HomeMy WebLinkAboutMASON STREET MOTEL - PDP/FDP - 7-98 - CORRESPONDENCE - (4)The Planning Objectives indicate that the property will be replatted from two existing lots into one lot. Please submit a plat for review. M. Due to the significant Stormwater and Natural Resource Department comments, the applicant's request for a combined PDP/Final has been denied. The development application is currently being processed as a PDP application only. 10. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 11. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 12. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please provide a written response to each of -the above stated comments with the submittal of plan revisions. A hearing date will be assigned once all comments have been addressed and revisions have been reviewed. - Please contact me at 221-6206 if you have any questions or concerns related to these comments. Sincerely, Michael Ludwig, AICP City Planner xc: Mike Dean, Engineering Stormwater Current Planning File #7-98 r C. Section 10.507.7(h) of the Fire Code states that an automatic sprinkler system shall be installed throughout hotels three or more stories in height or containing 20 or more guest rooms. d. An automatic fire alarm system is required. e. A knox box is to be mounted in an accessible location on each commercial building that is equipped with a required fire sprinkler system or fire alarm system. Chlorine storage shall be in accordance with Article 80 of the Uniform Fire Code. 3. Public Service Company will need to extend a gas main along Mason Street in the middle of the easement. No trees are to be planted within 4 feet of the gas line. 4. The Zoning Department offers the following comments: a. The property is not located within the residential neighborhood sign district. Therefore sign locations do not need to be shown on the building elevations. All signage must be in accordance with the City Sign Code. b. A minimum 6% interior parking lot landscaping must be provided. C. Please provide dimensions for the distances from the property line(s) to the building envelope. 5. The Water Conservation Specialist requests that the applicant note that the species "Narrowleaf Cottonwood" has been grown for 10 years at the City's Xeriscape Demonstration Garden and has caused a terrible suckering problem. The maintenance time to keep the suckers out has outweighed the value of the tree. They were planted as an experiment in our area and are not recommended for use on this project. 6. The Light and Power Utility offers the following comments: a. A streetlight is planned on Mason Street at the north property line. Street trees need to maintain minimum clearances to street lights (20 feet if tree is an ornamental species, 40 feet if a shade tree). b. The developer needs to coordinate the transformer location, power requirements, and electric development charges with the Light and Power Engineering Department. a PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 29, 1998 TO: Trans Ping PROJECT: #7-98 Mason Street Motel (South College Investments Subdivision) - Type I (4V.0 PDP/FC All comments must -be received by Mike Ludwig no later than °the staff review meeting:. - Wednesday, February 25,1998 OV (rVASI�v 'A.U.6i 46 � "Lcol_� iv Date: OM HERE 7 YOU WISH TO RECEIVE COPIES OF REVISIONS _ P) Sid _ Ok _Rk —Rcdhm Ul ft City of Fort Collins PROJECT COMMENT SHEET DATE: January 29, 1998 DEPT: Water & Wastewater PROJECT: #7-98 Mason Street Motel (South College Investments Subdivision) - Type I (LUC) PDP/FC All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, February 25, 1998 -Include the standard water service and thrust block details with the next submittal. -Include the standard general notes on the overall utility plans. -In order to use existing 2 inch water service, a curb stop must be set a maximum of 2 feet from the proposed meter pit and the valve box in the street must be removed. -Will proposed location of the meter pit create a conflict with other utilities? Show location of gas and electric. -See utility, site and landscape plans for other comments. r Date: � , Signature: CHECK HERE IF YOU WISH. TO RECEIVE COPIES OF REVISIONS 0 ' _& PLAT SITE _DRAINAGE REPORT _OTHER �X UTILITY REDLINE UTILITY CLLANDSCAPE City of Fort Collins RESPONSE: 9. Please show a profile view of the proposed storm sewer system. Calculate the capacity of the storm sewer system and show that the system has adequate capacity for onsite as well as offsite flows routed through the storm system. RESPONSE: 10. Please show all easements on the plan and provide a plat for the site. RESPONSE: 11. Show the existing wetland area to remain on the plan, indicate it as a sensitive area where no traffic or construction material is to be placed. Also, how is the remaining existing wetland in the northwest corner of the site going to be protected during construction? It could completely silt in before the project is complete. Please address this issue. RESPONSE: 12. The erosion control report should contain a better description of the erosion/sediment control plan including reference to the wetland to be retained, how this is to be done during construction. This note should be included on the plan. RESPONSE: Please see the redlined plan and report for additional review comments. 