Loading...
HomeMy WebLinkAboutED CARROLL MOTORS LOT EXPANSION - FDP - 5-98B - CORRESPONDENCE -Topic: Utility Number: 129 Created: 4/21 /2003 Field locate, show and label existing gas and electric mains on the eastside of McClelland Drive. Is there sufficient room for irrigation tap and meter pit? See site, landscape and utility plans for other comments. Be sure and return all of your redlined plans when you submit mylars. If you have any questions regarding these issues or any other issues related to this project, please feel frge to call me at (970) 221-6750. Y urs Truly, Tro 6Pla es Cityner Page 3 4/15/3: The variance request for the attached sidewalk is approved. Number: 125 Created: 4/18/2003 Dedicate a permanent utility easement for the fire hydrant by separate document. Topic: Plat Number: 118 Created: 1 /3/2003 113103: From Technical Services: What are the dashed lines in the vicinity map? 4/15/3: Please label the dashed lines in the vicinity map. Number: 126 Created: 4/18/2003 From Technical Services: Boundary and -legal close. Number: 127 Created: 4/18/2003 From Technical Services: The utility, access and drainage easement in McClelland Office Park does not continue to the easement on this plat. Topic: Utility Number: 30 Created: 3/20/2002 312012: All offsite improvements require an easement. All offsite grading requires a temporary construction easement. 9/12/2. Provide a temporary construction easement for tieing into the stormline that's in the adjacent property owner's lot. 12118102: The temporary construction easement provided with the last submittal is being returned. Please resubmit with the appropriate exhibits and signatures. Also, the legal description does not close and may not be described correctly. Please provide an additional temporary construction easement for the newly proposed retaining wall on the north side of the property. 4/15/3: Repeat comment. Please resubmit the RECORDED temporary construction easement along with the appropriate exhibit for the west 10' ft of the National Subdivision to the east. As per the Staff review meeting 4/16/3, it was agreed that a letter from the effected property owners to the north would be all that was required in lieu of the more formal temporary construction easements. The letter should state that they are aware of the construction taking place on their property and agree to allow it to take place. Please call if you have any questions. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 124 Created: 4/17/2003 No more comments. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Plat Number: 128 Created: 4/21 /2003 Provide a copy of the offsite utility easement for the fire hydrant for our review. Page 2 .. STAFF PROJECT REVIEW City of Fort Collins JIM SELL DESIGN, INC. Date: 04/23/2003 C/O MATT BLAKELEY 153 WEST MOUNTAIN AVE FORT COLLINS, CO 80524 Staff has reviewed your submittal for ED CARROLL MOTORS LOT EXPANSION PDP & FINAL COMPLIANCE 5-98B, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Troy Jones Topic: General Number: 130 Created: 4/23/2003 We are ready for mylars. Be sure to label the dashed lines on the vicinity map per Engineering comment 118. Be sure to coordinate with Jim Hoff in the Technical Services office (221-6605) to coordinate what needs to be revised in order for comment 127 to be adequately addressed. Bring in the easement for the fire hydrant (issue 125) and the construction permission letter from the property owners of the property to the north (issue 30) to Susan Joy. Do the field locate requested by Jeff Hill in comment 129, and coordinate resolution of this issue directly with him. MAKE SURE THAT THE MYLARS YOU BRING IN HAVE SOLVED THESE MENTIONED ISSUES, OTHERWISE WE WILL HAVE TO GIVE YOU BACK THE MYLARS TO FIX. See the attached Development Agreement Information sheet from Engineering for you to fill out. Coordinate the development agreement with Susan Joy. Department: Engineering Issue Contact: Susan Joy Topic: General Number' 49 - Created: 3/20/2002 3/20/2. Provide a detached sidewalk additional ROW and 15'utility easements along McClelland. Exact ROW requirements are to be determined in a meeting this Friday. Contact myself at 221-6605 or Tom Reif in Transportation Planning 416-2040. 9/ 1212: Research by the city staff has shown that the this particular lot has already dedicated 50' of ROW in 1978 with the McClelland Special Improvement District. The additional 28'of ROW required to improve McClelland to a minor arterial will be purchased by the city at a later date. However, the project will need to continue to keep those future Improvements in mind when designing the site as they have been. Just a few things that need to be coordinated on the plan sets, however. The plat is currently showing the 50' ROW but the utility plans are showing only 40' The Site/Landscape plans call out 50'but do not scale out as 50. All plan sets will need to be coordinated to show the correct ROW, as well as the existing RR and Ditch Co. ROW and/or easements. The project will still be required to dedicate a 15' utility easement from the back of walk. The project would need to submit a variance request to install attached 8'sidewolks to match the existing attached walks and Engineering would be favorable to granting that request. A Public Access Easement would need to be dedicated on the plat and shown on the plans sets for the area that the sidewalk extends past the existing ROW. This project must also provide the temporary construction easement to do the off -site work on the storm line. Please don hesitate to call if you have any questions. 12118102: The variance request was returned by fox for more information on 12110102. Please resubmit the variance request in accordance with 7.9.4 of LCUASS. Page 1