Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRIVER SONG WALDORF SCHOOL - PDP - 11-98 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYIproject traffic from each of these developments was then assigned to the roadway system.
I
r
I
I
I
n
I
0
u
Background Traffic Year 2000
The peak hour background traffic for Year 2000 is depicted on Figure 4. As mentioned above this was
developed by factoring existing traffic to account for overall growth in the City of Fort Collins and
adding the traffic from the nearby projects described above.
11
Multimodal Transportation Level of Service ManUal p.20
I_os sta ttl:nds for Development lieview - Bicycle
Figure 7. Bicycle LOS Worksheet `
base connectivity:
specific connections to priority sites:
description of applicable
destination area within 1,320'
including address
1
t�`Iltlul mVtrP.�=vR`1r
t`IAL,
L 2 I
t,rl�:�l
u
destination area
classification
(see text)
level of service - connectivity
mndnnun scwal proposed
C
■M-I
.IMI■I
City of Dort Collins Transportation Master Plan
Multimodal Transportation Level of Service ManUal. P. 18
1.0s stindards for mvelopmew Review - Pedestrian
rigUre, 6. Pedestrian LOS Worksheet
e Hre--t . W �t.hl Oe" A
ro eel local ion classification:
P )
11) eN I �'i l � � 4 u V I vz, V ..
(enter as many as apply)
description of applicable
destination area
level of service (minimum based nn project location classification)
destination area within 1,320'
classification
inclodin address
g
(see text )
�Gmtness
.animdly
armaings
InlrnzlI
aemrlly
amedlira
Q
f 4 �i1 17 p�`lll�.
Rt%11>I
mi,inulm
-
pp��
V
L!
IF
aclmd
C.
G
k C.,
rl'����•'� cl�l
n
Il 111 null llll
aitllal 1/y / • _ / •� — � — / _
®�!1©I�I�AI01
mnimun,
propoxd
�.., _..
City of Fort Collins Transportation Master Plan
I
1
' APPRENDIX B
PEDESTRIAN AND BICYCLE LEVEL OF SERVICE WORKSHEETS
r-
1
II
II
II
1
t
1
1
1
1
1
1
1
HCS:
Unsignalized
Intersections Release 2.1e
OLOOPT.HCO
Page 3
Intersection
Performance
Summary
Flow
Move Shared
Total
51
9e
Queue
Rate
Movement (pcph)
(Ccph) Cap
P P (p----(----veh)
Delay
Length LOS
Approach
Delay
(veh)
(sec/veh)
NB T
NB
NB R
1031 >
-------
-----
---------
-----2.9
18
1385 > 1276
2.9
0.0 A
SB L
SB T
29
6
984 > 994
3.8
0.0 A
1048 >
WB L
12
1714
3.8
2.1
0.0 A
0.6
Intersection Delay
=
2.3 sec/veh
I
1
1
1
t
r
1
1
1
n
HCS: Unsignalized Intersections Release 2.1e OLOOPT.HCO
Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
--------------------------------------------------------
SB
Conflicting Flows: (vph)
Potential Capacity: (pcph)
0
Movement Capacity: (pcph)
1385
Prob. of Queue -Free State:
1385
---------------------
99 0.
0.99
Step 2: LT from Major Street
WE
------------------- -----
EB
Conflicting Flows: Flows: (vph)
Potential Capacity: (pcph)
0
Movement Capacity: (pcph)
1714
Prob. of Queue -Free State:
1714
0 99
099
TH Saturation Flow Rate: (pcphpl)
.
0
RT Saturation Flow Rate: (pcphpl)
Major LT Shared
1700
Lane Prob.
of Queue -Free State:
-------------------
0.99
-------------NB---------
Step 3: TH from Minor Street
__ __
------------------ --------------------------------------
SB
Conflicting Flows: (vph)
Potential Capacity: (pcph)
37
24
Capacity Adjustment Factor
1038
1056
due to Impeding Movements
0.99
Movement Capacity: (pcph)
0.99
Prob. of Queue -Free State :
0
099
48
- - - -- -----------------
..
0
099
Step 4: LT from Minor Street
___________
NB
SB
----------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
34
Major LT, Minor TH
1007
Impedance Factor:
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
0.99
due to Impeding Movements
Movement Capacity: (pcph)
0.98
----------- ---------------------------------------------
984
1
HCS_-Unsignalized-Intersections Release 2.1e
OLOOPT.HCO
Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets (N-S) LOUISE LANE_____________________________________________
Major Street Direction.... EW
(E-W) ORCHARD PLACE
Length of Time Analyzed... 60 (min)
Analyst ...................
RR
Date of Analysis.......... 1/16/98
Other Information.........
TOTAL TRAFFIC
- YEAR 2000
- PM PEAK HOU
Two-waySto R
-------- p-controlled Intersection
Eastbound Westbound Northbound
T R
Southbound
L T R L
-L-- ----
T R
T R
o. Lanes 0 -'--
0 0 0> 0
----
--- - ---- ----
Stop/Yield < 0 0
1< 0
0 > 1 0
Volumes
10
PHF 25
5 15
25 5
Grade .95 •95
.95 .95
.95
MC's OU 0
0
.95
0
SU/RV's (o)
CV's (%)
PCE's 1.10
----------------
1.10 1.10 1.10
1.10
Adjustment Factors
Vehicle
Maneuver
Critical
Follow-u p
-----_ ----------------
Gap (tg)
Time (tf)
Left Turn Major Road
______ _______ -----------------
Right Turn Minor Road
5.50
2.10
Through Traffic Minor Road
5.50
2.60
Left Turn Minor Road
6.50
3.30
7.00
3.40
HCS_-Unsignalized-Intersections
Release 2.1e
OLOOAT.HCO
Page 3
Intersection
Performance
Summary
Flow
Move Shared
Total
9eu
Queue
Rate
Movement p
Movement (pcph)
Cap Ca
(pcph) (pcph)(sec/veh)
Delay
Length LOS
pproach
Approach
Delay
(veh)
(sec/veh)
NB T
77
740 >
-------
------- -----
-----_
NB R
176
1385 > 1095
4.3
1.0 A
4.3
SIB L
SB T
29
88
497 > 665
6.6
0.7 B
748 >
6.6
WB L
198
1714
2.4
0.4 A
2.0
Intersection Delay
=
4.0 sec/veh
0
I
1
[J
1
1
[1
I
I l
HCS: Unsignalized Intersections Release 2.1e OLOOAT.HCO
Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
NB
------------------
SB
SB
------
Conflicting Flows: (vph)
-------------------
Potential Capacity: (pcph)
0
Movement Capacity: (pcph)
1385
Prob. of Queue -Free State:
85
--------------------
0.87
Step 2: LT from Major Street
--
WB
------------------ ------ ------------------
B
Conflicting Flows: (vph)
-------------
Potential Capacity: (pcph)
0
Movement Capacity: (pcph)
1714
Prob. of Queue -Free State:
0.88
TH Saturation Flow Rate: (pcphpl)
0
RT Saturation Flow Rate: (pcphpl)
Major LT Shared
1700
Lane Prob.
of Queue -Free State:
--------------------
0.88
Step 3: TH from Minor Street
_ NB ___________
-----------------
SB
---------------------
Conflicting Flows: (vph)
_________
Potential Capacity: (pcph)
196
188
Capacity Adjustment Factor
838
847 847
due to Impeding Movements
0 88
Movement Capacity: (pc h)
P
0.88
Prob. of Queue -Free State:
740
0.90
748
-----------------------
0.88
------------
Step 4: LT from Minor Street
________
NB
--------------------------
SB
------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
303
Major LT, Minor TH
678
Impedance Factor:
Adjusted Impedance Factor:
0.79
Capacity Adjustment Factor
0.84
due to Impeding Movements
Movement Capacity: (pcph)
.73
097
---------------------------------------------
1
1
1
1
HCS_-Unsignalized-Intersections Release 2.1e
-------
OLOOAT.HCO Page 1
Center For Microcomputers In Transportation
University
of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LOUISE LANE
-_-
Major Street Direction.... EW
(E-W) ORCHARD PLACE
Length of Time Analyzed... 60 (min)
Analyst
................... RR
Date of Analysis.......... 1/16/98
Other Information.........
