Loading...
HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER (FORMERLY LINK-N-GREENS) - PDP - PDP130001 - CORRESPONDENCE - RESPONSE TO APPLICANT5) As part of Phase One, this project is required to obtain FEMA approval of a Conditional Letter of Map Revision (CLOMR) and a Letter of Map Revision (LOMR) in order to update the floodplain maps. 6) A variance to allow hazardous material critical facilities in the 100-year floodplain prior to approval of the LOMR was granted by the Water Board on January 17, 2013. This project is required to comply with all conditions set forth in the floodplain variance. Condition Number One was not approved: 1) A 15 feet wide public access easement shall be provided along the western property boundary to accommodate a future trail connection from Lincoln Avenue to the Poudre River Trail. If you have any questions regarding this action by the Planning and Zoning Board, please feel free to call our office at 221-6750. Sincerely: 4Q0AV--1 Jason Holland, PLA I City Planner Planning Services City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 711 -A City Planning, Development and of ■ Transportation Services Planning Services F6rtCollins North College Ave. P.O.P.Box 580 Fort Collins, CO 80522-0580 970.221.6750 970.224.6134 - fax fcgov. com/currentplanning February 22, 2013 NewMark Merrill Mountain States c/o Allen Ginsborg 2720 Council Tree Ave., Suite 230 Fort Collins, CO 80525 RE: Decision letter for Woodward Link-n-Greens Project Development Plan, PDP #130001 and Modifications of Standard. Dear Allen: On Thursday, February 21, 2013 at a special meeting of the City of Fort Collins Planning and Zoning Board, the Board voted 7 — 0 to approve the Link-n-Greens Project Development Plan, PDP #130001, Modification of Standard to Section 4.20(D)(3)(a)(1) and Modification of Standard to Section 4.20(D)(3)(a)(2), subject to the following conditions: 2) This project shall provide adequate access for emergency vehicles and for those persons rendering fire protection and emergency services by complying with Article 9, Fire Department Access and Water Supply, of the Uniform Fire Code as adopted and amended pursuant to Chapter 9 of the City Code. 3) A horizontal design for the double left turn lane for southbound Lemay Avenue to eastbound Mulberry Street shall be provided (included as a part of the final approved utility plan set) and the right-of-way needed to accommodate this design shall be dedicated on the final plat. The double left turn lane shall be built in conjunction with any phase of the project which triggers the need for the double turn lane based upon the Traffic Impact Study for that phase. If the double left turn lane construction becomes the responsibility of the City the timing shall be at the City's discretion. 4) The final design of the utility infrastructure and any associated easements, other than for Phase 1 for which final design and easements shall be included as a part of the Final Development Plan documents, shall be provided, approved, and accepted concurrent with and prior to the approval of the minor amendment(s) for each additional phase(s), building(s) and/ or prior to the start of any construction work on these items.