HomeMy WebLinkAbout215 MATHEWS OFFICE BUILDING - FDP - FDP160008 - CORRESPONDENCE -Comment Number. 2 Comment Originated: 02/29/2016
02/29/2016: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 02/29/2016
02/29/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 02/09/2016
02/09/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/01/2016
03/01/2016: Ex. Information and Removal Plan: Please add to note 9 that the
existing water service is required to be abandoned at the main.
Comment Number: 2
Comment Originated: 03/01/2016
03/01/2016: Utility Plan: the proposed location of the water meter and curb stop
are shown in the ROW. The water meter and curb stop cannot be located in the
ROW. Please shift it to a location behind the ROW. Within the 9' utility
easement is fine.
Comment Number: 3
Comment Originated: 03/01/2016
03/01/2016: Landscape Plans: Please update Note 8 on sheet LP102 to
include water and sanitary sewer services in the separation requirements.
Comment Number: 4
Comment Originated: 03/01/2016
03/01/2016: Landscape Plans: It doesn't look like you meet the separation
requirements between water services and trees. The requirement is 6'.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 03/01/2016
03/01/2016: The cover sheet on the landscape set is not needed. It is part of
the index on the site. Please remove it from signature block from LP001
5
appear to show access on the subject property. A plan for accessing the south
side of the building is required.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/01/2016
03/01/2016: Drainage Plan: Please provide some additional information for the
swale cross -sections, indicate that the WSEL is for 133%Q, actual depth and
side slopes.
Comment Number: 3 Comment Originated: 03/01/2016
03/01/2016: Drainage Report: Please note that the initial Time of Concentration
equation for Fort Collins is different than the one you're using. Please see the
redlined note in the drainage report for the correct equation.
Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 02/18/2016
02/18/2016: No Comment from Erosion Control. This site; disturbs less than
10,000 sq-ft, is not in a sensitive area, and is not in a larger development under
construction. Therefore, no submittal of erosion control material is needed.
However, the site still must be swept and maintained to prevent dirt, saw
cuttings, concrete wash, trash & debris, landscape materials and other
pollutants from entering the storm sewer at all times or BMPs will be required of
the site. If you need clarification concerning the erosion control section, or if
there are any questions please contact Jesse Schlam 970-218-2932 or email
@ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, ►county@fcqov.com
Topic: Building Elevations
Comment Number: 4
02/29/2016: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 6
03/01/2016: No comments.
Topic: Lighting Plan
Comment Number: 5
Comment Originated: 02/29/2016
Comment Originated: 03/01/2016
Comment Originated: 02/29/2016
02/29/2016: Please remove the notes & text that is also shown on the Site
Plan. See redlines.
Topic: Site Plan
Comment Number: 1 Comment Originated: 02/29/2016
02/29/2016: Some of the titles in the sheet index do not match the titles on the
noted sheets. See redlines.
4
Department: Forestry
Contact: Tim Buchanan, 970-221-6361,
Topic: Landscape Plans
Comment Number: 3
tuchanan@fcpov.com
Comment Originated: 03/04/2016
03/04/2016:
Continued:
Mitigation trees required are 9.0. The project should provide 9 upsized
mitigation trees. Eight are currently shown.
11 /13/2015:
Mitigation tree required are 9.5. The project should provide 10 upsized
mitigation trees.
Comment Number: 5
Comment Originated: 03/04/2016
03/04/2016:
It is unclear what the symbol for Woodward Juniper is? The symbol in the plant
list does not coincide with what is shown on the plan. Review and provide
consistency.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/01/2016
03/01/2016: A Commercial Service Form (C-1) will have to be filled out in
order to properly size the transformer. A link to this document is below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 2
Comment Originated: 03/01/2016
03/01/2016: Please provide a one -line diagram showing transformer up to
billing meter. This is needed to ensure our metering standards are met. A link
to our Electric Construction Policies, Practices and Procedures is below.
Please reference this for our electric standards.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 3
Comment Originated: 03/01/2016
03/01/2016: Please contact Todd Vedder with Light & Power if you have any
questions. 970-224-6152
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, iynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/01/2016
03/01/2016: FIRE ACCESS & GATING
Fire access is required to all portions of the building perimeter. The current plan
set shows a man -gate on the adjoining property to the south but does not
3
Comment Number: 2 Comment Originated:
03/02/2016
03/02/2016: More detail is needed for the Utility Easement behind the ROW.
Show the roof overhang as well as the footer encroachment that extend into the
easement. Provide dimensions.
Comment Number: 3 Comment Originated:
03/02/2016
03/02/2016: A gutter or a pan is needed from the ROW to the back of the
sidewalk chase. A swale cannot directly outlet into the chase.
Comment Number: 4 Comment Originated:
03/02/2016
03/02/2016: Move the curb stop outside the public ROW.
Comment Number: 5 Comment Originated:
03/02/2016
03/02/2016: Spot elevations on Sheet C400 indicate areas on the public
sidewalk do not meet the 2% cross slope needed to meet ADA standards.
Please modify the sidewalks. More sidewalk panels will need to be removed to
the north and south to meet federal ADA standards along the property frontage.
Comment Number: 6 Comment Originated:
03/02/2016
03/02/2016: Create anew detail for the onsite out fall and vertical curb and
gutter. Too many changes were made to the LCUASS drawing.
Comment Number: 7 Comment Originated:
03/02/2016
03/02/2016: See redlines for the pedestrian access ramp detail. Show radius'
at the flow line. Inside radius needs to be 8". The vertical curb needs to
transition to 0" curb to the front of walk. The minimum width of the ramp needs to
be 5', which is the same width as the adjacent sidewalk. Please modify.
Comment Number: 8 Comment Originated:
03/02/2016
03/02/2016: There will be language in the Development Agreement stating that
the concrete at the entry of the building in the public ROW will be maintained by
the Developer.
Comment Number: 9 Comment Originated:
03/02/2016
03/02/2016: Add the following note to the Grading Plan:
"The top of foundation elevations shown are the minimum elevations required
for protection from the 100-year storm"
Comment Number: 10 Comment Originated:
03/02/2016
03/02/2016: Provide finish grade elevations for lot corners to the east.
Comment Number: 11 Comment Originated:
03/02/2016
03/02/2016: Provide water main and sanitary main sizes on the Utility Plans.
Comment Number: 12 Comment Originated:
03/02/2016
03/02/2016: Show manhole locations for sanitary sewer and water lines
Comment Number: 13 Comment Originated:
03/02/2016
03/02/2016: Please send over a cost and quantities estimate sheet to
determine if a DCP will be needed.
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
icgov. com/developmentreview
March 4, 2016
RE: 215 Mathews Office Building, FDP160008, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/02/2016
03/02/2016: Be sure that the plan set includes the under -structure alternative
parking layout that indicates a handicap parking space. Should the need arise
in the future, this alternative layout will be implemented in order to
accommodate a disabled employee on -site versus on the public street. By
including this alternative layout at this time, a Minor Amendment will not be
needed in the future.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 03/02/2016
03/02/2016: Easement by separate documents will be needed for the Utility
Easement, Drainage Easement and the Temporary Construction Easement.
Please see the following link for the easement dedication process:
http✓/www.fcgov.com/engineering/pdf/Easrowdedications2010.pdf. Application:
http://www.fcgov.com/engineering/pdf/TDRF2012applicationform.pdf. General
Deed Template:
http://www.fcgov.com/engineering/pdf/ESMwithAdminAcceptance9l 1 1.doc