HomeMy WebLinkAboutKRUGER OFFICE BUILDING - PDP - 10-98 - CORRESPONDENCE - (5)REVISION
COMMENT SHEET
DATE: September 21, 1998 DEPT: Water/Wastewater
PROJECT: #10-98 Kruger Office Building - Type II PDP
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 23, 1998
-Provide a method to associate the note pertaining to existing water service to the
existing water service on overall utility plan.
-Water service shown on site and landscape plans does not correspond with civil
design. Coordinate site and landscape designs with civil design.
-Include notes on landscape plan pertaining to separation distances and locates.
-See utility plans for other comments.
e
Date: jilt Signature:
U <
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat X Site _ Drainage Report _Other
X X X Utility Redline Utility Landscape
City of Fort Collins
3. Please provide a cross-section of the spillway of the detention pond and indicate
dimensions, elevations, overflow depth, 100-year WSEL & curb opening..
RESPONSE:
4. When calculating the difference in runoff between the Old Town Basin Master Plan
and developed conditions, why is 3 hours used? The difference in runoff should be
calculated using the same time of concentration as in the rest of the calculations.
Please recompute the detention volume required due to increased imperviousness.
RESPONSE:
D-oy
5. Please show that the proposed building will not cause a rise greater than a4lt in the
100-year floodplain WSEL. The project will not be approved until this is proven.
RESPONSE:
6. It is not apparent that the drain chase will be able to sustain the runoff from the site.
Please provide supporting calculations to show the capacity of the chase.
RESPONSE:
Erosion/Sediment Control Second Submittal Comments
1. Previous comments have been addressed, plan is OK.
Please refer to the redlined plans and report for additional review comments.
kruger3.doc
REVISION
COMMENT SHEET
DATE: August 27, 1998 TO: Stormwater
PROJECT: #10-98 Kruger Office Building - PDP - Type II
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 23,1998
I. When calculating runoff for each subbasin, the composite `C' for the entire site is
used. This is incorrect as composite `C's should be determined for each subbasin and
then used to calculated runoff for that particular subbasin. Please recompute the
runoff for each subbasin with newly calculated C's. In addition, please recompute the
detention pond required volume using the `C' for subbasin #1 only, and not the
overall site `C'.
RESPONSE:
2. For the concentration pan and alley, capacity calculations have been given. However,
it is not apparent how the 100-year WSELs were determined. Please provide
supporting calculations to show how these were determined.
RESPONSE:
(continued on back)
Date: ✓ /� /� 0-Signature:
POSE TervRN id/T,y j?FtuDH/7T,+L c'
�Du NES T"`► 5OI.�Q..d
Tld�l 1ewe. + he . eo
— ReFal¢T
- I�S�NsEs'
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 13, 1998 TO: Engineering Pvmnt
PROJECT: #10-98 Kruger Office Building - Type II PDP
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, March 18,1998
N W o v P1A� iN 97 L/TS Z,,/i.4 -
��£'Gi'Ui��
Date: .5- �0-5e Signature: g� R, c
CM ME F YOU WE TO RECEIVE COPIES OF REVISIONS
_ Pig _ Sid — Ode
— Udk — Redlme U# — In City of Fort Collins
Comments continued from sheet 1...
Sheet 3 of 4: Grading, Drainage, and Utility Service Plan
O Please look at regrading the site so that it drains into the alley rather than draining through
a sidewalk chase. The City does not want to maintain the chase.
O Asphalt cuts are not allowed to be along a vehicles tire path. Please make sure that the
asphalt cuts are either in the center of the travel lane or along lane line.
O You will need to provide either an offsite construction easement or a letter from the adjoining
property owner giving permission to perform any construction on his/her property.
O lf-the a!
` � X
� .aivu3j .. ,•
DATE: August 27, 1998 TO: Engineering
PROJECT: #10-98 Kruger Office Building - PDP - Type II
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, September 23,1998
MAJOR COMMENTS:
note: refer to the individual sheets for specific comments and concerns
Sheet 2 of 4: Copy of Recorded Plat and Survey Map
O The alley needs to be vacated by separate document and process. It will need to go to City
Council and they will neeVo ap rove of the vacation.
ZND 5�. aacl ,tvtG O^ C.,, �
Comments continued on sheet 2 c*
Date: y/js
r. Are the apartments accessible from the south entrance? Are the offices
accessible from the north entrance? Please provide a bike rack at both
entrances.