TOTAL TRAFFIC
- YEAR 2000 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound
T R
L T R L
-L-- ----
T R LSouthbound
R
No. Lanes p ----
Stop/Yield 0> 0 < 0 0
---- _
-T_ ----
1< 0 0, 1
Volumes
0
90
PHF 15
35 80 25 40
Grade .5 .95
.5 5 95 5
MC's (%) 0
0 0
SU/RV's (o)
CV's (0
PCE's 1.10
------------------------------
1.10 1.10 1.10 1.10
Adjustment Factors
Vehicle
Maneuver
Critical
Follow-up
---------------
Gap g
Time tf)
Left Turn Major Road
-----------------
Right Turn Minor Road
5.50
2.10
Through Traffic Minor Road
5.50
2.60
Left Turn Minor Road
6.50
3.30
7.00
3.40
HCS:-Unsignalized-Intersections
Release 2.1e
KOOOPT.HCO
Page 3
Intersection
Performance
Summary
Flow
Move Shared
Total
95%
Queue
Rate
Movement (pcph)
P
Cap Ca
(pcph)----
Delay
(----veh)
Length LOS
pproach
Approach
Delay
Delay
------
----
(veh)
NB
L
29
977 >
-------
-----
_
-----3.7
�
NB
T
R
12
6
1015 > 1024
3.7
0.0 A
1372 >
SB
L
6
977 >
SB
SB
T
R
12
6
1030 > 1079
1351
3.4
0.0 A
3.4
>
EB
WB
L
L
6
6
1646
1696
2.2
0.0 A
0.7
2.1
0.0 A
0.3
Intersection Delay
=
2.1 sec/veh
HCS_-Unsignalized-Intersections Release 2.1e KOOOPT.HCO
Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
_-
------
--------------------------------------------------
NB
Conflicting Flows: ( h)
PotentialSB
Capacity: (pcph)
8
21
Movement Capacity: (pcph)
1372
1351
Prob. of Queue -Free State:
1372
1351
-----------------------------------
1.00
1.00
Step 2: LT from Major Street,
B
----
-------- ---
-- - -
-------------------------------
EB
Conflicting Flows: (vph)
-----'----
Potential Capacity: (pcph)
10
37
Movement Capacity: (pcph)
1696
1646
Prob. of Queue -Free State:
1696
1646
TH Saturation Flow Rate: (pcphpl)
1.00
1700
1.00
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane
1700
1700
1700
Prob.
of Queue -Free State:
--------------------------
1.00
1.00
Step 3: TH from Minor Street___
NB
--------------- --
SB
Conflicting Flows: (vph)
__ ---------------
Potential Capacity: (pcph)
54
41
Capacity Adjustment Factor
1022
1038
due to Impeding Movements
Movement Capacity: (pcph)
0.99
Prob. of Queue -Free State:
1015
1030
030
-----------------------------------
0.99
0.99
Step 4: LT from Minor Street__
NB
------------------------ --
SB
___
Conflicting Flows: (vph)
Potential Capacity: (pcph)
46
46
Major LT, Minor TH
996
996
Impedance Factor:
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
0. 99
0.99
due to Impeding Movements
077
Movement Capacity: (pcph)
0
------------------
9.98
77
CI
I
1
I
I
HCS_-Unsignalized-Intersections Release 2.1e KOOOPT.HCO
------_ - ----- Page 1
Center For Microcomputers fn Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) KIMBALL ROAD
Major Street Direction.... EW (E-W) ORCHARD PLACE
Length of Time Analyzed... 60 (min)
Analyst....... RR
Date of Analysis.......... 1/16/98
Other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
Two-waySto R
p-controlled Intersection
Eastbound Westbound Northbound
Southbound
L T R L T R L T
-- ---- N L T R
No. Lanes - ---N _
--
Stop/Yield 0> 1 < 0 0> 1 < 0 0> 1 < 0
Volumes 5 5 5 5
Grade
0
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
MC's (0-,) 0 0 0
SU/RV's (o)
CV's (s)
PCE's 1.10 110
-------------- .1.10 1.10 1.10 1.10 1.10 1.1.0
-------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
Critical
Follow-up
-----------------------
(tg)
Time (tf)
Left Turn Major Road
-Gap
-------------------
Right Turn Minor Road
5.00
2.10
Through Traffic Minor Road
5.50
2.60
Left Turn Minor Road
6.00
3.30
6.50
3.40
HCS:
Unsignalized
Intersections
Release
2.1e KOOOAT.HCO Page 3
Intersection
Performance
Summary
Avg.
950
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
--------
NB
L
------
198
------ ------
874 >
--------------
-----
---------
NB
T
6
846 > 882
5.4
1.1 B
5.4
NB
R
6
1362 >
SB
L
6
883 >
SB
T
12
933 > 979
3.8
0.0 A
3.8
SB
R
6
1238 >
EB
L
6
1406
2.6
0.0 A
0.6
WB
L
6
1684
2.1
0.0 A
0.1
Intersection Delay
=
2.6 sec/veh
HCS: Unsignalized Intersections
Release 2.1e
KOOOAT.HCO Page 2
'
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
----------------------------
NB-----------SB
-----------
Conflicting Flows: (vph)
14
96
Potential Capacity: (pcph)
1362
1238
'
Movement Capacity: (pcph)
1362
1238
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 2: LT from Major Street
---- --- --- ----- ------
--------------
Conflicting Flows: (vph)
----WB -
16
- -EB
181
Potential Capacity: (pcph)
1684
1406
'
Movement Capacity: (pcph)
1684
1406
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
1700
1700
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
------------------------ ---------------1_00---------1_00
Step
3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
204
122
'
Potential Capacity: (pcph)
853
941
Capacity Adjustment Factor
'
due to Impeding Movements
Movement Capacity: (pcph)
0.99
846
0.99
933
Prob. of Queue -Free State:
--------------------------------------------------------
0.99
0.99
Step 4: LT from Minor Street
----------------------------
SB
----------
Conflicting Flows: (vph)
- -
128
-- -NB
124
Potential Capacity: (pcph)
893
897
Major LT, Minor TH
Impedance Factor:
0.98
0.98
'
Adjusted Impedance Factor:
Capacity Adjustment Factor
0.98
0.99
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
874
883
--------------------------------------------------------
[1
HCS: Unsignalized Intersections Release 2.1e KOOOAT.HCO Page 1
11
I
`_1
1
1
LJ
1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------------------__-----_______________________
Streets: (N-S) KIMBALL ROAD (E-W) ORCHARD PLACE
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... TOTAL TRAFFIC - YEAR 2000 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
-----------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T -R-- L T R I -L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CVIs (°s)
PCEIs
------------
0 > 1 < 0
N
5 10 5
.95 .95 .95
0
1.10
---------------
0 > 1 < 0
N
5 10 85
.95 .95 .5
0
1.10
----------------
0 > 1 < 0
90 5 5
.5 .95 .95
0
1.10 1.10 1.10---------------
Adjustment Factors
0 > 1 < 0
5 10 5
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
----------------------------------------------------------------
Gap(t )
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
[1
r
11
I
11
I
I
1
HCS: Unsignalized Intersections Release 2.1e MLOOPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
132
Potential Capacity:
(pcph)
1187
Movement Capacity:
(pcph)
1187
Prob. of Queue -Free
--------------------------------------------------------
State:
0.98
Step 2: LT from Major
Street
WBEB
Conflicting Flows:
-------------
(vph)
- --- - -
137
Potential Capacity:
(pcph)
1475
Movement Capacity:
(pcph)
1475
Prob. of Queue -Free
State:
0.98
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
--------------------------------------------------------
0.98
Step 4: LT from Minor
--------------------------------------------------------
Street
NB SB
Conflicting Flows:
(vph)
336
Potential Capacity:
(pcph)
676
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance
Factor:
0.98
Capacity Adjustment
Factor
due to Impeding Movements
0.98
Movement Capacity:
-----------------
-----------
664
---------------
Intersection Performance Summary
Avg.
