Loading...
HomeMy WebLinkAboutMASON STREET MOTEL - PDP/FDP - 7-98 - REPORTS - DRAINAGE REPORTMr. Basil Hamdan Page Three October 30, 2000 Building/ Location Lowest Entrance El. Existing Freeboard ft Proposed Freeboard ft Salvation Army 5035.12 - 0.72 - 0.98 Raynor Garage Door 5035.44 - 0.40 - 0.66 South Mesa Vet Hospital 5036.55 0.71 0.45 Ramada Inn 5038.67 2.82 2.57 Barnes & Noble 5036.97 1.12 0.87 REI 5037.78 1.94 1.68 Bank on Boardwalk 5039.77 3.93 3.67 Olive Garden 5041.73 5.89 5.63 Storage Unit Office 5034.53 - 1.31 - 1.57 Storage units near Mason St. 5034.20 - 1.64 - 1.90 State Parks Building 5035.73 - 0.11 - 0.37 Movie Theatre 5035.63 - 0.21 - 0.47 71 Floodproofing alternatives were investigated for those buildings within the 100-year water surface. Due to their entrance configurations, several of the buildings would be difficult to floodproof and the costs prohibitive. The only item identified that would benefit property owners along Mason Street would be to construct regional basin improvements west of the railroad tracks, which might reduce spills into this area. The SWMM model was also run for existing and proposed conditions assuming that spills over the railroad track would be eliminated by future basin -wide improvements. The resulting 100- year water surface elevation of 5035.16 would inundate only the Salvation Army and Storage Unit area. Building the Motel 6 would raise the 100-year water surface elevation to 5035.51. Only the Salvation Army, Storage Units, and Raynor Garage Door buildings would be inundated under proposed conditions and with basin -wide improvements. Obviously, basin -wide improvements have a significant benefit to the Mason Street area. We hope this provides the information you require at this time. If you have any questions or comments, please feel free to call. Sincerely, Owen Ayres & Associates, Inn Chris Carlson, P.E. Project Manager CC:sp Enclosure HAMM OLT.DOC 34-0754.00 ' Mr. Basil Hamdan ' Page Two October 30, 2000 I Our investigation examined only the 100-year storm event and included the spill hydrograph over the Burlington Northern railroad tracks, which came from the "Burlington Northern Santa Fe Track Raising Study" by MK Centennial (July 2, 1998). The following table indicates the results for each development condition: Condition Basin Area % Impervious 100-Yr. Q cfs Pond Volume ac-ft WSEL w/ 0 cfs out WSEL w/ 10 cfs out Historic 31.41 ac 54.2 218.80 13.14 5034.10 -- Existing 33.49 ac 81.8 280.45 14.79 5035.84 5035.76 Proposed 33.49 ac 1 83.6 1 283.34 1 14.85 1 5036.10 5035.86 Exist. w/o Track Spill 33.49 ac 81.8 257.25 9.30 5035.51 -- Prop. w/o Track Spill 33.49 ac 83.6 260.12 9.36 5035.24 Water surface elevations were evaluated assuming no release from the basin as most conservative and assuming a 10 cfs release through the existing storm sewer. Although the actual storm sewer capacity and hydraulics were not evaluated as part of our investigation, it is evident from.the results that the storm sewer has very little benefit for the 100-year storm event. Changes from the historic and existing conditions are also included in the following table: Condition Impervious Area change) 100-yr Q % Chan e Pond Volume % change) WSEL Chan e ft Existing - Increase 51% 28% 13% 1.74 from historic Proposed - Increase 2% 1 % <1 % 0.26 from existing Previous development in the area increased the 100-year water surface elevation 1.74 feet above the historic conditions. Several buildings were built below this flooding level as a result. Based on the 100-year water surface elevation, the neighboring buildings were investigated for possible flooding. The details are shown on the following page: The west entrance elevation to the Colorado State Parks building is very close (within 0.1 foot) to the 100-year water surface elevation under existing conditions. Since the SWMM model is limited to the accuracy of the available topographic data, this building may or may not be currently flooded. If it isn't flooded, then minimal freeboard exists. As shown above, the proposed Motel 6 site development will increase the 100-year water surface elevation 0.26 feet. With the exception of possibly the State Parks Building, no building that isn't already being inundated will be effected by the development. HAMDI0LT.DOC 34-0754.00 AIRES ASSOCIATES October 30, 2000. Mr. Basil Hamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Re: Mason Street/Motel 6 Drainage Dear Basil, This letter summarizes Ayres Associates investigation to determine the regional drainage effects of the proposed Motel 6 site, which is on the west side of Mason Street just north of the Mason Street and Boardwalk Drive intersection. This letter also addresses the City's comments made on June 30, 2000. Written responses to those comments are included in the Appendix. The area south of Horsetooth Road and north of Troutman Parkway along Mason Street is a closed basin with no appreciable outlet. It is also bordered by the Burlington Northern railroad tracks on the west and College Avenue on the east. Historically, the area has acted as a very large detention pond surrounded by undeveloped parcels. Mason Street was constructed directly through the historic ponding area then commercial construction proceeded on a lot by lot basis until the majority of the pond was filled in. The basin currently exists as a developed and highly impervious closed basin with the exception of the storm sewer in Mason Street. There are a couple remaining open lots, including the proposed Motel 6 lot, which is at the current low point for ponding. The purpose of our investigation was to determine the regional drainage effects of constructing a motel on the previously mentioned lot. This work included determining the expected rise in water surface elevation, loss of available pond volume, effects on adjacent properties, and whether mitigation would be possible. Unfortunately for the property owner, they are the last property to develop on the west side of Mason Street and thereby have a proportionately higher impact on flood elevations than had they been first. We surveyed what was reasonably available and use aerial ortho-photo maps .to provide the remaining topographic information. Entrance elevations were also taken at neighboring buildings. The analysis was performed using UDSWMM and was completed in accordance with the City of Fort Collins Storm Drainage Design Criteria as revised in January 1997. Five development conditions were investigated: • Historic conditions (before development of the area) • Existing conditions • Proposed conditions (existing conditions plus the proposed Motel 6) • Existing conditions without track spill • Proposed conditions without track spill Owen Ayres & Associates, Inc. Engineers/Scientists/Surveyors 3665 JFK Parkway, Building 2, Suite 200, P.O. Box 270460, Fort Collins, CO 80527 HAMD10LT.DOC (970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-5578 34-0754.00 Printed on recycled paper