HomeMy WebLinkAboutED CARROLL MOTORS LOT EXPANSION - PDP - 5-98A - CORRESPONDENCE - REVISIONS (4)I - b` Name Date Page 2 46. Noted. 49. Cam McNair and the Engineering staff are currently researching the impact of the Special Improvements District that originally funded the construction of McClelland. 50. The plan has been modified, and the gate in now within the next aisle to the east. SitelLandscape 39. The walks have been dimensioned. 40. All easements, property lines, ROW and utilities have been shown. 41. Spot elevations have been taken off the site plan. 42. Existing features have been shown on the plan, as a screened line. 43. Noted, and changed. Light & Power Landscaping 55. Noted. Transportation Planning ' SitelLandscape 63. The site and Landscape Plans are now separated into two sheets. 64. The McClelland ROW has been shown on the plan 65. Cam McNair and the Engineering staff are currently researching the impact of the Special Improvements District that originally funded the construction of McClelland. Zoning General 1. Noted. Please contact our office, should you have any questions regarding this resubmittal. Sincerely, Jim Sell Design, Inc. auce Senior Landscape Architect/Project Manager cc: File J APROnrr 111 r.u.ANINISIV"..iW.ESUOMM.16.02.DOC August 19, 2002 Mr. Troy Jones City of Fort Collins Planning Department 281 North College Ave. Fort Collins, Colorado 80525 RE: Project No.: Ed Carroll Motors Dear Troy: G1r114011Y Archiitetam bwr vznenlalE Crnnnuwity Plrnnn�q The attached prints of Ed Carroll Motors -Lot Expansion H, Project Development Plan, Site,and Landscape Plan, reflect revisions made in accordance with the comments in your letter of March 25, 2002. Our specific response to each comment is noted below, using numbering shown on your letter. Please refer to engineer's responses for specific comments. Planning Comments Alternative compliance 76-82 The lighting plan has been modified to comply with the Land Use Code Sections 3.2.4. This was achieved by eliminating the number of fixtures on certain poles within the site. 83. The plan as resubmitted is in compliance with the Land Use Code. General 84. Noted. 85. Noted. Lighting Plan 80. We have submitted two lighting plans, one showing the illumination 20' off the property line, and the other showing the average just within the property line. The lines have been darkened for clarity. The correct site plan has been submitted for the lighting plan. The plan has been modified to comply with the Land Use Code. Site/Landscape 71. The site and Landscape plans have been separated into two individual drawings. 72. The site plan has been cleaned up for clarity. 73. The tree shown on the plan as being located in the drive aisle, is being transplanted to another location on -site (see Landscape Plan) 74. The plans are now coordinated, and identify the same information. 75. Noted. Engineering General 45. The site and Landscape plans are now, two separate plans.