HomeMy WebLinkAbout320 MAPLE MIXED-USE - FDP - FDP160032 - CORRESPONDENCE -08/15/2016: Details — Included in the plans is Detail 14 — Standard Interior
Setting for 3/4" and 1" meters. Where are you proposing this? If not proposed,
please remove from the plans.
Department: Zoning
Contact: Ali van Deutekom, 970-416.2743, avandeutekom(a)fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 08/31/2016
08/31/2016: Can you just list the required number of parking spaces for the
TOD so we are clear in the future only 26 spaces were required.
C
08/30/2016: Please remove address from the plans.
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 08/30/2016
08/30/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Comment Number: 7 Comment Originated: 08/30/2016
08/30/2016: There are line over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 08/30/2016
08/30/2016: There are line over text issues. See redlines.
Topic: Plat
Comment Number: 1 Comment Originated: 08/30/2016
08/30/2016: Is the 9.03' Utility Easement along Maple Street supposed to be a
9' Utility Easement?
Topic: Site Plan
Comment Number: 2 Comment Originated: 08/30/2016
08/30/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Department: Water Conservation
Contact: Eric Olson, 970.221-6704, eolsoncDfcgov.com
Topic: General
Comment Number: 1 Comment Originated:
08/29/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell(&fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
08/15/2016: Existing Conditions Plan —please update Note 10 on this page to
indicate abandonment at the main is required.
Comment Number: 2 Comment Originated:
08/15/2016: Utility Plan - The proposed water service needs to be separated
from the sanitary sewer service by a minimum of 10' and should be aligned
perpendicular to the meter vault. Please revise. (repeat comment)
Comment Number: 3 Comment Originated:
08/15/2016: Utility Plan - What is the plan for the existing cable and electric
lines that are shown in conflict with the proposed water meter vault?
Comment Number: 4 Comment Originated:
08/29/2016
08/15/2016
08/15/2016
08/15/2016
08/15/2016
5
vault that will address its maintenance and inspection requirements. I have
drafted up an overall SOP document for the other stormwater systems on the
site and can email that to you for reference if needed.
Comment Number: 11 Comment Originated
09/01/2016: Drainage Plan — Per our recent meetings and discussions on the
matter, our group has determined that we are not going to allow under -building
detention vaults because of concerns related to access, proper maintenance
and the ability to readily identify and fix any performance issues that may occur
to the detention vault over time. From our meeting to discuss this issue with the
design engineers on 9-1-16 it sounded like they were able to determine a
workable solution to the detention requirement and that is to provide some
surface or parking lot detention within the parking area below the podium of the
building. We are ok with that approach moving forward and will require a 3D
easement for the detention pond area here.
Contact: Jesse Schlam, 970-218-2932, ischlam{a�fcgov.com
Topic: Erosion Control
Comment Number: 1
09/01 /2016
Comment Originated: 08/09/2016
08/09/2016: Current Erosion Control Materials Submitted does not meet
requirements. Please submit; Erosion Control Plan (Redlines), Erosion Control
Report (Acceptable updated to match the last revision when EC Plan is OK),
and an Escrow / Security Calculation (Not submitted or at very least was not
distributed to Erosion Control) . If you need clarification concerning the erosion
control section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Contact: Mark Taylor, 970-416-2494, mtaylorofcgov.com
Topic: Floodplain
Comment Number: 8
Comment Originated: 08/18/2016
The Floodplain Modeling Report which we received August 9, is in the queue
with a due date of September 7 (we have a 20 business day review time, which
is independent of Planning Department review schedules). Comments will be
sent directly to the Developer's engineer.
Comment Number: 9
Comment Originated: 08/18/2016
08/18/2016: The Comment Sheet submitted with this review, indicated that
previous comments regarding floodplain notes, floodplain cross -sections,
no -rise certification requirements, etc. would be included in a Floodplain Exhibit
as a part of the Project Utility Drawings. That sheet was not included in the
drawings received in this office, so the previous comments still need to be
addressed.
Department: Technical Services
Contact: Jeff County, 970-221.6588, jcountyC�fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 08/30/2016
08/30/2016: There are line over text issues. See redlines.
Comment Number: 5 Comment Originated: 08/30/2016
4
projects to or above the top of the fence. This can be confirmed by phone and
email.
Comment Number: 2 Comment Originated: 09/02/2016
09/02/2016: Please simplify the west elevation as shown on marked -up plans
and discussed at the meeting, to be more compatible with the traditional
neighborhood setting of Meldrum Street as well as more consistent with staffs
explanation at the Council appeal hearing.
