HomeMy WebLinkAboutLARIMER COUNTY DETENTION CENTER, FACILITY EXPANSION - SITE PLAN ADVISORY REVIEW - 8-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: I e� Szpati
Engineer:
Traldperabons:
Date: 21--IiF
Items Requested
Site I [and Plat Utility I Drainage Rpt Other Items Required
Engineering X x x x
Redlined Items Being Returned
Site Land Plat Utility I Drainage Rpt Other Items Being Returned
Stormwater
x
x
X
x
Water/Wastewate
x
x
Traffic Operations
Trans. Planning
Translbrt
Ilatural Resources
Park Planning
Other:
We: all reclined items should be returned with the resubmittal/ revisions.