956
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
--------
(pcph)
------
(pcph)
------
(pcph)(sec/veh)
------
-------
(veh)
(sec/veh)
NB L
6
664
>
-------
----- ---------
1021
3.6
0.0
A 3.6
NB R
23
1187
>
WB L
23
1475
2.5
0.0
A 0.3
Intersection Delay
0.4 sec/veh
1
HCS: Unsignalized Intersections Release 2.1e MLOOPT.HCO Page 1
I
I
I
I
I
I
Pi
1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) LOUISE LANE (E-W) MULBERRY STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
-----------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's (o)
CV's (o)
PCE's
------------
0 1 < 0
N
120 10
95 .95
0
---------------
0 > 1 0
N
20 175
.95 .95
0
1.10
----------------
0 > 0 < 0
5 20
.95 .95
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
--------------------------
(tg)
---
Left Turn Major Road
---Gap
5.00
- ---Time-(tf)
-
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
I
L�
I
I
I
I
I
1
I
I
I
I
HCS:-Unsignalized-Intersections Release 2.1e MLOOAT.HCO
Page 2
-------------
---Worksheet for TWSC Intersection
Step 1: RT from Minor Street
------------------ -----------
NB
Conflicting Flows: (vph)
_____ -
Potential Capacity: (pcph)
226
Movement Capacity: (pcph)
1064
Prob. of Queue -Free State:
1064
-------------------------
0.93
Step 2: LT from Major Street
------------------ -----------
WB
EB
____
Conflicting Flows: (vph) -------------
____
Potential Capacity: pcph)
236
Movement Capacity: (pcph)
1323
Prob. of Queue -Free State:
1323
TH Saturation Flow Rate: (pcphpl)
94
0.1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
-----------------------
0.94
Step 4: LT from Minor Street
_ ______
-------------------- -----------
NB
SB
___
Conflicting Flows: (vph)
_ ----______
Potential Capacity: (pcph)
407
Major LT, Minor TH
615
Impedance Factor:
Adjusted Impedance Factor:
0.94
Capacity Adjustment Factor
0.94
due to Impeding Movements
Movement Capacity: (pcph)577
0.94
-------------------------------
Intersection Performance Summary
Flow Move Shared Total
95a
Queue
Rate
Movement (pcph) Cap Ca Delay
(pcph) (pcph-(---/veh)
Length LOS
Approach
pproach
Delay
--- - ______
(veh)
(sec/veh)
NB L -------
22 577 >
----_
---------
NB R 896 4.5
77 1064 >
0.4 A
4.5
WB L 77 1323 2.9
0.1 A
0.7
Intersection Delay =
0.8 sec/veh
I
HCS:-Unsignalized-Intersections Release 2.1e
Center For Microcomputers
MLOOAT.HCO
Page 1
In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LOUISE LANE
Major Street Direction.... EW
(E-W) MULBERRY STREET
'
Length of Time Analyzed... 60 (min)
Analyst..........
.... RR
Date of Analysis..........
1/16/98
Other Information......... TOTAL TRAFFIC -
YEAR
R
2000
- AM PEAK HOU
Two-waySto
----------p-controlled Intersection
-----
Eastbound
L Tbound Westbound NR
Southbound
L T R
I'
T R
L T R
No. Lanes 0 1 < 0 -- -"
Stop/Yield > 1 0 0>
N
0 < 0
p ---
Volumes 205 15 35 105
0 p
PHF .95 .75 5 15
Grade 95 .75
35
0
MC's ($) 0
.5
0
SU/RV's (o)
CV,s (.)
i
PCE's 1.10
-------------------------- 1.10
1.10
Adjustment
Factors
Vehicle
Maneuver
Critical
Follow-up
-
-----------
----- ----- ----- ----
Gap (tg)
Time (tf)
Left Turn Major Road
--------------------
Right Turn Minor Road
5.00
2.10
Through Traffic Minor Road
5.50
2.60
'
Left Turn Minor Road
6.00
3.30
6.50
3.40
I
1
I
I
I
I
H
I
I
I
I
I
HCS: Unsignalized Intersections Release 2.1e EKOOPT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
284
Potential Capacity:
(pcph)
994
Movement Capacity:
(pcph)
994
Prob. of Queue -Free
State:
0.99
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
305
Potential Capacity:
(pcph)
1227
Movement Capacity:
(pcph)
1227
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
526
Potential Capacity:
(pcph)
525
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity_ -(pcph)
- - - - ---- -
522
Intersection Performance Summary
Avg.
950
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
--------
SB L
------
41
------
522
------
>
-------
-------
--------------
556
7.1
0.2
B 7.1
SB R
6
994
>
EB L
6
1227
2.9
0.0
A 0.1
Intersection Delay = 0.5 sec/veh
I
HCS: Unsignalized Intersections Release 2.1e EKOOPT.HCO Page 1
I
r
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... TOTAL TRAFFIC - YEAR 2000 - PM PEAK HOU
R
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
0 > 1 0
N
5 225
.95 .95
0
1.10
---------------
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's (o)
PCE's
------------
0 1 < 0
N
250 40
.95 .95
0
----------------
Adjustment Factors
0 > 0 < 0
35 5
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time-(tf)
---------------------------------------
Left Turn Major Road
5.00
- --
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
I
1
HCS: Unsignalized Intersections Release
2.1e
EKOOAT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street--
NB----
SE
---- --- --- ----- ------ ---- --- -
Conflicting Flows: (vph)
-----
232
Potential Capacity: (pcph)
1056
Movement Capacity: (pcph)
1056
Prob. of Queue -Free State:
0.98
Step 2: LT from Major Street
WE
EB
--------------------------------------------------------
Conflicting Flows: (vph)
317
Potential Capacity: (pcph)
1211
Movement Capacity: (pcph)
1211
Prob. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
0.98
Step 4: LT from Minor Street
NB
SE
--------------------------------------------------------
Conflicting Flows: (vph)
505
Potential Capacity: (pcph)
540
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
0.98
-------------------------- - - -- - - ---
-
- -528
Intersection Performance
Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------ ------ --------------------
SB L 209 528 >
--------------
554 11.1
2.3
C 11.1
SB R 22 1056 >
rEB
L 22 1211 3.0
0.0
A 0.2
r
i
Intersection Delay = 2.2 sec/veh
r
HCS: Unsignalized Intersections Release 2.1e EKOOAT.HCO Page 1
[J
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... TOTAL TRAFFIC - YEAR 2000 - AM PEAK HOU
R
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's M
PCE's
------------
0 > 1 0
N
15 240
.75 .95
0
1.10
---------------
0 1 < 0
N
140 85
.95 .5
0
----------------
0 > 0 < 0
95 15
.5 .75
0
1.10 1.10
---------------
Adjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
(tf)
-----------------------------------------
Left Turn'Major Road
----- ---- -
5.00
-----Time
----
2.10
Right Turn Minor Road
5.50
2.60
'
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
HCS:
Unsignalized
Intersections
Release
2.1e KOOOA.HCO Page 3
Intersection
Performance Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
--------
(pcph)
------
(pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
NB
L
6
------ ------
988 >
--------------
-----
---------
NB
T
6
1040 > 1108
3.3
0.0 A
3.3
NB
R
6
1364 >
SB
L
6
995 >
SB
T
12
1035 > 1091
3.4
0.0 A
3.4
SB
R
6
1372 >
EB
L
6
1696
2.1
0.0 A
0.4
WB
L
6
1675
2.2
0.0 A
0.7
Intersection Delay
=
1.8 sec/veh
HCS: Unsignalized Intersections
Release 2.1e
KOOOA.HCO Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
13
8
Potential Capacity: (pcph)
1364
1372
Movement Capacity: (pcph)
1364
1372
Prob. of Queue -Free State:
1.00
1.00
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
21
10
Potential Capacity: (pcph)
1675
1696
Movement Capacity: (pcph)
1675
1696
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:-- -- -
1.00
1.00
Step 3: TH from Minor Street
-
NB
---1_00
SB
--------------------------------------------------------
Conflicting Flows: (vph)
33
38
Potential Capacity: (pcph)
1048
1042
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
1040
1035
Prob. of Queue -Free State:
0.99
0.99
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
38
36
Potential Capacity: (pcph)
1007
1009
Major LT, Minor TH
Impedance Factor:
0.98
0.99
Adjusted Impedance Factor:
0.99
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.99
Movement Capacity: (pcph)-- -- ---
-------------------------
-----988 --
- - 995
I
HCS: Unsignalized Intersections Release 2.1e KOOOA.HCO Page 1
I
1
r
I
i
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------- --------------------------------------------------------
Streets: (N-S) KIMBALL ROAD (E-W) ORCHARD PLACE
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - AM PEA
K HOUR
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's (I)
PCE's
------------
0 > 1 < 0
N
5 5 15
.95 .95 .95
0
1.10
---------------
0 > 1 < 0
N
5 5 5
.95 .95 .95
0
1.10
----------------
0 > 1 < 0
5 5 5
.95 .95 .95
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
5 10 5
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver - -----
--------------------------
- Gap (tg)
-------------------------
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
J
HCS: Unsignalized Intersections
Release 2.1e MLOOP.HCO Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
-----------
NB-----------SB
------------------------------
Conflicting Flows: (vph)
132
'
Potential Capacity: (pcph)
1187
Movement Capacity: (pcph)
1187
Prob. of Queue -Free State:
0.98
Step 2: LT from Major Street
WE EB
--------------------------------------------------------
Conflicting Flows: (vph)
137
Potential Capacity: (pcph)
1475
Movement Capacity: (pcph)
1475
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB SE
�,
--------------------------------------------------------
Conflicting Flows: (vph)
332
Potential Capacity: (pcph)
680
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
M
Movement Capacity: (pcph)
--------------------------------------------------------
671
Intersection Performance Summary
Avg.
