City of Fort Collins
March 10, 1998
Ric Hattman
Hattman Associates
145 W. Swallow
Fort Collins, CO 80525
T XED
3/10AS
Ric,
The following comments were received from the City Forester: -
1. The City Forester suggests that species changes be made for the Lanceleaf
Cottonwood (gets huge); the Narrowleaf Cottonwood (serious problem with root
suckers); and the Laurel Leaf Willow.
= -2. Per. Section 3.2.1[E][2][d]-of the Land Use.Code, foundation plantings are
required along high use/Visibility walls. Please add foundation plantings along
the east wall of the building.
4.
Per Section 3.2.1 [D][2] of.the Land Use Code, street trees.should be located in
the parkway between the sidewalk and curb. The parkway width must be 7.5
feet wide on collectors based on the new street standards. Lawn should be
noted in the parkway strip.
rJUjAt_K
Cottonwood is not an approved street tree species (see two "street trees north of
the southeast property comer).
5. Please add the following sentence to Landscape Note #6: "Tree/utility
separation requirements shall not be used as a means of avoiding the
planting of street trees as per Section 3.2.1 [K] of the Land Use Code."
Please contact me at 221-6206 if you have any questions or concerns related to these
comments.
Sincerely,
Michael Ludwig, A CP
City Planner
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
k. ROOF TOP UNITS — No roof top units exist. What is visible are wall
louvers that are painted to match the adjacent wall elements. The
Elevations have been revised to clarify these elements.
1. PLAT — There was a communication error between the Engineers,
Owner, and myself. There is not a requirement for replatting of the
property so no replat is provided. The Planning Objectives are not
correct in this area.
M. PDP — It is understood that this submission is for a PDP.
10. Engineering comments are addressed by the Civil Engineer.
11. Storm Drainage comments are addressed in new engineering reports.
12. Water and Wastewater comments are addressed by the Civil Engineer.
13. Transportation comments call for the revision of the Context Plan, which are
provided. The changes requested for the Transportation Study were reviewed and
addressed separately by Eugene Cappola and separately and directly returned to
the Transportation Department.
Thank you for your time in reviewing these plans. We hope that we have
addressed all of your comments to your satisfaction and that we can work to moving the
project forward at this time.
Sincerely;
Fredric Hattman
on the Land Use Schedule and indicates that Landscaping within the
parking lots totals at least 6.9% of the parking area.
C. FOUNDATION PLANTING — With the additional area of land
between the building and the adjacent sidewalks as required above in
item a., space was provided and landscaping in the form of shrubs,
ground covers, and flowering plants as required by the code.
d. SITE AMENITIES — Benches have been added along the pedestrian
spine that connects the building with the public sidewalk and the future
multi -modal corridor to be constructed to the west of the property.
Along with the benches Ballard lights have been added to this walkway
to provide illumination at a pedestrian scale during the evenings.
e. PEDESTRIAN LIGHTING — Ballard lights have been added to
illuminate the sidewalk on the north side of the building.
f. MULTI -MODAL PATH — The developer is providing a direct
connection from the future multi -modal corridor and the public street.
This pathway is one and the same with the sidewalk system provided for
the building. This walkway will be maintained and installed with the
project rather than in the future. We believe that it is better to have one
path for the ease of use by the patrons of the side who will most
probably be unfamiliar with Ft. Collins and the system. We believe that
it is safer for both patrons and those passing through the property to use
the one path especially in this litigation happy society, Corporate Names
are easy targets and legal councils warns against a dual system that may
not be able to be monitored by the staff as well. The plus we see for one
pathway is that the amenities and the lighting that we are providing in
the previous comments can be better utilized by all. The code calls for
the connection. We are providing but are not placing it within a
dedicated easement because it serves the property as well. I believe that
the code wording of this item has been revised changing the
requirements for this multi -modal corridor.
g. SITE LIGHTING — The site lighting has been revised to meet the
current lighting requirements of the City.
h. BUILDING SHADOW — A shadow study is provided demonstrating
the extent of the shadows at eight o'clock in the morning, noon, and
four o'clock in the afternoon and at the equinoxes and solstices.
i. COLORS — A color board is provided with this submittal.
j. MECHANICAL COMPONENTS — The location of the electrical
transformer, gas meter, and electrical cabinet one the site plan. All of
these elements are blocked from view of the public R.O.W. by the
building. The air handing units for the building are located in the attic
space and are concealed from view. This is the same for mechanical
flues. Individual mechanical units for the rooms are interior to the space
and have wall louvers. A continuous lattice that runs vertical as an
element where these items are stacked in elevation screens these wall
louvers.