2. A large portion of the site consists of an existing wetland area. Please delineate the existing wetland boundaries. The site may be subject to local, state, and federal wetland regulations. The proposed disturbance to the wetlands must comply with Section 3.4 of the City of Fort Collins Land Use Code. Specifically, Section 3.4.1(M) states that, "..the developer shall provide to the City a written statement from the U.S. Army Corps of Engineers that the development plan fully complies with all federal wetland regulations as established in the federal Clean Water Act." Also, Section 3.4.1M states, "The developer shall also provide to the City written statements from such other governmental agencies having jurisdiction and which have been identified in writing by the Director,..". 3. The site currently serves as a detention area for the overflow from the west. If this site were to be filled, the flooding of properties adjacent and downstream of this site would increase because of the removal of the detention area. The development of the site must be shown to cause no increase in flooding to off -site properties. 4. Runoff from the south portion of the site appears to be conveyed directly to the Mason Street storm drain undetained. Please calculate the amount of undetained runoff and ensure that a maximum of .5 cfs/acre is being released from the site. RESPONSE: 5. Please delineate drainage basins for the site and provide design points to show where flow will concentrate. Provide a flow summary table on the drainage plan. RESPONSE: 6. Please show more detail of the proposed extension of the 15 inch RCP storm sewer in the northeast corner of the site. Show how the proposed pipe will tie in with the existing pipe. RESPONSE: 7. Provide temporary inlet protection at the two area inlets and also at the inlet of the 75 foot 15-inch RCP in the northwest comer of the site. RESPONSE: 8. Please delineate the offsite basins that contribute flow to the site. Calculate the amount of offsite flow that drains to the storm pipes at the northeast and northwest corners of the site. Also, calculate the amount of flow that will be conveyed by the swale on the south side of the site. Show calculations for the capacity of the swale. r PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 29, 1998 TO: Stormwater PROJECT: #7-98 Mason Street Motel (South College Investments Subdivision) - Type I (LUC) PDP/FC All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, February 25,1998 Note: The Stormwater Dept. has significant concerns with the proposed development. The major concerns are related to the off -site flows from the west and the disturbance to the wetlands. Comments 1 and 2 need considerable attention and should be addressed before resubmitting. The project could potentially be delayed in order to resolve these issues. The remainder of the comments are related to the on -site design. Additional comments may arise once more information is provided. 1. The site is proposed within an area of known flooding due to floodwaters from the west overtopping the Burlington Northern Railroad. The site is subject to the conditions of Section 3.3.3 of the Land Use Code because of the existing water hazards of the site. It is the responsibility of this development to comply with the applicable sections of the Land Use Code._ . A master plan update may be needed to further quantify the problem and to identify potential solutions to the problem. Date: 3_ )-- Cffa HERE 1F YOU WISH TO RECENE COPIES OF REVISIONS _ PW _ Site _ Report _ Odff _ U4 _Refix _ f c ; 5 Aer; Ivan IpFf tn; kP Lvda! she wQ,.tt City of Fort Collins REVISION COMMENT SHEET DATE: January 29, 1998 DEPT: Engineering PROJECT: #7-98 Mason Street Motel (S. College Investments Subdivision) - Type I (LUC) PDP/FC PLANNER: Mike Ludwig ENGINEER: Michael Dean All comments must be received no later than the staff review meeting: Wednesday, February 25, 1998 Make corrections to the Deed of Dedication For Easement, provide an exhibit, and show and note on the Overall Utility Plan. Provide elevations and details of drive intersection in accordance with D-19. Make corrections to the General Notes as noted on the redlines. Provide a 12' Public Access Easement for future connection with BNRR Transportation Corridor. ** See redline plans for additional comments ** Date:_ -/2y /98 Signature: -Tr " Please send copies of marked revisions ,.-4iat Site �tility �andscape City of Fort Collins Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.3 be designed so that precipitation runoff flowing from the site is treated in accordance with the criteria set forth in the Storm Drainage Design Criteria and Construction Standards. Treatment measures may include, but shall not be limited to: minimization of impervious surfaces runoff spreaders infiltration devicesextended detention constructed wetlands sand filters water quality inlets 3.4.4 Noise and Vibration The proposed land uses and activities shall be conducted so that any noise generated on the property will not exceed the maximum noise levels as specified in the city's Noise Control Ordinance (Chapter 20, Article 2 of the City Code), and so that any vibration created by the use of the property will be imperceptible without instruments at any point along the property line. Noise generated by emergency vehicles and airplanes shall be exempted from the requirements of this provision. 