Comment Number: 3 Comment Originated: 09/02/2016
09/02/2016: Call or email to coordinate the content of a new submittal.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224.6065, hmcdowellga fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 08/15/2016
08/15/2016: Storm Plan and Profile — Indicate if the storm outfall from the
detention vault is private or public. Since this appears to be a private line in a
public alley, this needs to be ok'ed by Engineering.
Comment Number: 3
Comment Originated: 08/15/2016
08/15/2016: Storm Plan and Profile —18-inches of separation is required
between the existing water main and the proposed storm pipe. The requirement
is as follows: When a public water main crosses under a
wastewater/stormwater/other non -potable utility pipe, the water main should
maintain 18-inches of vertical clearance. All joints of the
wastewater/stormwater/other non -potable utility within 10 feet of the water main
shall be wrapped with butyl adhesive tape or the piping of the non -potable
system within 10 feet of the water main shall be C900/C905 PVC. If 18-inches
of separation cannot be achieved then a casing shall be installed around the
waterline and extend a minimum of 10 feet beyond each side of the crossing.
Please provide a note on these plans that directs the contractor to verify
separation between the two utilities and that they will be required to install a
casing around the waterline during construction if 18" separation is not met.
Comment Number: 4 Comment Originated: 08/15/2016
08/15/2016: Details � The orifice plate detail should include location
information of the orifice opening so the contractor installs it correctly. Also,
please include a detail of the Landscape Buffer.
Comment Number: 6 Comment Originated: 08/15/2016
08/15/2016: Drainage Exhibit— Please add existing impervious area and
proposed impervious area to this page for stormwater fees.
Comment Number: 7
Comment Originated: 08/15/2016
08/15/2016: Plat - Drainage easements - Like the Uncommon project, we can
address the upper level LID planters through Development Agreement language
that grants the City access for periodic inspection - to the upper levels where
the LID planters are located. Please let me know if this approach is acceptable
to the team.
Comment Number: 10 Comment Originated: 08/29/2016
08/29/2016: Drainage —Please provide an SOP for this underground detention
3
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish(a�fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/31/2016
08/31/2016: Transformer may need to be rotated to open toward the alley.
Electric service standards calls for 8' of clearance in front of the doors of the
transformer. As shown on the plans, it does not meet the clearance requirement
from the wall.
Comment Number: 2 Comment Originated: 08/31/2016
08/31/2016: Where will the CT cabinet and meters be located? They are not
allowed inside the building. Please refer to the Electric Service Standards at
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 3 Comment Originated: 08/31/2016
08/31/2016: A commercial service information form (C-1 form) and a one line
diagram for the commercial meter will need to be completed and submitted to
Light & Power Engineering. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 4
Comment Originated: 08/31/2016
08/3112016: Any relocation or modification to existing electric facilities will be
at the expense of the owner/developer. If Light & Power's existing electric
facilities are to remain within the limits of the project they must be located within
a utility easement.
Comment Number: 5 Comment Originated: 08/31/2016
08/31/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(cDpoudre-fire.org
Topic: General
Comment Number: 1
Comment Originated: 08/12/2016
08/1212016:
The alternative means for meeting Fire Code requirements for Aerial Access
will be discussed at the FDP.
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/30/2016
08/30/2016: Fence design: The intent for the ivy or vines is to soften the effect of
the development for the neighbor to the north, so they need to be on a trellis that
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224.6134 - fax
fcgov. com/developmentreview
September 02, 2016
Craig Russell
Russell + Mills Studios
141 S. College Ave Ste 104
Fort Collins, CO 80524
RE: 320 Maple Mixed -Use, FDP160032, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clark Mapes, at 970-221-6225 or cmapes@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews(cDfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/30/2016
08/30/2016: The public alley driveway should be designed according to
LCUASS Drawing 803 alley standards, not 707.1 high volume private driveway.
Please update this on the plan and in the construction details.
Comment Number: 2 Comment Originated: 08/30/2016
08/30/2016: Please add "320" before "Maple" in the planset title, for clarity.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(Mcgov.com
Topic: Landscape Plans
Comment Number: 8
Comment Originated: 08/28/2016
08/28/2016:
Forestry previously recommended American Sentry Linden which is a narrow
crowned cultivar. On closer review there is enough space for a broader crowned
cultivar of American linden. Let's use Boulevard American Linden as the 4 new
street trees in place of American Sentry.