Loading...
HomeMy WebLinkAboutPOUDRE SCHOOL DISTRICT, PUTNAM ELEMENTARY - SITE PLAN ADVISORY REVIEW - 19-98 - CORRESPONDENCE - REVISIONSRMB Arehit one. • 315 East Mountain • Suite 100 • Fort Collins, CO b -2913 • (970) 484-0117 • Fax (970) 484-0264 Architecture Planning Interior Design RB+B May 15, 1998 Ted Shepard, Senior Planner City of Fort Collins community Planning and Environmental Services 281 N. College Ave. Fort Collins, CO 80522 Re: Putnam Elementary Expansion and Remodel Dear Mr. Shepard: MAY 18 RECII Thank you for reviewing our project. We have perused the review comments of the Staff in your letter of May 7, and have responded as follows: 1) A Drainage Improvement Plan was submitted on May 1, 1998, directly to Stormwater for their review and approval. 2) Plans for curb and gutter improvements should be completed later this week by Lidstone & Anderson, Inc. 3) Asphalt repairs details are shown on sheet 1.3. 4 & 5) Utilities are shown on sheet 1.1. Property lines and known easements are indicated. 6) Clearances for the transformer and generator are shown on detail D1, sheet 1.3. 7) After meeting personally with Ron Gonzales, we have added fire -lane striping, signs and markings per his requests. Re: sheet 1.2. 8) Ron Gonzales has reviewed the fire alarm shop drawings. 9) The crosswalk across the driveway entrance to the new parking lot will be re -striped. Re: sheet 1.2. 10) New hike racks will be provided by the School District, and will be located along the east fence, adjacent the new parking lot. Re: sheet 1.2. 11) Handicapped parking stalls have ramps or at -grade access to the building. Re: sheet 1.2. 12) "Cherry Street' appears on sheets 1.1 & 1.2. We hope that this will satisfy all the requirements of the Staff, and that the approval process will proceed smoothly through the Planning and Zoning Board. Please feel free to contact us if you have any questions. Thank you. Sincerely, Cor radl Senio oc' cc: Bill Franzen, PSD Greg Koch, L & A