3.4.5 Hazardous Materials (A) Purpose. The purpose of this Section is to protect the community and neighborhood from potential harm caused directly or indirectly by hazardous materials. The proper location, construction and processing of hazardous materials facilities are important to controlling community risk. If the type and magnitude of hazardous materials emergencies can be predicted, the potential impact on adjacent land uses, emergency providers and the environment can be minimized. (B) General Standard If any use on the development site may entail the use or storage of hazardous materials (including hazardous wastes) on -site, the project shall be designed to comply with all safety, fire and building codes for the use and storage of the hazardous materials involved. Adequate precautions shall be taken to protect against negative off -site impacts of a hazardous materials release, using the best available technology. Article 3, Page 68 Supp. I Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(L) �. (L) Standards for Protection During Construction. (1) Designation. LODs and natural area buffer zones as approved by the Director shall be shown on the final plan for development. LODs and natural area buffer zones shall be designated in the field prior to commencement of excavation, grading or construction with fencing or other methods approved by the Director. (2) Barrier Fencing. Construction barrier fencing shall be provided at the limits of development during construction. For the protection of trees and clumps of trees to be preserved within a natural area buffer zone that is to be disturbed, tree protection specifications as described in subsection 3.2.1(G)(1) and (3) through (7) shall be followed. (M) Proof of Compliance. (1) If a proposed development will disturb an existing wetland, the developer shall provide to the city a written statement from the U.S. Army Corps of Engineers that the development plan fully complies with all applicable federal wetland regulations as established in the federal Clean Water Act. (2) The developer shall also provide to the city written statements from such other governmental agencies having jurisdiction, and which have been identified in writing by the Director, that the development plan fully complies with all applicable state (including county) and federal environmental regulations. Such written statements shall be provided to the Director prior to the scheduling of the hearing for the project development plan. 3.4.2 . Air -Quality -- The project shall conform to all applicable local, state and federal air quality regulations and standards, including, but not limited to those regulating odor, dust, fumes or gases which are noxious, toxic or corrosive, and suspended solid or liquid particles. 3.4.3 Water Quality The development shall comply with all applicable local, state and federal water quality standards, including, but not limited to, those regulating erosion and sedimentation, storm drainage and runoff control, solid wastes, and hazardous substances. Projects shall Article 3, Page 67 Supp. I Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(1) Stormwater Utility for design and construction and shall, to the maximum extent feasible, utilize nonstructural control techniques, including but not limited to: (1) limitation of land disturbance and grading; (2) maintenance of vegetated buffers and natural vegetation; (3) minimization of impervious surfaces; (4) use of terraces, contoured landscapes, runoff spreaders, grass or rock -lined waterways; (5) use of infiltration devices; (6) use of recharge basins, seepage pits, dry wells, seepage beds or ditches, porous pavement or Dutch drains. (J) Water Rights. To the extent that a development plan proposes the creation of water features such lakes, ponds, streams or wetlands, the plan must include clear and convincing evidence that such water features will be supplied with sufficient water whether by natural means or by the provision of sufficient appropriative water rights. No development plan shall be approved which would have the effect of injuring or diminishing any legally established water supply for any natural area. (K) Access to Natural Areas. In the event that the development plan contains or abuts a publicly owned natural area, the development plan shall include such easements and rights -of -way as are necessary to allow reasonable access for the public to such natural area, unless such access is deemed by the Director to be unnecessary and undesirable for the proper public utilization of the natural area. Any such access requirement or dedication shall be credited (based upon a fair market value analysis) against any open space dedication or fee -in -lieu thereof required by the city. If the development site contains any privately owned natural area, any access provided to such area, whether for private or public