951
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length LOS
Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------
ND L 6
------
671
------
>
-------
------- -----
---------
996
3.7
0.0 A
3.7
NB R 18
1187
>
A
0.2
WE L 18
1475
2.5
0.0
Intersection Delay
=
0.3 sec/veh
I
1
HCS: Unsignalized Intersections Release 2.1e MLOOP.HCO Page 1
I
I
I
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LOUISE LANE (E-W) MULBERRY STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - PM PEA
K HOUR
Two-way Stop -controlled Intersection
Eastbound westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ----
No. Lanes 0 0 0
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (°s)
CV's (%)
PCE's
------------
0 1 < 0
N
120 10
.95 .95
0
---------------
0 > 1 0
N
15 175
.95 .95
0
1.10
----------------
1 Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
----------------
Time (tf)
----
-----------------------------------------
Left Turn Major Road
-----
5.00
2.10
r�
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
J
I
FA
1
HCS: Unsignalized Intersections Release
2.1e MLOOA.HCO
Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
---- ---
NB-- ---- -SB
-------------------------------
Conflicting Flows: (vph)
218
Potential Capacity: (pcph)
1074
Movement Capacity: (pcph)
1074
Prob. of Queue -Free State:
0.98
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
221
Potential Capacity: (pcph)
1345
Movement Capacity: (pcph)
1345
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SE
Conflicting Flows: (vph)
340
Potential Capacity: (pcph)
673
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
'
Movement Capacity: (pcph)
--------------------------------------------------------
667
'
Intersection Performance Summary
Avg.
956
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
-------- ------ ------ -------------
NB L 6 667 >
------- -----
---------
932 4.0
0.0 A
4.0
NB R 18 1074 >
A
0.2
WB L 12 1345 2.7
0.0
Intersection Delay =
0.3 sec/veh
I
L
I
HCS: Unsignalized Intersections Release 2.1e MLOOA.HCO Page 1
I
I
1
I
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LOUISE LANE (E-W) MULBERRY STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - AM PEA
K HOUR
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (%)
SU/RVIs (%)
CV's (%)
PCEIs
0 1 < 0
N
205 5
.95 .95
0
0 > 1 0
N
10 105
.95 .95
0
1.10
0 > 0 < 0
5 15
.95 .95
0
1.10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver----------------------------------(tg)------------Time
Gap
(tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.00
3.30
Left Turn Minor Road
6.50
3.40
I
1
1
1
1
1
[J
1
1
I
1
1
HCS: Unsignalized Intersections Release 2.1e EKOOP.HCO Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
279
Potential Capacity:
(pcph)
1000
Movement Capacity:
(pcph)
1000
Prob. of Queue -Free
State:
0.99
--------------------------------------------------------
Step 2: LT from Major
Street WE
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
295
Potential Capacity:
(pcph)
1240
Movement Capacity:
(pcph)
1240
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
521
Potential Capacity:
(pcph)
529
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
--------------------------------------------------------
(pcph)
526
Intersection Performance Summary
Avg.
950
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
--------
SB L
------
29
------
526
------
>
-------
-------
--------------
573
6.7
0.1
B 6.7
SB R
6
1000
>
EB L
6
1240
2.9
0.0
A 0.1
Intersection Delay = 0.4 sec/veh
1
HCS: Unsignalized Intersections Release 2.1e EKOOP.HCO Page 1
1
1
1
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------------------------------------
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - PM PEA
K HOUR
Two-way Stop -controlled Intersection
--------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R -L-- T R -L-- T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M)
SU/RV's (%)
CV' s ( o )
PCE's
------------
0 > 1 0
N
5 225
.95 .95
0
1.10
---------------
0 1 < 0
N
250 30
.95 .95
0
----------------
Adjustment Factors
0 > 0 < 0
25 5
.95 .95
0
1.10 1.10
---------------
Vehicle
Critical
Follow-up
' Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
1
1
I
1
I
I
[l
1
r
C
1
HCS: Unsignalized Intersections Release 2.1e EKOOA.HCO Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
152
Potential Capacity:
(pcph)
1160
Movement Capacity:
(pcph)
1160
Prob. of Queue -Free
State:
0.99
--------------------------------------------------------
Step 2: LT from Major
Street WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
158
Potential Capacity:
(pcph)
1441
Movement Capacity:
(pcph)
1441
Prob. of Queue -Free
State:
1.00
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor
Street NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
410
Potential Capacity:
(pcph)
613
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance
Factor:
1.00
Capacity Adjustment
Factor
due to Impeding Movements
1.00
Movement Capacity:
-------------------------
(pcph)- - - -- - -- -
--610
Intersection Performance Summary
Avg.
951
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
I(sec/veh)
--------
SB L
------
41
------
610
------
>
-------
-------
--------------
649
6.0
0.1
B 6.0
SB R
6
1160
>
EB L
6
1441
2.5
0.0
A 0.1
Intersection Delay
= 0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1e EKOOA.HCO Page 1
I
1
11
h
I
1
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... BACKGROUND TRAFFIC - YEAR 2000 - AM PEA
K HOUR
Two-way Stop -controlled Intersection
--------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (o)
CV's (%)
PCEIs
------------
0 > 1 0
N
5 240
.95 .95
0
1.10
---------------
0 1 < 0
N
140 10
.95 .95
0
----------------
Adjustment Factors
0 > 0 < 0
35 5
.95 .95
0
1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
1
1
1
1
HCS:
Unsignalized
Intersections
Release 2.1e KO97P.HC0 Page 3
Intersection
Performance
Summary
Avg.
950
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement (pcph)
---
(pcph) (pcph)(sec/veh)
------ ------
(veh)
(sec/veh)
NB
L
14
1018 >
-------
------------
---------
NB
T
12
1065 > 1088
3.4
0.0 A
3.4
NB
R
6
1369 >
SB
L
3
1009 >
SB
T
10
1058 > 1065
3.4
0.0 A
3.4
SB
R
1
1378 >
EB
L
2
1705
2.1
0.0 A
0.2
WB
L
1
1684
2.1
0.0 A
0.4
Intersection
Delay =
2.3 sec/veh
1
11
1
I
1]
1
HCS: Unsignalized Intersections Release 2.1e KO97P.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
----------------------
NB
------------
Conflicting Flows: (vph)
- -----
10
-
4
Potential Capacity: (pcph)
1369
1378
Movement Capacity: (pcph)
1369
1378
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
1.00
Step 2: LT from Major Street
--------------------------------------------------------
WE
EB
Conflicting Flows: (vph)
16
5
Potential Capacity: (pcph)
1684
1705
Movement Capacity: (pcph)
1684
1705
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
-------------------------------------------
1.00
1.00
Step 3: TH from Minor Street
--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
18
24
Potential Capacity: (pcph)
1067
1060
Capacity Adjustment Factor
due to Impeding Movements
1.00
1.00
Movement Capacity: (pcph)
1065
1058
Prob. of Queue -Free State:
----------------------------------------------------
0.99
0.99
Step 4: LT from Minor Street
------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
22
25
Potential Capacity: (pcph)
1028
1024
Major LT, Minor TH
Impedance Factor:
0.99
0.99
Adjusted Impedance Factor:
0.99
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
1018
1009
HCS: Unsignalized Intersections Release 2.1e KO97P.HC0 Page 1
1
1
[1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) KIMBALL ROAD (E-W) ORCHARD PLACE
Major Street Direction...,. EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - PM PE
AK HOUR
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
-L-- T R -L-- T R -L-- T-R--I-L T R
---- ---- ---- ---- ----
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RVIs W
CVIs M.
