Loading...
HomeMy WebLinkAboutUNIVERSITY NATIONAL PLAZA (2020 S. COLLEGE) - PDP/FDP - 4-98 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWITEM: St. Vrain Replat - 2020 S. College Avenue APPLICANT: Mr. and Mrs. Wei-Ke and Lin Mei-Nu Chang c/o Mr. Mitch. Morgan, Veldman-Morgan, Inc. 760 Whalers Way, Bldg. C, Suite 200, Fort Collins, CO. 80525 LAND USE DATA:. Request to subdivide a part of Tract 1, Replat of Block 2 and Lots 1 to 7 Inclusive of Block 1 of the St. Vrain Subdivision into two new lots. The parcel is a total of 40,584 square feet. The new lots would be 13,327 and 27,257 square feet respectively. Parcel is located at 2020 South College Avenue between College and Remington. COMMENTS: 1. The plat should dedicate all applicable easements that are necessary to serve both lots with all utilities. Existing utilities should be located in the field using the field locator service . and then shown on the plat. 2. The City's maps indicate that sanitary sewer for Lot One comes in from Remington Street. An easement should be provided across Lot Two for this sewer line. 3. Should the telephone easement be further described as a cable t.v. easement? How is the site served by T.C.I.? 4. Is the access on the west really from College Avenue or from a frontage road? The plat should clarify. 5. The signature block for the "Secretary of the Planning and Zoning" Board should be changed to "Planning Director." COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES- 281 N.CollegeAve.' P.O. Box580 Fort Collins, CO80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT Coma- .nity Planning and Environmen. Services Current Planning City of Fort Collins Mr. Mitch Morgan Veldman-Morgan, Inc. 760 Whalers Way Bldg. C, Suite 200 Fort Collins, CO 80525 Dear Mitch: For your information, attached is a copy of the Staffs comments concerning the Request to Replat presented before the Conceptual Review Team on November 24, 1997. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. .If you should have any questions regarding these comments or the next steps in the review process, please feel free to. call me at.221-6750. Sincerely, Ted Shepard City Planner TS/vrm cc: Eric Bracke,Streets Department Stormwater Department Project Planner File .281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020' - Stewart & Associates Inc 13034829382 P.01 STEWART&ASSOCIATES Consulting Engineers and Surveyors January 6, 1998 Mr. Ted Shepard City Planner City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Ted, This is regarding the Replat of Part of Tract 1, Replat of Block 2 and Lots 1 to 7 Inclusive of Block 1 of the St. Vrain Subdivision. The following are answers to your comments dated November 24, 1997. 1. A 30.00 foot utility easement across Lot 2 was added. 2. A 30.00 foot utility easement across Lot 2 was added. 3. The telephone easement along the South line of Lot 2 was vacated a long time ago. 4. There was no frontage road ever dedicated. The area West of Lot 1 is paved but it really is not a frontage road. It is all U. S. Highway No. 287 right-of-way. 5. We changed the signature block to "Planning Director". I have included a copy of the revised replat and a copy of the A.L.T.A. Survey which delineates the utilities and improvements. If you have any questions, regarding this plat, please call. Sincerely, Jo"2�,P� fU� Richard A. Rutherford, P.E. & L.S. • A % ty or rrC James H. Stewart and Associates, Inc. 103 S. MeldrU n Street P.O. Box 429 Ft. Collins, CO 80522 970/482-9331 Fax 970/482-9382 Post -it'" brand tax transmittal memo 7671 s of page9 . / h , From _ r+ Co. U Co. M p, fct JJ Dept. IPhone A dZ-y3 i Fax M -Z2.f- i� 00 Fax A