use, shall be designed and managed in such manner as to minimize the disturbance of existing wildlife using such area. Article 3, Page 66 Supp. I Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(F) (2) Streambank Stabilization. When the Stormwater Master Plans and the Storm Drainage Design Criteria and Construction Standards of the city require streambank stabilization, native vegetation shall be utilized for such purpose, and engineered stabilization techniques such as exposed rip rap shall be avoided, to the maximum extent feasible. The use of native vegetation shall be the principal means of streambank stabilization, and the use of rip -rap for streambank stabilization shall be restricted to locations where the use of vegetation techniques is not reasonably feasible. (G) Ridgeline Protection. (1) Ridgeline Setback So that structures blend more naturally into the landscape, rather than being a prominent focal point, no development shall intrude into any ridgeline protection area identified and designated by the Director during the development review process in conjunction with the establishment of the LOD and the natural area's buffer zone. For the purposes. of this subsection, a designated ridgeline protection area shall include the crest of any hill or slope so designated, plus the land located within one hundred (100) horizontal feet (plan view) on either side of the crest of the hill or slope. . (2) Building Height and Profile. Multi -level buildings shall follow the general slope of the site in order to keep the building height and profile in scale with surrounding natural features. (H) Design and Aesthetics. Projects in the vicinity of large natural areas and/or natural area corridors, including, but not limited to, the Poudre River Corridor and the Spring Creek Corridor, shall be designed to complement the visual context of the natural area. Techniques such as ---- architectural design, site design, the use of native landscaping and choice of colors and building materials shall be utilized in such manner that scenic views across or through the site are protected, and manmade facilities are screened from off -site observers and blend with the natural visual character of the area. (I) Stormwater Drainage/Erosion Control. All stormwater drainage and erosion control plans shall meet the standards adopted by the city Article 3, Page 65 Supp. 1 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(F) 01 natural area or in the adjacent natural area buffer zone which is of importance to the use or survival of any such species shall not be disturbed or diminished and, to the maximum extent feasible, such habitat shall be enhanced. (4) Connections. If the development site contains existing natural areas that connect to other off -site natural areas, to the maximum extent feasible the development plan shall preserve such natural area connections. If natural areas lie adjacent to (meaning in the region immediately round about) the development site, but such natural areas are not presently connected across the development site, then the development plan shall, to the extent reasonably, feasible, provide such connection. Such connections shall be designed and constructed to allow for the continuance of existing wildlife movement between natural areas and to enhance the opportunity for the establishment of new connections between natural areas for the movement of wildlife. (5) Wildlife Conflicts. If wildlife that may create conflicts for the future occupants of the development (including, but not limited to, prairie dogs, beaver, deer and rattlesnakes) are known to exist in areas adjacent to or on the development site, then the development plan must, to the extent reasonably feasible, include provisions such as barriers, protection mechanisms for , landscaping and other site features to minimize conflicts that might otherwise exist between such wildlife and the developed portion of the site. (F) Lakes/Riparian Area Protection. (1) Lakes, Reservoirs and Ponds. If the development site contains a lake, reservoir or pond, the development plan shall include such enhancements and restoration as are necessary to provide reasonable wildlife habitat and improve aesthetic quality in areas of shoreline transition and areas subject to wave erosion. The development plan shall also include a design that requires uniform and ecologically and aesthetically compatible treatment among the lots or tracts surrounding a lake, reservoir or pond with regard to the establishment of erosion control protection and shoreline landscaping on or adjacent to such lots or tracts. Water bodies and features such as reflecting pools and lagoons constructed as new landscaping features of a development project shall be exempt from the standards contained in this 1 subparagraph. _ J Supp. I Article 3, Page 64 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(D) �_.