g. fence will match existing (see attached)
h. trees have been added to the plan
i. landscape screening has been provided.
j. I spoke to Tim Buchanan regarding the species diversity, and he will
allow the Autumn Purple Ash be 26% of the overall diversity.
k. Shrubs beds have been added to provide the necessary screening.
1. noted on the plan.
m. noted on the plan.
n. noted.
o. redlined comments have been addressed.
Please review this information and should you have any questions, give me a call.
Sincerely,
JIM SELL DESIGN Inc.
J. Brad Saucerman
Landscape Architect/Project Manager
encl.
May 12, 1998
Lanrluntx Ambdertarc &Yl maruy
Leanne Harter
Project Planner
City of Fort Collins. Current Planning Department
281 North College Avenue
Fort Collins, Colorado 80522-0580
RE: Ed Carroll Motors - Project Development Plan
Final Site and Landscape Plan
Staff Comments
Dear Leanne:
The attached prints of Ed Carroll Motors Project Development Plan, Final Site and
Landscape Plan, reflect revisions made in accordance with the comments in your letter of
February 19, 1998. Our specific response to each comment is noted below, using
numbering shown on your letter.
1. Zoning Dept.
a. Two handicapped spaces have been provided.
b. Bicycle parking has been provided.
c. Fencing will match the existing fence (see attached photo).
2. Building Inspections - noted
3. Mapping Department - addressed by Stewart and Assoc.
4. Light and Power - noted
5. Engineering Department
a. Utility plans - addressed by Stewart and Assoc.
b. Site Plan - parking dimensions are designed for long term parking
stalls Sec. 3.2.2(L)(3), 8.5' wide and 18' long.
c. Plat - addressed by Stewart and Assoc.
6. Stormwater Utility - addressed by Stewart and Assoc.
7. Water/Wastewater Utility -
8. Advanced Planning Department
a. Shrub beds have been added.
b. redlined comments have been addressed.
9. Current Planning Department
a. The attorney's Certification has been changed.
b. phases have been shown on the plan
c. an alternative compliance is being requested (see attached letter)
d. (see attached documentation) 4
e. noted
f. lighting has been shown on the plan.