S. The site is located in a no -rise floodplain. The applicant must
demonstrate that it is not creating a rise in the floodplain.
t. As per the newly published Development Manual, please change the
Planning Certification to reference the Planning Director. Staff apologizes
for any inconvenience or conflict with previous comments regarding this
certification.
2. Comments and redlined utility plans from the Engineering Department are
attached. Please return all redlined documents with plan revisions.
3. Comments from the Engineering Pavement Department are attached.
4. Comments and redlined utility plans from the Stormwater Utility are attached.
Please return all redlined documents with plan revisions.
5. Comments and redlined utility plans from the Water and Wastewater Utility are
attached. Please return all redlined documents with plan revisions.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request.
Please contact me at 221-6206 if you have any questions or concerns related to these
comments.
Sincerely,
Michael Ludwig, AICP
City Planner
xc: Tim Blandford, Engineering
Stormwater
nt,; C•urrePlanmin grFde)#1C09;8
As previously requested by the Zoning Department, foundation plantings
are needed along the west side of the building.
h Please add a deciduous or ornamental tree along the west property line at
F the west end of the southern row of parking.
A 6-inch vertical curb is needed between the 4-foot wide sidewalk and the
16-foot wide private drive on the east side of the proposed building.
�. Please provide standard Landscape Notes on the Landscape Plan
regarding the grade of materials, separation distances from utilities,
installation of all landscaping or provision of a letter of credit for 125% of
materials and installation, coordination between the engineering and
planning consultants, tree protection / preservation notes from Section
3.2.1 of the Land Use Code, etc.
�k As previously requested, please submit a lighting plan showing proposed
photometric, levels across the site. The lighting plan should be sheet 5 of
5 of the PDP plan set. Please renumber all sheets of the plan set
accordingly.
Il Please add a note to the Site Plan which states that all signage will
comply with the City Sign Code.
p� The Site Plan indicates that the trash dumpster at 210 W. Magnolia will
be shared with this property. No agreements or letter of intent have been
submitted to date. A letter of intent must be submitted before a PDP
hearing can be scheduled.
rt// Please label the building elevations as north, south, east and west rather
than front, rear, right and left.
gyp./ Please specify building colors and materials on all building elevations.
O No off -site grading easements have been submitted to date. A letter of
intent for all off -site easements must be submitted before a PDP hearing
can be scheduled. The Engineering Department's suggestion that the site
be graded so that it drains towards the alley would eliminate the need for
the drainage pan, sidewalk chase and off -site grading easement on the
west side of the property.
q. The design of the parking lot needs to be revised. 15-footo long parking
stalls may not utilize curb stops. Vehicle overhang may not intrude on the
landscape buffer. A drive aisle with 90 degree parking on both sides must
be 24 feet. A backing.area should be provided at the west end of the
parking lot so that cars in the western most spaces don't have to back
through the parking lot to exit the site.
Commun Planning and Environmental c !ices
Current Planning
City of Fort Collins
September 29, 1998
Bud Frick
W J Frick Design Group
526 S. College Avenue
Fort Collins, CO 80524
Dear Bud:
Staff has reviewed your documents for the Kruger Office Building PDP which were
submitted on August 27, 1998 and offers the following comments:
1. The Current Planning Department stated the following:
I
07 c1 As previously requested by the Water Conservation Specialist, the
landscape plan shall include the total area (in square feet) for each
landscape category. Landscape categories are distinguished by their
water requirements and intended maintenance level. Examples of
possible categories include, but are not limited to, high water turfgrass,
low water turfgrass, low water planting beds, moderate water planting
beds, and non -plant areas (paved areas, etc.). This information is
required at the PDP stage.
As previously requested by TCI of Fort Collins, please provide a utility
easement along the north property line. Existing facilities are to be
relocated at the developer's expense.
WOOF Please provide information regarding the number of bedrooms per
residential dwelling unit in the Land Use Data and within the building
envelope. Please verify that the residential parking ratio complies with the
Land Use Code.
The parking ratio for the office use exceeds the maximum allowed by
Section 3.2.2[K][2] of the Land Use Code. Either one commercial parking
space must be eliminated or the applicant must request Alternative
Compliance in accordance with Section 3.2.2[K][4] of the Land Use Code.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020