01/05/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyleCfcgov.com
Topic: General
Comment Number: 6
Comment Originated: 01/06/2016
01/29/2016: Please see Utility Plans for additional minor comments.
01/06/2016: Please see Utility Plans for additional minor comments.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 01/05/2016
02/03/2016: The trash enclosure needs to be of the material of the primary
building, the stone veneer.
Also the elevations need to show the walk-in entrance.
01/05/2016: Please show elevations of the trash/recycling enclosure. This
should include the walk-in access as well as gates.
Comment Number: 5
Comment Originated: 01/05/2016
02/03/2016: Please increase the depth the bike space pads. We have found
that bikes are overhanging into the sidewalk with a the smaller depth.
01/05/2016: Where are the enclosed bicycle spaces? The site plan shows 12
fixed spaces but the table on the cover sheet states there are only 11. (The
required number of spaces is one space per four units. Of this total, no less
than 60% must be enclosed with the balance being in fixed outdoor racks.
Comment Number: 6 Comment Originated: 01/05/2016
01/05/2016: Signs are not approved with the PDP or FP. Signs are reviewed
and approved through separate sign permits.
n
Topic: Construction Drawings
Comment Number: 11 Comment Originated: 01/04/2016
02/03/2016: This has not been completely corrected.
01/04/2016: Please correct the project name as marked. These do not match
the rest of the plans. See redlines.
Comment Number: 14 Comment Originated: 01/04/2016
02/03/2016: This has not been corrected.
01/04/2016: Please provide the Benchmark Statement in the EXACT format
shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX6.
Comment Number: 15 Comment Originated: 01/04/2016
02/03/2016: This has not been corrected.
01/04/2016: All benchmark statements must match on all sheets.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 01/04/2016
02/03/2016: There are line over text issues. See redlines.
01 /04/2016: There are line over text issues. See redlines.
Topic: Lighting Plan
Comment Number: 19 Comment Originated: 02/03/2016
02/03/2016: BEACON PLAN: The plan sheets must be 24"06".
Comment Number: 20
02/03/2016: BEACON PLAN
sheets.
Topic: Site Plan
Comment Number: 1
02/03/2016: No comments.
01/04/2016: No comments.
Comment Originated: 02/03/2016
Please add a sheet title & sheet number to both
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Comment Originated: 01/04/2016
Comment Number: 1
Comment Originated: 12/28/2015
12/28/2015: Noted response to expect erosion control materials (Erosion
Control Escrow Calc, Report and Plan) at time of FDP.
08/24/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
Topic: Construction Drawings
Comment Number: 7
Comment Originated: 01/06/2016
01/29/2016: See redlines.
01/06/2016: Please check and label cross slopes on the northern access drive.
It appears this area may be too flat to drain adequately as designed.
Topic: Drainage Report
Comment Number: 4
Comment Originated: 01/06/2016
01/29/2016: No calculations are included. Please download and use the
standard Urban Drainage spreadsheets available on their website.
01/06/2016: Please include calculations for required volumes for proposed
bio-retention areas based on the area that is draining to each.
Comment Number: 9
Comment Originated: 01/06/2016
01/29/2016: The spreadsheet is included but is not completely filled out.
Please complete the spreadsheet so that it works properly.
01/06/2016: Please add calculations to show the proposed bio-retention areas
are in conformance with Colorado Revised Statute §37-92-602 (8).
Spreadsheets are available upon request.
Topic: General
Comment Number: 10
Comment Originated: 01/06/2016
01/29/2016: Please see redlines for additional minor comments.
01/06/2016: Please see redlines for additional minor comments.
Department: Technical Services
Contact: Jeff County, 970-221-6588, 'county@fcgov.com
Topic: Building Elevations
Comment Number: 5 Comment Originated: 01/04/2016
02/03/2016: The text still looks fuzzy.
01/04/2016: Please clean up the fuzzy around the text. See redlines.