------------- (c) The Director may allow disturbance or construction activity within the natural area buffer zone for the following limited purposes: 1. mitigation of development activities; 2. restoration of previously disturbed or degraded areas; 3. emergency public safety activities and utility installations when such activities and installations cannot reasonably be contained within the LOD or other nearby areas of development; 4. construction of a trail or pedestrian walkway that will provide public access for educational or recreational purposes when such trail or walkway cannot reasonably be contained within the LOD or other nearby areas of development. (E) Protection of Wildlife Habitat and Ecological Character. (1) Construction Timing. Construction shall be organized and timed to minimize disturbance of Sensitive or Specially Valued Species occupying or using on -site and adjacent natural areas. (2) Prairie Dog Removal. Before the commencement of construction on the development site, any prairie dogs inhabiting portions of the site within the limits of development shall be relocated or humanely eradicated by the developer by city approved methods as set forth in Chapter 4 of the City Code, and when applicable, as reviewed and approved by the Colorado Division of Wildlife. (3) Sensitive or Specially Valued Species. If the development site contains or is within five hundred (500) feet of a natural area, and the ecological characterization report required pursuant to subsection (C)(3).above shows the existence in such natural area of a plant or wildlife species identified by the city as a Sensitive or Specially Valued Species, or by state or federal agencies as "threatened" or "endangered," then the development plan shall include provisions to ensure that any habitat contained in any such Article 3, Page 63 Supp. 1 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(D) 1 (2) 3. emergency public safety activities and utility installations when such activities and installations cannot reasonably be contained within the LOD or other nearby developed areas; 4. construction.of a trail or pedestrian walkway that will provide public access for educational or recreational purposes when such trails or walkways cannot reasonably be contained within the LOD or other nearby developed areas; 5. the enhancement of the habitat values and/or other • natural resource values of a natural area. Natural Area Buffer Zone. (a) No disturbance shall occur within any natural area's buffer zone and no person shall engage in any activity that will disturb, remove, fill, dredge, clear, destroy or alter any area, including vegetation within natural areas including without limitation lakes, ponds, stream corridors and wetlands, except as provided in subsection (c) below. l (b) If the development causes any disturbance within the 1 natural area buffer zone, whether by approval of the Director or otherwise, the applicant shall undertake restoration and mitigation measures within the natural area buffer zone such as regrading and/or the replanting of native vegetation. The applicant shall undertake mitigation measures to restore any damaged or lost natural resource either on or off site at the discretion of the Director. Any such mitigation or restoration shall be roughly equivalent to the loss suffered by the community because of the disturbance, and shall be based on such mitigation and restoration plans and reports as have been requested, reviewed and approved by the Director. Unless otherwise authorized by the Director, if existing vegetation (whether native or non-native) is destroyed or disturbed, such vegetation shall be replaced with native vegetation and landscaping. Article 3, Page 62 D Supp. I Inn Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(C) (d) the pattern, species and location of any significant native trees and other native site vegetation; (e) the bank, shoreline and high water mark of any perennial stream or body of water on the site; (f) areas inhabited by or frequently utilized by Sensitive and Specially Valued Species; (g) special Habitat Features; (h) wildlife movement corridors; and (i) the general ecological functions provided by the site and its features. (D) Development Standards and Guidelines. (1)1 Limits of Development. JPVJrS; oL, (a) No construction tivi 'ty, including, without limitation, grading, excava on or stockpiling of fill material shall be permitted witlhn the limits of development, whether to provide for a building site, on -site utilities or services, or for any roads or driveways prior to the approval by the Stormwater Utility of the erosion and sedimentation control plan for the development. (b) To the maximum extent feasible, no development, grading or vegetation removal or alteration shall occur as a part of the development project or associated construction activity outside the LOD except as provided in subsection (c) below.. _.. ._ _ ......... . (c) The Director may allow disturbance or construction activity outside the LOD for the following limited purposes: 1. mitigation of development activities; 2. restoration of previously disturbed or degraded areas; Article 3, Page 61 Supp. 1 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(C) included on the Natural Areas Inventory map; key areas for rare, migrant or resident butterflies as identified in the NAPP; areas of high terrestrial or aquatic insect diversity as identified in the NAPP; remnant native prairie habitat; mixed foothill shrubland; foothill ponderosa