3. BUILDING INSPECTION
a. ACCESSIBLITY — The property will meet the grading criteria as
determined by the UBC and the ANSI codes definition for accessibility.
The accessible routes have been verified. Marking by signage as per the
code is only required if all routes from the building are not accessible.
b. ENERGY CODE — The building will conform to the Ft. Collins
Residential Energy Code as noted.
C. BUILDING CODE — The building will be constructed to the current
adopted UBC codes with City modifications as well as the Current
NEC.
4. NATURAL RESOURCES
a. WETLANDS — The Corps of Engineers has reviewed the Site Plan and
the Landscape Plan, reviewed the Wetlands Study, and visited the site.
Their letter of approval to develop the site in accordance to the plans as
submitted was formally granted when we submitted the plans for
review. I am including copies of our approval letter. I have renewed our
correspondence regarding our plans since the original approval has
expired. Their initial approval notes that they do not determine this area
to be of major significance. We are providing areas of mitigation on site
and are limiting the total area of filling to approximately 0.7 acres while
maintaining and reestablishing 0.2 acres as wetlands. Currently 0.2
acres of the property is not part of the wetlands area. The existence of
wetlands type ecology is not deputed with this application. What we are
noting is that significant areas of this wetland have been filled by all of
the adjacent property owners as well as the City of Fort Collins in
constructing Mason Street through this area. The only portion of the
wetlands remaining is on this property —The sources of the water are
now off site flows from streets, development and parking areas. The
quality if said water to this wetland and the relative value of this area as
a wetland is questioned. There is no significant vegetation, stand of
trees, significant size of the wetlands, or significant vistas of eastetic
quality present on this site. We are requesting that mitigation of this
wetland be provided in the form of preservation funding for wetland
areas within or adjacent to the City found to be endangered and in need
of funding to preserve.
5. CURENT PLANNING
a. TREES REQUIRED AS PER CODE — The setback of the building
from the sidewalk was increased as required on the east, west and north
sides of the building. This distance was increased to the depth noted in
the code. Landscaping and tree treatment was added to meet the code
requirement.
b. PARKING LOT LANDSCAPING — The note in the Planning
Objectives noting five percent was a typographic error. It was intended
to note compliance with the six- percent code requirement. This is noted
May 25, 2000
Steve Olt
Senior Planner
City of Ft. Collins
281 N. College Ave
Ft. Collins, CO 80524
RE: MASON STREET MOTEL PDP
Dear Steve;
HATTMAN ASSOCIATES
Architecture & Planning
145 W. Swallow Road * Ft. Collins, CO 80525
970. 223 . 7335 * * * Fax 970. 223 . 0511
I am addressing this to you for it will probably be you or Ted who will assign a
Planner for this project. In a letter that I received from Bob prior to his departure it was
indicated that I would need to submit revisions for this project by June 10 to continue
the process. You may be aware that for some time there has been an impasse regarding
this project and the Storm Drainage Department. Their concerns had to due with the
potential flooding of this site during a 100-year storm occurrence.
After may hours of discussions and many drainage models for the basin being run it
was determined that they would remove the stumbling blocks from their portion of the
review process which was stopping the project from progressing. Since this item has been
resolved we can now submit the revisions to the project. I hope that you find our
responses to your satisfaction. I will be answering the comments that we received on the
project dated March 3, 1998. This report was prepared by Mike Ludwig. I will briefly
state the concern from his letter and how the project now addresses this concern.
US WEST
a. SERVICE - We understand the terms that service will be provided and
that facilities may or may not be available.
b. UTILITY CONSTRUCTION - The owner will provide all conduits,
excavations and cabling as required by the utility to obtain service. This
work will be provided from the pedestal to the interior phone
distribution center.
C. RELOCATION - The owner understands that if existing utility services
need to be relocated that are within an existing easement due to this
plan, then this work will be the responsibility of the owner.
2. POUDRE FIRE AUTHORITY
a. FIRE SUPPRESSION — The building will be equipped with a fully
automatic fire suppression system.
b. FIRE HYDRANTS — Adequate fire flows are available at this location.
The fire hydrants adjacent to the site are shown on the plan. The
building is within the three hundred foot limitation.