PCEIs
------------
0 > 1 < 0
N
2 3 12
.95 .95 .95
0
1.10
---------------
0 > 1 < 0
N
1 4 1
.95 .95 .95
0
1.10
---------------
0 > 1 < 0
12 10 5
.95 .95 .95
0
1.10 1.10 1.101
---------------
0 > 1 < 0
3 9 1
.95 .95 .95
0
1.10 1.10 1.10
--------------
'
Adjustment
Factors
Vehicle
Critical
Follow-up
1
Maneuver
--------------------------------------------------
Gap g (t )
Time (tf)
Left Turn Major Road
5.00
2.10
'
Right Turn Minor Road
Through Traffic Minor Road
5.50
6.00
2.60
3.30
Left Turn Minor Road
6.50
3.40
1
1
HCS:
Unsignalized
Intersections
Release
2.1e KO97A.HC0 Page 3
Intersection
Performance Summary
Avg.
95%
Flow
Move Shared
Total
Queue
Approach
Rate
Cap Cap
Delay
Length LOS
Delay
Movement
--------
(pcph)
------
(pcph) (pcph)(sec/veh)
------ ------
(veh)
(sec/veh)
NB
L
4
1018 >
--------------
-----
---------
NB
T
3
1065 > 1167
3.1
0.0 A
3.1
NB
R
6
1367 >
SB
L
1
1020 >
SB
T
10
1055 > 1073
3.4
0.0 A
3.4
SB
R
1
1378 >
EB
L
1
1707
2.1
0.0 A
0.1
WB
L
2
1679
2.1
0.0 A
0.7
Intersection Delay =
1.7 sec/veh
HCS: Unsignalized Intersections
---
Release 2.1e
KO97A.HC0 P
---age--
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
--------------------------------------------------------
NB
SE
Conflicting Flows: (vph)
11
4
Potential Capacity: (pcph)
1367
1378
Movement Capacity: (pcph)
1367
1378
Prob. of Queue -Free State:
, nn
, A
--------------------------------------------------------
' Step 2_-LT-from-Major Street WB EB
Conflicting Flows: (vph)
19
4
'
Potential Capacity: (pcph)
1679
1707
Movement Capacity: (pcph)
1679
1707
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
1700
1700
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
-----Street -------------------
Step
1.00
-------------SB
1.00
3: TH from Minor
-----------------------------------------------------
NB
Conflicting Flows: (vph)
18
26
'
Potential Capacity: (pcph)
1067
1057
Capacity Adjustment Factor
'
due to Impeding Movements
Movement Capacity: (pcph)
1.00
1065
1.00
1055
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
0.99
Step 4: LT from Minor Street
---------------------------------------------------
NB
SB
Conflicting Flows: (vph)
22
22
Potential Capacity: (pcph)
Major LT, Minor TH
1028
1028
Impedance Factor:
0.99
1.00
Adjusted Impedance Factor:
0.99
1.00
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Movement Capacity: (pcph)
1018
1020
------------------------------
--------------------------
I
1
HCS: Unsignalized Intersections Release 2.1e K097A.HC0 Page 1
-------------
I
I
Center For Microcomputers In Transportation __________
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) KIMBALL ROAD (E-W) ORCHARD PLACE
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - AM pE
AK HOUR
Two-way Stop -controlled Intersection
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (0
SU/RV's (o)
CV's (%)
PCE's
------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R I L T R
--- ---- ---- ---- ---- ---- ----
0 > 1 < 0
N
1 3 15
.95 .95 .95
0
1.10
0 > 1 < 0
N
2 3 1
.95 .95 .95
0
1.10
---------------
0 > 1 < 0
4 3 5
.95 .95 .95
0
1.10 1.10 1.10
---------------
Adjustment Factors
0 > 1 < 0
1 9 1
.95 .95 .95
0
1.10 1.10 1.10
--------------
Maneuver
Critical
Follow-u p
-------------------------- --------------
(t )
Gap g
Time (tf)
Left Turn Major Road
--------------------------
5.00
Right Turn Minor Road
5.50
2.10
Through Traffic Minor Road
6.00
2.60
Left Turn Minor Road
6.50
3.30
3.40
HCS: Unsignalized Intersections
Release 2.1e ML97P.HC0 Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
- -----
NB
--- -----------SB
Conflicting Flows: (vph)
105
'
Potential Capacity: (pcph)
1225
Movement Capacity: (pcph)
1225
Prob. of Queue -Free State:
0.99
Step-2:-LT-from-Major-Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
108
'
Potential Capacity: (pcph)
1523
Movement Capacity: (pcph)
1523
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0_99
Step 4: LT from Minor Street
NB
SB
'
--------------------------------------------------------
Conflicting Flows: (vph)
272
Potential Capacity: (pcph)
737
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
728
'
Intersection Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
NB L 2 728 >
1134
3.2 0.0 A
3.2
'
NB R 15 1225 >
WB L 17 1523
2.4 0.0 A
0.2
I
Intersection Delay = 0.3 sec/veh
HCS: Unsignalized Intersections Release 2.1e ML97P.HC0 Page 1
1
I
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) LOUISE LANE (E-W) MULBERRY STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst .................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - PM PE
AK HOUR
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's (%)
SU/RV's (%)
CV's (°s)
PCE's
------------
0 1 < 0
N
97 6
.95 .95
0
---------------
0 > 1 0
N
14 144
.95 .95
0
1.10
----------------
0 > 0 < 0
2 13
.95 .95
0
1.10 1.10
---------------
1 Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
- Gap(tg)
- --Time-(tf)
------------------------------ -
Left Turn Major Road
- --
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
I
1
I
HCS: Unsignalized Intersections Release 2.1e ML97A.HC0 Page 1
I
I
r
1
1
I
1
I
1
i
1
I
1
1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) LOUISE LANE (E-W) MULBERRY STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - AM PE
AK HOUR
Two-way Stop -controlled Intersection
------- -------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's (%)
CV's (o)
PCE's
------------
0 1 < 0
N
179 4
.95 .95
0
---------------
0 > 1 0
N
9 84
.95 .95
0
1.10
----------------
0 > 0 < 0
3 15
.95 .95
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------
- - ---
(tg)
Time (tf)
Left Turn Major
Road
-- --Gap
-------------------------
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1e EK97P.HC0 Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
-------------------------------------------
NB
SB
Conflicting Flows: (vph)
154
Potential Capacity: (pcph)
1157
Movement Capacity: (pcph)
1157
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
Step 2: LT from Major Street
-------------------------------------------
WE
EB
Conflicting Flows: (vph)
169
Potential Capacity: (pcph)
1424
Movement Capacity: (pcph)
1424
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
----------------------------------------
1.00
Step 4: LT from Minor Street
----------------------------------------
NB
SB
Conflicting Flows: (vph)
306
Potential Capacity: (pcph)
0
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
701
Intersection Performance
Summary
Avg.
951
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
-- ------ ------
Length LOS
(veh)
Delay
(sec/veh)
-------
SB L 24 701 >
-------
SB R 2 1157 > 723 5.2
0.0 B
5.2
EB L 6 1424 2.5
0.0 A
0.1
Intersection Delay =
0.4 sec/veh
HCS: Unsignalized Intersections Release 2.1e EK97P.HC0 Page 1
L
I
I
I
I
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------ ===
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - PM PE
AK HOUR
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
L T-
R --I-L-
T R I-L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (°s)
SU/RV's (%)
CVIs (%)
PCEIs
0 > 1 0
N
5 140
.95 .95
0
-1.10
---------------
0 1 < 0
N
131 29
.95 .95
0
0 > 0 < 0
21 2
.95 .95
0
1.10 1.10
'
Adjustment
Factors
Vehicle
Critical
Follow-up
I
Maneuver
----------------------------------------
Gapg (t )
Time (tf)
Left Turn Major Road
-------------------------
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
1
I
1
I
I
I
1
I
i
n
I
L
HCS: Unsignalized Intersections Release 2.1e EK97A.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
94
Potential Capacity: (pcph)
1241
Movement Capacity: (pcph)
1241
Prob. of Queue -Free State:
--------------------------------------------------------
1.00
Step 2: LT from Major Street WB
--------------------------------------------------------
EB
Conflicting Flows: (vph)
97
Potential Capacity: (pcph)
1541
Movement Capacity: (pcph)
1541
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
--------------------------------------------------------
1.00
Step 4: LT from Minor Street NB
--------------------------------------------------------
SB
Conflicting Flows: (vph)
208
Potential Capacity: (pcph)
802
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
-------------------------
801
-
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS Delay
Movement
--------
(pcph)
------
(pcph)
------
(pcph)(sec/veh)
------
-------
(veh)
(sec/veh)
SB L
36
801
>
-------
--------------
830
4.6
0.0
A 4.6
SB R
4
1241
>
EB L
1
1541
2.3
0.0
A 0.0
Intersection Delay
0.7 sec/veh
I
HCS: Unsignalized Intersections Release 2.1e EK97A.HC0 Page 1
I
I
I
I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) KIMBALL ROAD (E-W) ELIZABETH STREET
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... RR
Date of Analysis.......... 1/16/98
Other Information......... EXISTING CONDITIONS - YEAR 1997 - AM PE
AK HOUR
Two-way Stop -controlled Intersection
------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T -R- L T R L T -R-- L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's (%)
CV's (%)
PCE's
------------
0 > 1 0
N
1 107
.95 .95
0
1.10
--------------
0 1 < 0
N
86 6
.95 .95
0
----------------
0 > 0 < 0
31 4
.95 .95
0
1.10 1.10
---------------
fAdjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
--------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
it
I
I
I
1
I
I
APPENDIX C
CRITICAL MOVEMENT ANALYSIS WORKSHEETS
I
r
I
1
I
1
1
1
11
I
I
I
LEVEL OF SERVICE DEFINITIONS FOR
STOP -CONTROLLED INTERSECTIONS
Source: Transportation Research Board, Highway Capacity Manual, Special Report 109, Third
Edition, 1994.
