Comment Number: 6 Comment Originated:
04/13/2016: The numbering shows sheet 1 of 2, but there was only one sheet
received for review.
Comment Number: 7 Comment Originated:
04/13/2016: Please change the title to "Lots 3, 4 & 5, Harmony Commons" as
marked.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-68879 mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
04/12/2016: There is signage and potential striping that is needed at the
approach to the public roads from the development (such as stop signs, etc.)
Those are on private property and not under the jurisdiction of the City - but we
often review the information for the applicant. I didn't see that here.
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1
04/13/2016: No comments.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1
04/13/2016: The site plan needs to include a sheet index.
04/13/2016
04/13/2016
04/12/2016
Comment Originated: 04/13/2016
Comment Originated: 04/13/2016
Comment Number: 2 Comment Originated:
04/13/2016: On Lot 3, how will vehicles be restricted from driving onto the dirt
to the west?
Comment Number: 3 Comment Originated:
04/13/2016: Light Fixture DD has an option to be installed inverted, please add
a note that states it will not.
04/13/2016
04/13/2016
11
Comment Number: 16 Comment Originated: 04/13/2016
04/13/2016: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 17 Comment Originated: 04/13/2016
04/13/2016: There are text over text issues. See redlines.
Comment Number: 18 Comment Originated: 04/13/2016
04/13/2016: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
Comment Number: 19 Comment Originated: 04/13/2016
04/13/2016: There are line over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 04/13/2016
04/13/2016: There are line over text issues. See redlines.
Comment Number: 9 Comment Originated: 04/13/2016
04/13/2016: Please change the title to "Lots 3, 4 & 5, Harmony Commons" as
marked.
Topic: Lighting Plan
Comment Number: 12
Comment Originated: 04/13/2016
04/13/2016: Please change the title to "Lots 3, 4 & 5, Harmony Commons" as
marked. Remove the "Site" and "Lot 3, Lot 4 & Lot 5 Harmony Technology Park
Sixth Filing" as marked. See redlines.
Topic: Plat
Comment Number: 1
Comment Originated: 04/13/2016
04/13/2016: Note #6 is the same note. See previous comment.
02/01/2016: Note #6 is not sufficient. Can the Emergency Access Easement
also serve as an Access Easement for Lots 1-4, with extension of EAE(& AE)
across to Lot 1, and other minor modifications?
Comment Number: 2 Comment Originated: 04/13/2016
04/13/2016: All easements must be labeled & locatable. See redlines.
Comment Number: 3
Comment Originated: 04/13/2016
04/13/2016: Board Rule 6.5.4.1 states the PLS must make note of the reason
the corner monument was not accepted. We are not sure your statement is
adequate. See redlines.
Comment Number: 4 Comment Originated: 04/13/2016
04/13/2016: Please add distances as marked. See redlines.
Comment Number: 5
Comment Originated: 04/13/2016
04/13/2016: The area of the Additional ROW To Be Dedicated does not agree
with the Land Use Table. See redlines.
5
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/18/2016
03/18/2016: PRIOR COMMENTS
Prior PFA comments have been addressed. No further.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcqov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated:
03/18/2016
03/18/2016: Erosion Control Report was acceptable. Erosion Control Plans
have redlines that need to be addressed. Erosion Control Escrow will need to
be modified based upon the erosion control plan redlines.
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcqov.com
Topic: General
Comment Number: 2 Comment Originated:
04/13/2016
04/13/2016: Please label all storm sewer public or private.
Comment Number: 3 Comment Originated:
04/13/2016
04/13/2016: The concrete curb edging to support the porous pavers is required
to be 12-inches thick. The thickness can be larger as shown of the porous
paver detail, but is not required.
Comment Number: 4 Comment Originated:
04/13/2016
04/13/2016: Please specify all riprap to be buried with 6-inches of topsoil with
temporary erosion control.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Building Elevations
Comment Number: 10 Comment Originated: 04/13/2016
04/13/2016: There are line over text issues. See redlines.
Comment Number: 11 Comment Originated: 04/13/2016
04/13/2016: Remove the second "Harmony Commons" and "Lot 3, Lot 4 & Lot
5 Harmony Technology Park Sixth Filing" as marked. See redlines.
Topic: Construction Drawings
Comment Number: 14 Comment Originated: 04/13/2016
04/13/2016: All benchmark statements must match on all sheets.
Comment Number: 15 Comment Originated: 04/13/2016
04/13/2016: All reference to easements on the plans must match the
subdivision plat and/or dedication document. See redlines.