pine forest; plains cottonwood riparian woodlands; and any wetland greater than one -quarter ('/.) acre in size. (g) the character of the proposed development in terms of use, density, traffic generation, quality of runoff water, noise, lighting and similar potential development impacts. (h) site topography, including but not limited to such characteristics as steepness of slopes, existing drainage features, rock outcroppings, river and stream terraces, valley walls, ridgelines and scenic topographic features. (3) Ecological Characterization. If the development site contains or is within five hundred (500) feet of a natural area, or if it is determined by the Director, upon information or from inspection, that the site likely includes areas with wildlife, plant life and/or other natural characteristics in need of protection, and if the city does not then possess the information required by this subsection to establish the LOD or the natural area buffer zone or to apply review standards set forth below, then the developer shall provide to the city a report prepared by a professional qualified in the areas of ecology, wildlife biology or other relevant discipline that describes, without limitation, the following: (a) the wildlife use of the natural area showing the species of wildlife using the area, the times or seasons that the area is used by those species and the "value" (meaning feeding, watering, cover, nesting, roosting, perching) that the area provides for such wildlife species; (b) _ the boundary of wetlands in the area, as determined in establishing the LOD, and a description of the ecological functions and characteristics provided by those wetlands; (c) any prominent views from or across the site; Article 3, Page 60 Supp. 1 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1(C) �. (2) Establishment of Natural Area Buffer Zones. The natural area buffer zone shall range from one hundred (100) feet to three hundred 300 feet from any identified natural area No development shall occur in the natural area buffer zone except for the purposes and under the circumstances set forth in this Section; provided however, that when justified by ecological data and/or studies, or when there exists the potential for a substantial adverse impact to Sensitive or Specially Valued Species, or when strict application of this subsection will impose an exceptional and undue hardship upon the property owner or developer, the Director may increase or decrease the buffer zone requirement as reasonably appropriate under such circumstances. In establishing the natural area buffer zone(s), which may be multiple and noncontiguous on a site, the Director shall consider and apply the following criteria: (a) the foreseeable impacts of developmenton the wildlife usage or ecological character or function of the natural area. (b) the ecological and wildlife use characterization of the natural area. (c) the existence of wildlife movement corridors. (d) the extent of floodplains and floodways. (e) the type, amount and extent of existing vegetation on the site. (f) the existence of special habitat features such as key raptor habitat features, including nest sites, night roosts and key feeding areas as identified by the Colorado. Division of..... Wildlife or in the Fort Collins Natural Areas Policy Plan (NAPP); key production areas, wintering areas and migratory feeding areas for waterfowl; key use areas for wading birds and shorebirds; key use areas for migrant songbirds; key nesting areas for grassland birds; fox and coyote dens; mule deer winter . concentration areas as identified by the Colorado Division of Wildlife or NAPP; prairie dog colonies over fifty (50) acres in size as Article 3, Page 59 Supp. 1 W Division 3.4, Environmental, Natural, and Cultural Standards VPP Section 3.4.1(C) (c) In establishing the LOD, the following shall also be taken into account: ' 1. visual impacts, including but not limited to ridgeline protection areas and protection of scenic views. 2. erosion prevention and control, including but not limited to protection of natural drainage channels and compliance with an approved stormwater drainage management plan. 3. preservation of significant native trees and other native site vegetation, including protection of natural area buffers zones. 4. conservation of water, including but not limited to preservation of existing native vegetation, reduction in amounts of irrigated areas and similar considerations. 5. stream corridor and wetland protection and buffering. 6. site topography, including but not limited, to such" characteristics as steepness of slopes, existing drainage features, rock outcroppings, river and stream terraces, valley walls, ridgelines and scenic topographic features. 7. floodplains and floodways. 8. wildlife movement corridors. 9. natural area buffer zones as delineated below. 