1
I
I
i
1
APPENDIX B
LEVEL OF SERVICE DEFINITIONS
11
r
a
I
TURNING MOVEMENT COUNTS
Intersection: MVL,43,p- LP- ( P— LOv I�i�
Date: 12- • I to • Tj
Day of Week: --,U) Fs�;DACY
Weather:
NUMBER OF VEHICLES
11
©-,M_=l__A®=©®-,
1 1
©,-4
_M-
W-=©©=FM
n
TURNING MOVEMENT COUNTS
Intersection: OkAA-C-D &ggl�l--
Date: 1Z • [to •9-1
Day of Week: 'TUV.: itl4i
Weather:
NUMBER OF VEHICLES
-------------
... „
�s©s00000soo
im ON m m" m m w- no M, an= i s� an no owl -90
TURNING MOVEMENT COUNTS
Intersection:�.1 Iettvt P�Arl.1�
Date: 12 llo a'1
Day of Week: —fl) e-47bAN
Weather:
NUMBER OF VEHICLES
'--;000�000000000
_'
MWlAvMlMWAMMMWAWAMM
I
I
I
APPENDIX A
TRAFFIC COUNT DATA
El
I
i
I
I
I
I
VII. CONCLUSIONS
1
This study assessed the potential impacts of constructing the River Song Waldorf School, a private
' school serving preschool through 8th grade in Fort Collins, Colorado. As a result of the analysis, the
following conclusions were drawn:
The potential impacts of the proposed project were evaluated at the following intersections:
Elizabeth/Kimball, Mulberry/Louise, Orchard/Kimball, and Orchard/Louise.
The traffic impact analyses were performed for existing conditions and the future Year 2000. Future
background traffic conditions without the project and total traffic conditions, with completion of the
proposed project, were evaluated.
Under existing conditions each of the study intersections are currently operating at an acceptable level
of service.
For Year 2000 background and total traffic conditions, the study intersections are projected to operate
at acceptable levels of service.
Pedestrian access to the proposed project is below the City's minimum acceptable standards due to
gaps in the sidewalk system on both Elizabeth and Mulberry Streets. There are no bicycle facilities
available within the immediate study area. The project site is within walking distance of transit stops.
The routes which serve the study area currently do not meet the City's goals for the long range future.
' However, it is anticipated that service would be improved to satisfy these goals in the future.
I
n
n
I
I
23
I
' TRANSIT LEVEL OF SERVICE
The current transit level of service is determined based upon the following: 12 to 16 hours of weekday
service, 30 minute headways, a travel time factor of 2.5, and a peak load factor of greater than 1.2.
Based upon the criteria set forth by the City of Fort Collins, the project site is located within and area
defined as the "remainder of the service area". Currently the level of service is below the City's goal.
' It is anticipated that this level of service will be improved in the future with implementation of the City's
Transit Development Plan. Future transit level of service should be acceptable.
1
1
1
L
I
1
22
TABLE 3
INTERSECTION PEAK HOUR LEVELS OF SERVICE
FUTURE TRAFFIC CONDITIONS - YEAR 2000
Peak Hour Level of Service
Background
Total
AM
7PM
AM
PM
Intersection
Elizabeth/Kimball
(stop -controlled)
SB L/R
B
B
C
B
EBL
A
A
A
A
Overall
A
A
A
A
Mulberry/Louise
(stop -controlled)
NB L/R
A
A
A
A
WBL
A
A
A
A
Overall
A
A
A
A
Kimball/Orchard
(stop -controlled)
NB L/T/R
A
A
B
A
SB L/T/R
A
A
A
A
EBL
A
A
A
A
WBL
A
A
A
A
Overall
A
A
A
A
Orchard/Louise
(stop -controlled)
NB T/R
A
A
SB L/T
B
A
WBL
A
A
Overall
A
A
21
' VII. TRAFFIC IMPACT ANALYSIS
The previous chapter described the development of future traffic forecasts both with and without the
' proposed project. Intersection capacity analyses are conducted in this chapter for both scenarios to
assess the potential impact of the proposed project -generated traffic on the local street system. This
chapter will also assess the pedestrian, bicycle, and transit level of service.
' TRAFFIC ANALYSIS - YEAR 2000
' The peak hour background and total traffic volumes for Year 2000, illustrated on Figures 4 and 7
respectively, were analyzed to determine the intersection delay and corresponding level of service.
Table 3 summarizes these results for Year 2000 background and total traffic conditions.
' As indicated in Table 3, each of the study intersections are projected to operate at an acceptable level
of service under future traffic conditions for Year 2000.
' PEDESTRIAN LEVEL OF SERVICE
The pedestrian activity associated with the proposed school would be related to students, staff, and
faculty whom live close enough to walk. It should be noted that although the proposed project is a
school, because it is a private school, it is anticipated that the only students which would walk, would
' come from the adjacent neighborhoods. The existing neighborhood directly adjacent to the site has
pedestrian facilities although the sidewalks are very narrow (from 2.5 to 3 feet in width). As the
neighborhoods to the south of Elizabeth Street, and west of the project site develop, it is anticipated
that sidewalk connections would be provided. However, students would most likely still encounter
' gaps along Elizabeth and Mulberry Streets.
The pedestrian LOS Worksheet is provided in Appendix D. The minimum level of service for schools
' and transit corridors is B for each category with the exception of Visual Interest & Amenities which
minimum is LOS C. As indicated in the pedestrian LOS worksheet, the minimum acceptable level of
service will not be achieved for several of the categories. This is due primarily to missing links in the
' pedestrian network on both Elizabeth and Mulberry Streets.
BICYCLE LEVEL OF SERVICE
' There are no bicycle facilities on the local streets or on Elizabeth and Mulberry Streets within the study
area. The connections to adjacent residential areas within the study area and within Mulberry Street
to the north and Elizabeth Street to the south are acceptable. Connections to residential areas outside
of this area would be unacceptable due to the lack of bicycle facilities on Elizabeth Street and Mulberry
Street. The bicycle LOS Worksheet is provided in Appendix D.
I
1
20
' 3
c
0
0
m
m
■ � N
f 105/175
A -- 35 20
20 -- r
'10 � \
N
N
M
W
J
W
5
O
J
MULBERRY STREET
u-)
C
v*
o
�o�
�5/5
uU)
-15/25
L LO
4-10/5 ORCHARD
f-90/10
it
+
5/5 PLACE
�
5/5
U-) to
10 5 -�
In
M
8570
rn
�5
AM/PM
Rounded to the Nearest
5 Vehicles.
0
J
J
m
Y
LO
TO
140/2
15/5
240/225 -+-
TOTAL TRAFFIC - YEAR 2000
Figure 7
V. FUTURE TOTAL TRAFFIC PROJECTIONS
The future total traffic projections reflect future traffic conditions with traffic from the proposed River
Song Waldorf School project. The future total traffic projections were developed for Year 2000.
TOTAL TRAFFIC YEAR 2000
The total traffic for Year 2000 was developed by: adding traffic from the proposed project to the
background traffic for Year 2000. The resulting peak hour total traffic projections for Year 2000 are
shown on Figure 7.