4
Department: Forestry
Contact: Tim Buchanan, 970-221-63619
Topic: Landscape Plans
Comment Number: 3
tuchanan@fcgov.com
Comment Originated: 04/13/2016
04/13/2016:
Continued:
Delete these street trees due to possible site visibility conflicts.
Timberwood Drive — first street tree west of the corner
Entry drive to project along Lady Moon — first street tree south of the corner
Entry drive to project along Lady Moon — first street tree north of the corner
02/02/2016:
12/28/2015:
Adjust street tree placement at corners of the entry drives and of public streets
to provide better site distance visibility. Most street trees at these locations are
very close to corners. Shift locations of street trees that will be a problem away
from corners. Show locations of stop signs and place trees 20 feet from stop
signs.
Comment Number: 7
Comment Originated: 04/13/2016
04/13/2016:
Continued:
Please show City street lights or respond if none are present by the site.
02/02/2016:
12/28/2015:
Show location of any street lights and place trees if needed to meet the tree
separation standard in the LUC 3.2.1 K.
Canopy shade trees 40 feet
Ornamental trees 15 feet
Comment Number: 7
Comment Originated: 04/13/2016
04/13/2016:
Continued:
Please provide a response.
02/02/2016:
12/28/2015:
Who will be providing the corridor landscaping along Harmony?
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/15/2016
04/15/2016:
Streetlights will be placed along public streets. A 40 feet separation on both
sides of the light is required between canopy trees and streetlights. A 15 feet
separation on both sides of the light is required between ornamental trees and
streetlights. Please coordinate tree locations with Luke Unruh 416-2724
3
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcqov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated:
04/12/2016: I'm confused with the intention on work within Outlot A. There is
identified grading within Outlot A shown on Sheet 4 but this does not match the
grading shown on the MAVD (Aspen) plans [Sheet C-036]. There appears to be
different berming sizes and heights, between the sets. Given that MAVD's
master set has identified landscaping within Outlot A, I'm perhaps presuming
that the MAVD set is the "controlling" set? If that is the presumption, then I would
think there would be more of Aspen's grading shown within Outlot A and the
grading plan here would shown how the site ties into this, including the grading
behind the Lady Moon right-of-way. If Outlot A is to be regraded by this project,
then should there be corresponding landscape drawings for this project showing
work within Outlot A? Note that work within Outlot A by this project may have
similar concerns brought up with the MAVD plans regarding the irrigation
easement holder.
Comment Number: 2 Comment Originated:
04/12/2016: Note #2 shown on most sheets of the civil plans indicates that all
storm sewer shall be inspected by the City. I'm under the impression that Storm
line 1 & 7 might be the extent of the public storm sewer and the rest could be
private? (Storm sewer lines should be labelled as public or private on the plans
with verification from Stormwater to distinguish any private from public storm
lines.)
Comment Number: 3
04/12/2016
04/12/2016
Comment Originated: 04/12/2016
04/12/2016: Please provide notes regarding the manholes for Storm line 7 to
indicate that the manholes are built to be set outside of the new sidewalk along
Lady Moon.
Topic: Plat
Comment Number: 4
Comment Originated: 04/12/2016
04/12/2016: The plat language doesn't appear to be our latest version in
comparing the Certificate of Dedication statement. Please update to the latest
language (I can email a Word document of this).
Department: Environmental Planning
Contact: Kelly Kimple, 970-416-2401, kkimple@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: Previous comments resolved; no additional comments.
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 -fax
tcgov. com/developmentreview
April 15, 2016
Cathy Mathis
TBGROUP
444 MOUNTAIN AVE
Berthoud, CO 80513
RE: Harmony Commons, FDP160013, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/13/2016
04/13/2016: On the Landscape Plan, behind Building D, in the area formed by
the building, the 80-setback and Lady Moon Drive, there is quite a bit of area
that remains devoid of plants, with the exception of groundcover. Last round,
there were three Spruce and Two Crab in this area. Please add suitable plant
material in this area that addresses this void. The last version of the plan
showed three Baked Spruce and two Crab in this area.
Comment Number: 2 Comment Originated: 04/13/2016
04/13/2016: The Photometric Plan has several fixtures that are difficult to locate
on the plans. Please adjust the graphics and layers so that the plan is more
readable.
Comment Number: 3 Comment Originated: 04/15/2016
04/15/2016: In general, the Photometric Plan should be revised to remove the
light contour per fixture or bring up the font size and line weight of the fixture
designation that are now obscured. The plan needs to be more easily
readable.