Fort Collins
August 5, 1998
Jim Sell Design, Inc.
Brad Saucerman
153 West Mountain
Fort Collins, Colorado 80526
Dear Brad:
City staff has reviewed the revisions submitted for the Ed Carroll Motors, #5-98
and would like to offer the following comments:
1. Comments from the Engineering Department are attached.
2. Comments from the Stormwater Utility are attached.
3. Comments from WaterMastewater are attached.
4. The Current Planning Department offered the following comments:
a) We have reviewed the alternative compliance request and at this
time, feel that additional information is required for staff to
recommend approval of the request to the Planning and Zoning
Board. Please address the following in the request:
(1) demonstrate what is innovative about the site lighting
that is being proposed --we suggest the possibility of
lowering the poles, the usage of a light source
rather than metal halide, and replacing the Type 4
lights on the perimeter with a Type 3; and
(2) will lighting levels for the storage area be less than
those for vehicles sales.
b) Please demonstrate that the percentage of parking lot interior
landscaping is at least the 10% required by the Land Use Code.
(c) After further consideration and discussion with Kathleen Reavis
with Transportation Planning, the location of the bicycle rack is one
wherein the number of people using it may be minimal. Is there an
opportunity to place this rack near the entrance of the building
(which is not part of this PDP request?) If so, please remove the
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020