10. the practical needs of approved construction activity in terms of ingress and egress to the developed project and necessary staging and operational areas. D SupP. 1 Article 3, Page 58 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4./(C) shall be contained. In establishing the LOD, which may be multiple and noncontiguous on a site, the Director shall consider and apply the following criteria: (a) If any portion of the development site is identified as a natural area or feature on the city's Natural Areas Inventory Map, the ecological and wildlife use characterization of such identified areas shall be taken into account and protected through the establishment of the LOD. (The boundary of any natural area shown on _ the Natural Areas Inventory Man is only anuroximate. The actual boundary of any natural area to be shown on a project development plan shall be proposed by the applicant, and established by the Director through site evaluations and reconnaissance, and shall be based on the ecological characterization of the natural area in conjunction with the man.1 The Director may also require to be shown as natural areas on the project development plan, any areas not currently included on the Natural Areas Inventory Map, but possessing such characteristics (e.g., wetlands, riparian areas or foothills forest) as would have supported their inclusion on the Natural Areas Inventory Map, if such areas are discovered during site evaluation and/or reconnaissance associated with the development review process. (b) In establishing the boundaries of a wetland, the applicant and the Director shall use soil samples, ecological characterization and hydrological evidence, to the extent that such are in existence, and/or are requested of and provided by the applicant. The Director may also utilize the standards and guidelines and/or the professional recommendations of the U.S. Army Corps of Engineers, . . the U.S. Fish and Wildlife Service and/or the Colorado Division of Wildlife in establishing such boundaries. In no instance shall the boundary of a wetland be defined as less inclusive than that which would be included in the wetland according to the standards and guidelines in use by the U. S. Army Corps of Engineers at the time of development review. t Supp. / Article 3, Page 57 Division 3.4, Environmental, Natural, and Cultural Standards Section 3.4.1 DIVISION 3.4 ENVIRONMENTAL, NATURAL AREA, RECREATIONAL AND CULTURAL RESOURCE PROTECTION STANDARDS Sections: 3.4.1 Natural Areas and Features 3.4.2 Air Quality 3.4.3 Water Quality 3.4.4 Noise and Vibration 3.4.5 Hazardous Materials 3.4.6 Glare or Heat 3.4.7 Historic and Cultural Resources 3.4.8 Parks and Trails 3.4.1 Natural Areas and Features (A) Purpose. The purpose of this Section is to ensure that when property is developed consistent with its zoning designation, the way in which the proposed physical elements of the development plan are designed and arranged on the site will protect the natural areas and features both on the site and in the vicinity of the site. (B) General Standard. To the maximum extent feasible, the development plan shall be designed and arranged to ensure that no disturbance shall occur to any natural area as a result of the development, and that impacts and disturbance to natural areas and the plants and wildlife inhabiting those areas shall be minimized through the use of natural area buffer zones. If any development generates a disturbance to a natural area or to a natural feature located in a natural area, the development project shall restore to the community such lost natural resource either on or off the site. Any such restoration or replacement shall be roughly equivalent to the loss suffered by the community because of the disturbance. (C) Establishment of Limits of Development and Natural Area Buffer Zone& For every development subject to this Division, the applicant shall propose, and the Director shall establish on the project development plan, a "limits of development' ("LOD") line(s) and a natural area buffer zone(s) according to the criteria set forth below. (l) Establishment of Limits of Development. The LOD shall indicate the specific area(s) of a site within which the developed project may be constructed and within which the development activity Article 3, Page 56 Supp. I N e. Pedestrian lighting for the off-street walkway on the north side of the building is needed as per Section 3.2.2[C][5][3] of the Land Use Code. f. A 12 foot wide easement is required along the south property boundary for future pedestrian access to the Burlington Northern Railroad tracks. The Transportation Master Plan designates these tracks as a Transit Corridor and expected to be used as such within 8 to 10 years. Please refer to Sections 3.2.2[C][6]; 3.3.1 [C][2]; 3.6.1 [B]; and 3.6.2[J][4] of the Land Use Code. g. The proposed site lighting will need to be revised. Lighting levels on the south, east and west elevations appears to be 2 to 5 times the recommended lighting levels. The average lighting level of the main lot is more than 2 times the recommended lighting levels. Pedestrian scale lighting for the walk on the north side of the building appears to be less than recommended lighting levels. There are at least three points where lighting levels exceed the maximum allowable 10 foot candles. General note number 2 on the Site Plan states that lighting levels will fall off to zero at the property lines. This is not true based upon the proposed lighting plan. According to the Land Use Code lighting levels (generated by on