Comment Number: 7 Comment Originated: 01/04/2016
02/03/2016: This has not been corrected.
01/04/2016: Please add a sheet title & sheet number to both sheets. See
redlines.
Il
Comment Number: 6
Comment Originated: 01/08/2016
01/08/2016: The Poudre Fire Authority will need 100 psi of water pressure to
the top floor for the fire sprinkler system. Be sure that the power needed for the
water pump is included in the sizing calculation for the electrical transformer.
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/06/2016
01/06/2016: It is suggested to locate transformer closer to a drivable area.
Right now drawings show transformer located right at 10' of drivable path. It is
recommended to locate a little closer to avoid any possible future damage to
landscaping. Ensure clearance requirements of 8 feet frontal and 3 feet
side/rear of transformer is met.
Comment Number: 2
Comment Originated: 01/06/2016
01/06/2016: New development and system modification charges may apply. A
link to our online electric fee estimator is below.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees/e lectric-developm ent-fee-estimator? id=3
Comment Number: 3
Comment Originated: 01/06/2016
01/06/2016: To provide proper transformer sizing, please provide a one line
diagram and a Commercial Service Form (C-1) form to Light and Power
Engineering. The C-1 form can be found at the link below:
http://zeus.fegov.com/utils-procedures/files/EngWikiMikiPdfs/C/C-1 Form.pdf
Comment Number: 4 Comment Originated:
01/06/2016: Please contact Todd Vedder with Light & Power Engineering
Department if you have any questions at 970.224.6152. Please reference our
Electric Construction, Policies Practices & Procedures to ensure requirements
and policies are met.
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 5 Comment Originated:
01/06/2016: In order for final design to be completed and construction to begin
the following will need to be submitted to Light & Power: Approved plat, site
plan, utility plan, landscape plan, one -line diagram, C-1 form and AutoCAD
drawings for the site plan and utility plan. Invoice must be paid 100% before
construction.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.org
Topic: General
Comment Number: 4
01/03/2016: PARAPET WALL HEIGHT
What is the wall height from roof to top of parapet?
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischiam@fcgov.com
Topic: Erosion Control
01/06/2016
01/06/2016
Comment Originated: 01/03/2016
5
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Home2 suites — project specific concerns:
1. Fire -sprinkler systems are required. A new code amendment effective in
2014 will require a full NFPA-13 sprinkler system and not allow a 13-R system.
2. Bedroom egress windows required below 4th floor for rooms not provided
with 2 exits.
3. All windows above the 1st floor require minimum sill height of 24"
4. Building code and State statute CRS 9-5 requires project provide accessible
units.
5. Upgraded insulation is required for buildings using electric heat or cooling.
6. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min.
if building located within 1000ft to train tracks.
7. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
8. Special combustion safety requirements for natural draft gas appliances.
9. Low VOC interior finishes.
10. The south wall 5ft from property line must be 1-hour with 25% openings max.
Department: Light And Power
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
4
Comment Number: 18 Comment Originated: 02/03/2016
02/03/2016: Staff's comment number 14 regarding needing further information
on the Cube has not been addressed. It appears that the proposed beacon is
an extraneous lighting device that is not integral to the architectural integrity of
the building. As a result, as shown, the Cube violates Section 3.5.3(E)(9).
Consequently, this feature must be modified so that it's more opaque, solid or
deleted entirely.
Comment Number: 19 Comment Originated: 02/03/2016
02/03/2016: The shadow analysis indicates that the property to the north, Texas
Roadhouse, will be significantly impacted by shadowing at 3:00 p.m. during the
90-day timeframe between November 7th and February 7th. Staff is concerned
that Texas Roadhouse may raise objections to this shadowing that may require
the applicant to lower the profile of the building. As part of the second round
submittal, Staff has received a letter of intent from Texas Roadhouse stating
their willingness to enter into a negotiation regarding the granting of a temporary
construction easement. During this negotiation period, staff advises the
applicant pro -actively reach out to Texas Roadhouse to inform them of this
shadowing so that at the time of written notice of the public hearing, last minute
objections that may impact the project are not raised.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 02/02/2016
02/02/2016:
Contact the City Forester for an on -site meeting to review existing trees that will
be removed and confirm mitigation.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhoviand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 01/05/2016
01 /05/2016:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are required to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
t
top of the building for the sole purpose of attracting attention. in essence, the
Cube is an advertising feature. The Cube has no structural or architectural
integration with the building itself.