18
13/2
r- 26/3 MULBERRY STREET
Z�
N
N
Of
l_ r-91/11 6/1
` 6/1
73/13
po rl Lo
ro
�Slte�
LC/�'11J a
J
J
a
m
Y
N
ELIZABETH STREET 72/8
13/2 --�
AM/PM
ORCHARD
PLACE
SITE -GENERATED TRAFFIC
Figure 6
E
0
0
s
m
MULBERRY STREET 2►
N
TRIP DISTRIBUTION
Figure 5
1
I
LJ
1
1
TRIP DISTRIBUTION
The overall directional distribution of the site -generated traffic was determined based on the location
of the site within the City of Fort Collins. The trip distribution used in the traffic analysis is illustrated
on Figure 5.
TRAFFIC ASSIGNMENT
Traffic assignment is how the generated and distributed trips are expected to be loaded on the roadway
network. The site -generated trip assignments are shown on Figure 6.
15
1
I
I
1
I
r
I
I
I
I
TABLE 2
TRIP GENERATION RATES
Land Use
Daily
Trips/Std
AM Peak Hour
PM Peak Hour
In
Out
Trips/
Stdnt
In
Out
Trips/
Stdnt
Students
2
50%
50%
1
43%
57%
0.14
Staff/Faculty
2
100%
0%
0.60
1 25%
75%
0.16
TABLE 3
ESTIMATED TRIP GENERATION
Land Use
Units
ADT
AM Peak Hour
PM Peak Hour
In
Out
Tot
In
Out
Tot
Waldorf
School
225
Students
400
112
112
224
14
18
32
Waldorf
School
25
Fclty/Staf
50
15
0
15
1
3
4
TOTAL 1
450
127
112
239
15
21
36
14
I
' IV. PROJECT TRAFFIC PROJECTIONS
Development of traffic projections for the proposed River Song Waldorf School involved the following
steps: estimation of trip generation, development of a trip distribution, and assignment of traffic onto
the roadway system.
' PROJECT DESCRIPTION
The River Song Waldorf School is a proposed private school to be located south of Orchard Place at
' Louise Lane. This school will take several years to reach its design for 225 students from preschool
through 8th grade. The school would also have 25 faculty and staff members at full build -out. The
school would operate from 8:30 AM to 3:00 PM for the primary grades (1st through 8th). The
preschool and kindergarten classes would be held between 8:30 AM to 12:30 PM. The school will
have aftercare for students until 6:00 PM.
' TRIP GENERATION
The trip generation estimates for the proposed school were developed based upon trip generation
surveys at the existing River Song Waldorf School. These surveys were performed in 1997 and 1998.
In performing the surveys the number of vehicles entering and exiting the school were documented
during the morning peak hour 7:45 to 8:45 AM and during the evening peak hour of traffic from 4:30
to 5:30 PM. The resulting trip generation rates from the study are provided in Table 2. It should be
noted that the morning peak hour was modified from the standard 7:30 to 8:30 AM because the school
starts at 8:30 AM. In order to account for more of the school traffic the count was performed from
7:45 to 8:45 which accounted for the peak school activity.
These rates were applied to the proposed school in order to estimate the AM and PM peak hour vehicle
trips for the new site. A vehicle trip is defined as a one-way vehicle movement from a point of origin
to a point of destination. The daily trips were estimated based upon the peak hour data and discussions
with school representatives.
' Table 3 provides the projected daily, AM and PM peak hour traffic volumes generated by the proposed
project. As indicated in Table 3, it is anticipated that at full build -out the school will generate
approximately 500 daily trips, 239 morning peak hour, and 36 evening peak hour trips.
1
I
1
13
-105/175
—In �,
5/5
240/225
AM/PM
Rounded to the Nearest
5 Vehicles.
BACKGROUND TRAFFIC - YEAR 2000 Figure 4
III. FUTURE BACKGROUND TRAFFIC PROJECTIONS
In order to properly evaluate the potential impact of the proposed River Song Waldorf School on the
local traffic conditions, future traffic volumes were first estimated for the study area without the
project. These future forecasts reflect the growth that is expected from overall development in the
study area and the City of Fort Collins and from proposed projects within the vicinity of the project site.
' BACKGROUND TRAFFIC YEAR 2000
The growth reflected in Year 2000 Background Traffic is based on two factors: citywide growth and
development, and traffic generated by specific projects located near the study area.
ICitywide Traffic Growth
Based upon recent historical traffic data, it was determined that traffic within the study area has
increased at a rate of approximately 1 .5 percent per year. Assuming a completion date in 2000, the
1997 existing traffic volumes were adjusted upward by 5 percent to reflect this citywide growth.
' Traffic From Nearby Projects
' City of Fort Collins staff provided a list of the projects near the study area which could be completed
within the short term. A description of each of these projects is provided below.
The Scenic.Views residential project located west of the proposed school. Full build -out of this,
' project was assumed for the short range. This development would include 300 dwelling units
of various residential uses and a day care facility. Traffic projections for this project were
obtained from its' traffic impact study. However, they were modified to account for no
vehicular access from Scenic Views onto Orchard Place.
The Lory Ann Estates is a residential project located south of Elizabeth Street and east of
Overland. Some of this project has been completed. It was assumed that the full build -out of
this project would include 30 duplex units.
The Ponds is a proposed residential project located west of Overland Trail at Prospect Road.
It was assumed that the first phase of this project would be completed in the short range and
would include 84 single family homes.
' Sienna is a proposed residential project located south of Elizabeth Street at Rocky Road. This
project would include 116 single family homes.
' The West Plum PUD is a small residential project located off of Plum Street, east of Rocky
Road. This project would include 16 single family homes.
The trip generation for these projects was developed based upon the trip generation rates in the
Institute of Transportation Engineers in their report entitled Trip Generation, 5th edition, 1991. The
1 10
1
I
TRANSIT SERVICE
Transfort currently serves the study area with Routes 2 and 3. Route 2 provides service from Overland
' and Sumac to Elizabeth, into the CSU Transit Center and returns to Overland on Prospect. This route
operates in a clockwise circular route. In the eastbound direction there is a stop on Elizabeth Street
at Rocky Road. Route 3 provides service in essentially the opposite direction from Route 2, this one-
way service starts from Overland at Elizabeth to Prospect, into the CSU Transit Center and returns to
Overland/Elizabeth. Route 3 only operates while CSU is in session Monday through Friday. In the
westbound direction there is a stop at Kimball and Elizabeth. Both of these routes operate with 30
minute headways.
1
1
1
I
i
i
1
1
1
0
i
r
I
I
I
I
I
TABLE 1
INTERSECTION PEAK HOUR LEVELS OF SERVICE
EXISTING TRAFFIC CONDITIONS
Peak Hour Level of
Service
AM
PM
Intersection
Elizabeth/Kimball
(stop -controlled)
SB L/R
A
B
EB L
A
A
Overall
A
A
Mulberry/Louise
(stop -controlled)
NB L/R
A
A
WBL
A
A
Overall
A
A
Kimball/Orchard
(stop -controlled)
A
A
NB L/T/R
A
A
SB L/T/R
A
A
EB L
A
A
WB L Overall
A
A
L-3
r
f 84/144
j- 9 14 MULBERRY STREET
IJ
107/1'40 -
AM/PM
N
EXISTING PEAK HOUR TRAFFIC Figure 3
EXISTING INTERSECTION PEAK HOUR TRAFFIC VOLUMES
Weekday morning and evening peak hour traffic counts were conducted at the following locations:
' Elizabeth/Kimball, Mulberry/Louise, and Kimball/Orchard during December 1997. The existing peak hour
traffic volumes are depicted in Figure 3. The traffic count data sheets are provided in Appendix A.
INTERSECTION LEVEL OF SERVICE METHODOLOGY
Level of service (LOS) is a qualitative measure used to describe the conditions of traffic flow, ranging
from excellent conditions at LOS A to overloaded conditions at LOS F. Level of service definitions are
provided in Appendix B. The City of Fort Collins standard for minimum acceptable Level of Service
depends on the roadway classification and the land use. For this study, intersections along arterial
streets should maintain a LOS D. The intersections within the residential areas should maintain a LOS
C. The Unsignalized Intersection Analysis techniques, as published in the Highway Capacity Manua/
by the Transportation Research Board in 1994, were used to analyze the study intersections for each
of the traffic scenarios. The capacity worksheets are provided in Appendix C. These techniques allow
for the determination of the intersection level of service based on congestion and delay of each traffic
movement.
