HomeMy WebLinkAboutED CARROLL MOTORS (3003 S. COLLEGE) - PDP/FDP - 5-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: �d Lgr�:p I I I" I o 4-c
Planner: L eao*r hyo„r Tralic Operations:
Engineer: A;
Date: z b l la s
Items Requested
Site land I Plat Utility I Drainage Rpt Other Items Required
Engineering Z 1
Redlined Items Being Returned
Site I Land Plat I Utility Drainage fl t Other Items Being Returned
1.
brmwater
Water/Wastewater
z
t
.
TranOrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the rembmittai/ revisions.
i
' . . ,
RevisionsRouting
,l
•
' II ' • •MINI ANNON
I
i V lr Y •ra.,
um
No
ENGINEERING: PAVEMENT
mm
m
•
ONo�a0
BUILDING INSPECTION
ON
MAPPING / DRAFTING
IN
m
ADVANCE PLANNING
NO������
mR.O.W.
������
PLANNING
WATER CONSERVATION
I•
m����s�������
PUBLIC SERVICE
m
STATE HIGHWAY DEPARTMENT -IN
mmm
DITCH COMPANY
RAILROAD: UP or BN/CS
MOWN
IN
IN
mmmmm
IN
mmmmmm
IN
mmmmomm
IN
^R7+IY 61
_—