Loading...
HomeMy WebLinkAboutED CARROLL MOTORS (3003 S. COLLEGE) - PDP/FDP - 5-98 - CORRESPONDENCE -I ON VOLUME PROVIDED 9/11 Instructions: Input contour elevation and the surface area that contour enc The spreadsheet calculates volume-provided-tnr A-/=r+igv+,,er ELEVATIONm60-- A (B) CONTOI (ft) ^2) (ft) 27.1200 28 00 0.88 28.40 6.00 0.4000 0.0000 0.0000 0.0000 0.00.00 0.00 0.00 0.00 0.00 0.00 VOLUME PRC Ed Carroll Motors 7/26/98 J.C. I i INCREMENTAL I VOLUME I (ft^3) 1 i 4008.69 7756.30 : 0.00 0.00 I 0.00 i 0.00 1 0.00 0.00 0.00 11764.99 ftA 0.27 j ac-ft B. Deming I Lt. C. Fog PCREA,S S T � � � G � r IdJS�F�� C,i�JJ� pl.A1,7( METE.6L 7EPcD Iry G5 E� EV , hRract Gi,�) G 4ts) Z Lf / 100 Year Ed'Cairoll•Motors 7/26/98 100-year Composite'C'I 0.9875 Area 2.01 Modified Release Rate 1.25 j M. FATER D. JUDISH DETENTION POND SIZING 5/95 Nov-97 TIME TIME INTENSI Q 100 Runoff Release Required Required cum 100 year 1 Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 01 0.00 0 0.0 0.0 0.0000 5 300 8.7001 17.27 5180.524 375.0 4805.5 0.1103 10 600 7.1401 14.17 8503.205 750.0 7753.2 0.1780 15 900 6.06011 12.03 10825.51 1125.0 9700.5 0.2227 20 12001 5.2101 10.34 12409.44 1500.0 10909.4 0.2504 25 15001 4.6301 9.19 13784.96 1875.0 11910.0 0.2734 30 1800 4.2001 8.34 15005.66 2250.0 127.5 .7 0.2928 35 2100 j 3.8101 7.56 15880.98 2625.0 13256.01 0.3043 40 2400 3.600; 7.151 17149.321 3000.0 14149.3 0.3248 451 7001 3.280 i 6.511 17578.05 3375.0 14203.11 0.3261 50 3000 3.0201i 5.991 17982.97 3750.0 551 33001 2.800! 5.561 18340.251 4125.01 14215.21 0.3263 601 36001 2.600 5-A-61 18578.431 4500.01 14078.41 0.3232 65. 3900 2.4301 4.821 18810.661 4875.01 13935.71 0.3199 701 4200j 2.300i 4.571 19173.891 b;ebU-Uj 139 3.91 0.3196 75 45001 2.170 4,311 19382.3j 5625.01 13757.31 0.3158 801 48001 2.070; 4.111 19721.721 6000.0j 13721.71 0.3150 85 51001 1.960j 3.89 19840.81 6375.0 13465.8 0.3091 90 5400 1.870 " 3.71 20043.27 6750.0 - 13293.3 - 0.3052 95 5700 1.7701 3.51 20025.4 7125.0 12900.4 j 0.2962 100 6000 1.700;' 3.37 20245.73 7500.0 12745.7 0.2926 105 6300 1.6301 3.24 20382.68 7875.0 12507.71 0.2871 110 6600 1.5701 3.12 20567.27 8250.0 12317.31 0.2828 115 6900 1.5001 2.981 20543.46 8625.0 11918.51 0.2736 120 7200 1.440 i 2.86 j 20579.18 9000.0 11579.21 0.2658 Page 1 REVISION COMMENT SHEET DATE: July 9, 1998 TO: Stormwater PROJECT: #5-98 Ed Carroll Motors - LUC Type II PDP/FC All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, July 29,1998 1. The submitted pond -rating curve is incorrect. The volume equation is being used wrong. See the attached sheets for our calculations. You supposedly raised the high water level, but the surface areas have not changed and are still too high by our calculations. Please provide more available detention volume. RESPONSE: 2. It is recommended that a pan be placed in the existing parking lot for the outlet from the pond. RESPONSE: Refer to the redlined plans and report for additional review comments. Date: -� L2 $l50111� Signature: cG'•T M 8�.c+rJD Fo RD ��Na E abtRrE(2 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF MUONS Ssti w.sRQ' _ Ply _ Site _ Damage Report _ Odff U4 _ Redhe UWq _LM6qCCity of Fort Collins PROJECT COMMENT SHEET Current Planning DATE: July 27,1998 DEPT: Water & Wastewater PROJECT: #5-98 Rd Carroll Motors _ LUC Type II PDP/FC All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, July 29,1998 -Change note on landscape plan pertaining to landscape separation to read "water and sewer mains and services". -Is an irrigation tap needed for this development. -See landscape and utility plans for other comments. i Date: Signature: !- CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _& PLAT X SITE _DRAINAGE REPORT _OTHER XUTILITY X REDLINE UTILITY —XLANDSCAPE City of Fort Collins REVISION COMMENT SHEET DATE: July 9, 1998 TO: Engineering PROJECT: #5-98 Ed Carroll Motors - LUC Type II PDP/FC All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, July 29,1998 GENERAL COMMENTS: Sheet 3 of 4: Utility, Grading, Drainage and Erosion Control Plan O You will need to have on offsite construction easement for the construction of the retaining wall along the north edge of the property. Since this is an easement agreement between the two property owners, please provide us with a copy of the signed agreement. We will need to have this prior to this project going to the P&Z Hearing. O The Site and Landscape Plan still doesn't match the utility plans. Please address this concerns. Date: 711-3/yg Sipabm: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ PIS ✓ske _ Damage Report ✓ Utility ✓Redbu Utk /Lao&* bicycle parking from the plan and add a note that it is to be located near the main entrance of the existing Ed Carroll site. If this location is not feasible, the bicycle parking on the site/landscape plan should be moved along Swallow near the east edge of this site so that it is in a visible and convenient location for those patrons and employees that would utilize it. That concludes staff comments at this time. Additional comments may be forthcoming as various departments continue their review of the project development plan. It appears as if another round of revisions will be required to address the remaining outstanding concerns, including the request for alternative compliance. As that most likely will be the last round, we will try to make it an abbreviated process and will schedule the Planning and Zoning Board date as soon as everything is addressed. Possible dates for hearing by the Planning and Zoning Board could include September 17th (however, we schedule for that hearing on August 19th and we would need to have revisions to review by the end of this week), October 1 st, or October 15th. If you have any questions regarding these comments, please feel free to contact me at 221-6750. Best r ards, r Leanne A. Harter, AICP City Planner xc: Tim Blandford file Commu- " v Planning and Environmental vices Current Planning City of Fort Collins August 5, 1998 Jim Sell Design, Inc. Brad Saucerman 153 West Mountain Fort Collins, Colorado 80526 Dear Brad: City staff has reviewed the revisions submitted for the Ed Carroll Motors, #5-98 and would like to offer the following comments: 1. Comments from the Engineering Department are attached. 2. Comments from the Stormwater Utility are attached. 3. Comments from WaterMastewater are attached. 4. The Current Planning Department offered the following comments: a) We have reviewed the alternative compliance request and at this time, feel that additional information is required for staff to recommend approval of the request to the Planning and Zoning Board. Please address the following in the request: (1) demonstrate what is innovative about the site lighting that is being proposed --we suggest the possibility of lowering the poles, the usage of a light source rather than metal halide, and replacing the Type 4 lights on the perimeter with a Type 3; and (2) will lighting levels for the storage area be less than those for vehicles sales. b) Please demonstrate that the percentage of parking lot interior landscaping is at least the 10% required by the Land Use Code. (c) After further consideration and discussion with Kathleen Reavis with Transportation Planning, the location of the bicycle rack is one wherein the number of people using it may be minimal. Is there an opportunity to place this rack near the entrance of the building (which is not part of this PDP request?) If so, please remove the 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020