The Harmony Corridor is the subject to the policies and regulations of the
Harmony Corridor Plan which was adopted in the early 1990's. It is the
southern gateway to our City and, as such, has the strictest urban design
standards in the City. East Harmony Road in Fort Collins is specifically
governed so that it does not become characterized as a typical highway strip
that is found on the entrance into most cities. Our community has held Harmony
Road to high standards for over 20 years and our goal is to continue to hold up
these expectations and standards.
As stated previously, my interpretation is that the Cube violates Section 3.5.3(E)
(9) with regard to extraneous use of illumination on buildings as an
attention -getting device.
If the Cube feature is to continue to be a part of this P.D.P., then staff will
proceed with either of the two options:
1. Recommendation of denial of the P.D.P., or
2. Recommendation of approval, with a condition that the Cube feature be
removed.
Comment Number: 15
Comment Originated: 02/03/2016
02/03/2016: On the Site Plan Cover Sheet under the parking data, please
indicate that the maximum allowable parking is one space per room or 108
spaces.
Comment Number: 16 Comment Originated: 02/03/2016
02/03/2016: On the architectural elevations, staff's first round comment number
9 regarding enhancing the various window treatments was not responded to.
Staff remains concerned that overall, the lack of window details or differentiation
among windows, contributes to excessive uniformity, especially along the north
and south elevations. The first round comment recommended that the upper
floor windows on the two sides be distinguished from the lower floor windows to
break up the repetitive nature of the window pattern. Other techniques to
mitigate excessive repetition are welcome.
Comment Number: 17 Comment Originated: 02/03/2016
02/03/2016: In response to staff's comment number 10, a cornice has been
provided. The comment response letter indicates that this cornice will be 4"
high with a 4" recess across the vertical element along the east elevation. But
the architectural elevation detail also indicates a cornice along the two side
elevations measuring 4" height with a 2" recess. Please be sure that the plans
clearly indicate the cornice treatment per elevation.
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
lcgov. corn/de velopmentreview
February 5, 2016
Ken Merritt
JR ENGINEERING ON BEHALF OF EAST AVENUE DEVELOPMENT LLC
2900 SOUTH COLLEGE AVENUE
Fort Collins, CO 80525
RE: Home2 Suites at Harmony Village, PDP150031, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 9
Comment Originated: 01/06/2016
01/06/2016: (Carried Over) Has any consideration been given to adding
various window details? As shown, the windows contribute to the flatness of the
building and lack depth. Please consider adding trim and detail, sills, lintels,
etc. to the windows to help break up the uniform surfaces. Perhaps the top floor
windows could be enhanced with a slight arch that introduces a new geometric
form. Perhaps the upper level windows can be further recessed allowing for an
upper story overhang.
Comment Number: 14 Comment Originated: 01/06/2016
01/06/2016: (Carried Over) More information is needed regarding the Cube or
the Beacon. Without more detail, it appears that this feature violates the
prohibition on building illumination per Section 3.5.3(E)(9). If found to be
allowed, please provide information about the extent of the illumination such as
the light source, watts, lumens, Kelvin temperature, etc. Staff may need a
sample of the Laminated Frosted Glazing to assess its opacity.
Staff has received an image of an existing facility that features the illuminated
cube. Based on the images, the Cube is illuminated and glowing on all four
sides. I'm still very concerned that the Cube is an illumination device placed on
1