site lighting) cannot exceed 0.1 foot candle at any point 20 feet beyond the property line. Please refer to Sections 3.2.2[D][3][e]; 3.2.4[C]; 3.2.4[D[5]; 3.2.4[D][7]; and 3.2.4[D][8] of the Land Use Code regarding these comments. h. Please verify that the building will not cast a shadow greater than a hypothetical 25 foot wall placed on any property line as outlined in Section 3.2.3[D][1] of the Land Use Code. Please provide color chips/samples of the building materials and clarify the building materials and colors on the building elevations. Please refer to Section 3.5.1 [G] of the Land Use Code. j. Please show the location of all proposed utility meters, transformers and HVAC equipment on the building elevations and/or Site Plan and' Landscape Plans. These items must be the screened as using appropriate colors similar to the building and/or landscaping. Please refer to section 3.5.1 [J][2] of the Land Use Code. k. Section 3.5.1 [J][5] of the Land Use Code requires rooftop mechanical equipment to be fully screened. It does not appear that the equipment is adequately screened on the east and west building elevations. The proposed parapet system does not appear to relate well with the remaining architectural elements of the building. Y 7. The Building Inspections Department offers the following comments: a. The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix Section 3106. A designated and marked "accessible route of travel' among all the buildings on the site an the public way (public sidewalk) is shown on the plan. Accessible routes shall comply with ANSI Al 17.1-1992 with running slopes no greater than 1:20 and cross slopes no steeper than 1:50. Where routes cross lanes for vehicle traffic, they shall be designated and marked as a cross walk. Provide parking and signs per Appendix Section 3107. Parking. and access aisles shall comply with ANSI A117.1-1992 with slopes no greater than 1:50 in any direction. b. The motel building shall be designed to comply with the Fort Collins Residential Energy Code (MEC 95 with local amendments). C. The City is currently reviewing the 1997 editions of the Uniform codes for adoption. The process is slated for completion in April. Please contact the Building Inspections office for current code editions and standards. CThe Natural Resources Department stated that there are wetland issues which must be addressed on this site. Has the developer received confirmation from the Army Corps of Engineers that it is O.K. to fill the wetlands (since they exceed more than 1/3 acre)? Since not allowing disturbance or the filling of the wetland would possibly over restrict the use of the property, the City of Fort Collins will entertain and consider any proposals to modify the existing wetlands if such disturbance is shown by the developer to be acceptable to the U.S. Army Corps of Engineers, and if such disturbance is offset by off -site mitigation as set forth in Section 3.4.1 of the Land Use Code (see attached). 9. The Current Planning Department offers the following comments: a. Trees are needed adjacent to the north and west sides of the building as per Section 3.2.1 [D][1 ][c] of the Land Use Code. b. The Planning Objectives state thatl5% interior parking lot landscaping is _- provided. Please verify this calculation/statement a modify the plan as necessary. A minimum 6% interior parking lot landscaping is required as per Sections 3.2:1 [D][1 ][a]; 3.2.1 [E][5]; and 3.2.2[M][1 ] of the Land Use Code. C. Foundation plantings/shrubs are needed along the south, east and west building elevations as per Section 3.2.1 [E][2][d] of the Land Use Code. d. Site amenities such as benches are required as per Section 3.2.2[C][3] of the Land Use Code. Comm._ -ry Planning and Environmental , _rvices Current Planning City of Fort Collins March 3, 1998 Ric Hattman Hattman Associates 145 W. Swallow Fort Collins, CO 80525 Dear Ric: Staff has reviewed your documents for the Mason Street Motel PDP/Final which were submitted on January 28, 1998 and offers the following comments: U S WEST stated the following: a. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. U S WEST will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. b. The owner is responsible for provision of all conduit, ditch crossings, and street crossings for telephone facilities within the project. The owner also provides terminal room space (usually 8' x 4') and power for the telephone terminal. Contact the U S WEST engineer for conduit specifications for the telephone entrance cable. C. All relocation of existing telephone facilities required by these plans will be paid for by the developer. 2. The Poudre Fire Authority offers the following comments: a. Fire apparatus access roads shall be provided for every facility, building, or portion of building hereafter constructed when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility or the building must be equipped with an automated fire suppression system. b. Each fire hydrant must be capable of delivering 1000 gallons of water per minute as a residual pressure of 20 pounds. No commercial building can be greater than 300 feet from a fire hydrant. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020