EXISTING PEAK HOUR LEVELS OF SERVICE
Table 1 summarizes the existing weekday morning and evening peak hour level of service at the study
intersections. Under actual, existing conditions, the study intersections are operating at acceptable
levels of service during the peak hours.
IPEDESTRIAN FACILITIES
I
The availability of pedestrian facilities is provided within the description of each of the roadways.
Overall there are pedestrian facilities within the adjacent neighborhood, however, the sidewalks are
narrow (2.5 to 3 feet in width). There are some pedestrian facilities adjacent to Elizabeth Street
however, the system is not complete. There are no pedestrian facilities adjacent to Mulberry Street
near Louise Lane.
BICYCLE FACILITIES
There are no striped bicycle facilities within the residential streets adjacent to the project site. There
are currently no bicycle facilities on either Elizabeth or Mulberry Streets within the study area.
However, on both of these roadways, there are bicycle lanes to the east of the study area.
0
u
II. EXISTING CONDITIONS
A comprehensive data collection effort was undertaken to develop a detailed description of the existing
conditions within and near the project site. The assessment of conditions relevant to this study include
land use, streets, traffic volumes, operating conditions on the street system, pedestrian system, bicycle
network, and transit service.
EXISTING STREET SYSTEM
The following roadways would provide connections to the proposed project: Elizabeth Street, Mulberry
r Street, Kimball Road, Louise Lane, and Orchard Place. Each of these roadways is described below.
' Elizabeth Street is a two-lane, east/west roadway. Within the study area, Elizabeth varies in roadway
width from a two lane roadway to a three lane roadway west of Kimball Road. The three lane section
accommodates two travel lanes, one in each direction, and a center left -turn lane. The speed limit is
posted at 30 mph. The presence of sidewalks adjacent to Elizabeth varies. West of Kimball there are
no sidewalks on either side of the roadway up to Tierra Lane. West of Tierra Lane there are sidewalks
on the south side only. East of Kimball there are sidewalks on the north side to Rocky Road and then
east of Rocky road there are no sidewalks on the north side. There is a development occurring on the
south side of Elizabeth which will build sidewalks adjacent to Elizabeth Street east of Kimball. There
are no bike lanes or designated routes within the study area. East of Ponderosa Drive there are bike
lanes on both sides of Elizabeth Street. The intersection of Elizabeth Street and Kimball Road is stop -
controlled for Kimball.
Mulberry Street is a east/west two lane roadway near Louise Lane. To the east of Louise Lane,
Mulberry Street is widened to a four lane roadway with sidewalks and bike lanes on both sides of the
rroadway. Near Louise Lane there are no sidewalks or bicycle facilities. The speed limit is posted at
30 mph. The intersection of Louise Lane at Mulberry Street is stop -controlled for Louise
Kimball Road is a two-lane north/south local residential street. There are narrow sidewalks of
approximately 3 feet in width south of Orchard. Parking is allowed on both sides of the street. The
speed limit is posted at 25 mph. The intersection of Kimball Road at Orchard Place is stop -controlled
for Kimball. North of Orchard Place, Kimball curves to the west and is striped with a center line double
yellow and a 15 mph curve warning sign.
Louise Lane is a two-lane north/south local residential street. There is a narrow sidewalk on both sides
of the street (approximately 2.5 feet wide). Parking is allowed on both sides of the street. The
intersection of Louise Lane and Orchard Place is not currently controlled with traffic control devices.
This intersection is essentially a two legged intersection with a north leg and an east leg because
�. Orchard Place only exists for a very short section to the west of Louise Lane.
Orchard Place is a two-lane east/west residential street. As mentioned above it currently ends just to
the west of Louise Lane. East of the study area, Orchard place ends at Ponderosa Drive where the only
connections further to the east are for pedestrians and bicyclists. There are currently no posted speed
limit signs on Orchard Place. There are narrow sidewalks on both sides of Orchard Place.
5
I
0 The City of Fort Collins identified the following intersections to be analyzed for the traffic scenarios:
I�
i
I
S
I
I
1. Elizabeth Street and Kimball Road
2. Mulberry Street and Louise Lane
3. Kimball Road and Orchard Place
4. Orchard Place and Louise Lane
ORGANIZATION OF REPORT
The remainder of this report is divided into six parts. Chapter II presents and analysis of the existing
street system, traffic conditions for each of the study intersections, assessment of the existing
pedestrian and bicycle system, and transit service. Forecasts of future background traffic for Year
2000 are provided in Chapter III. Traffic projections for the proposed project are discussed in Chapter
IV. Chapter V presents the total traffic projections for Year 2000. The future intersection operating
conditions, pedestrian system, bicycle network, and transit service are presented in Chapter VI. The
conclusions of the transportation impact study are provided in Chapter VII.
4
O
O
Of
EMS&V Waft Alm Vdw
,-PWOwd 51md pammf
aysfrq Fie midalf 5w 5tred 6� 5whm x0o
EAistT TC430we Pedmtd
dDIS
Wl I I I I
............. .. * ..........
EAbbhg 6id Of Pavwnd OUNMRAOF
�C� wre pi!� To li klemVed l+S" Ed3&q Eoo
ot
. . .............. .. . ...... ...... .
.. ......... . .....
...... .. .
d,
m7vad qq 224 w
2wxin
.... .... .. .
-b�shh; Fa.
Rarm
Prqvwd 6
11
�S F�
:777777777777777
BLW3
Laxbc*e
VIDG4
Roajdad A
v a,
rRis Aw
A!krwv 14
(-ve 6ro&
away P,
ExNV Pbnd
be axb%d
&a*)g w
amV� Pkn
SITE PLAN Figure 2
r
1
1
i
I
r
/N1
VINE
DRIVE
HIM
Project
Site
MEN
MEN
rd
Ilu-�
1 "=2000'
1 SITE LOCATION
Figure 1
1
rI. INTRODUCTION
r
This report documents the findings of a traffic study conducted to evaluate the potential transportation
impacts and circulation needs of the proposed River Song Waldorf School in Fort Collins, Colorado.
PROJECT DESCRIPTION
The River Song Waldorf School is a proposed private school to be located south of Orchard Place at
Louise Lane. The site location is shown on Figure 1. This school will take several years to reach its
design for 225 students from preschool through 8th grade.
A detailed site plan is provided on Figure 2. Access to the site would be from Orchard Place at Louise
Lane.
For purposes of the transportation study it is was assumed that the school would be at 225 students
by the Year 2000. However, it is recognized that this is a very aggressive schedule and most likely the
school will not achieve its full build -out until several years after Year 2000.
rSTUDY SCOPE
The scope for this study was developed in conjunction with the City of Fort Collins traffic engineering
and planning staff. The base assumptions, technical methodologies and geographic coverage of the
study were all identified as part of the study approach.
The study is directed at the analysis of potential project -generated traffic impacts along the existing and
future street system. As directed by the above mentioned City departments, the following traffic
scenarios are analyzed in the study:
Existing Conditions - The analysis of existing traffic conditions is intended to provide
a basis for the remainder of the study. The existing conditions analysis includes an
assessment of traffic volumes and operating conditions at the study intersections,
determination of the existing pedestrian and bicycle facilities, and levels of existing
r, transit service.
Background Traffic - Year 2000 - Future traffic conditions will be projected for Year
2000. The objective of this phase of the analysis is to project future traffic growth and
operating conditions which could be expected to result from regional growth and from
related projects in the vicinity of the project site.
Project Generated Traffic - The traffic generated by the proposed project will be
determined.
Total Traffic - Year 2000 - This is an analysis of future traffic conditions with traffic
expected to be generated by the proposed project added to the Background Traffic
forecasts. The impacts of the proposed project on future traffic operating conditions
' can then be identified. The pedestrian, bicycle, and transit network will also be
evaluated.
1
I
RIVER SONG WALDORF SCHOOL
Fort Collins, Colorado
Traffic Impact Study
February, 1998
Prepared for:
RIVER SONG WALDORF SCHOOL
P. 0. Box 8055
Fort Collins, Colorado 80526
Prepared by:
RUTH ROLLINS, P.E.
430 East Elizabeth Street
Fort Collins, Colorado 80524
(970) 416-0410
Ref:9802
I
River Song Waldorf School
Fort Collins, Colorado
Traffic Impact Study
Ruth Rollins, P.E.