Loading...
HomeMy WebLinkAboutLARIMER COUNTY DETENTION CENTER, FACILITY EXPANSION - SITE PLAN ADVISORY REVIEW - 8-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner: I e� Szpati Engineer: Traldperabons: Date: 21--IiF Items Requested Site I [and Plat Utility I Drainage Rpt Other Items Required Engineering X x x x Redlined Items Being Returned Site Land Plat Utility I Drainage Rpt Other Items Being Returned Stormwater x x X x Water/Wastewate x x Traffic Operations Trans. Planning Translbrt Ilatural Resources Park Planning Other: We: all reclined items should be returned with the resubmittal/ revisions.