Loading...
HomeMy WebLinkAboutWILL SUBDIVISION, 742 - 746 N. COLLEGE - PDP/FDP - 20-98 - CORRESPONDENCE - REVISIONSThe modifications stated for the street right-of-way are no longer requested by the City staff. Work is underway to provide Mike Dean of the City's Engineering Department the proper documentation to escrow funds for the construction of the bicycle lane at a future date. c. The red -lined comments on the Site and Landscaping Plan pertain to item 2b and therefor no changes were made. 3. WatedWastewater Department: a. A minimum of 5 feet will be maintained between the existing water main and the proposed inlet structure. b. The returned Site and Landscaping Plan has no changes red -lined, and therefore none were made. 4. Stormwater Utility: Work is underway at Shear Engineering to include floodplain requirements in the drainage report. The revised drainage report will be submitted under a separate cover letter. A floodplain-use permit has been submitted to and approved by Marsha Hilmes, the Citys Floodplain Administrator. 5. En 'n�a eering Department: a. Work is underway at Shear Engineering to detail the saw cut and patching in North College Avenue for the construction of a new curb and gutter. This information will be submitted under a separate cover letter. The modifications stated for the street right-of-way are no longer requested by the City staff. Work is underway to provide Mike Dean of the City's Engineering Department the proper documentation to escrow funds for,the construction of the bicycle lane at a future date. c. The comment concerning relocation of the existing fire hydrant no longer applies because the curb and gutter will not be moved from the previously planned location. d. Work is underway at Shear Engineering to incorporate the changes noted on the red -line plans. The revised plans will be submitted under a separate cover letter. Should you have any questions or comments concerning the responses presented above, please contact Ted Zibell at 224-1161. ••: PDP Review Document Current Planning Department City of Fort Collins 281 N. College Avenue Fort Collins, CO 80524 RE: Will Subdivision 742-746 N. College Avenue Project Development Plan This document is a -response to the comments presented in the June 26, 1998 letter from the City's Current Planning Department concerning the above mentioned project. Submitted with this document to4he City's Current Planning Department are the associated revised Site and Landscaping Plan and revised Building Elevation Plan. This information is being provided to support approval of the project at the planned Administrative Hearing scheduled for at 3:30 p.m. on Tuesday, July 14, 1998. If information is needed in addition to what has been provided, please contact Ted Zibell as soon as possible at 224-1161. 1. Zoning Department: a. The westernmost parking space of the three located at the southeast comer of the building has been designated on the revised Site and Landscaping Plan as a compact car space and will be signed as such. b. It has been noted that the front roof is not a mansard roof and that no signage can be placed upon it without a variance from the Zoning Board of Appeals._ c. The proposed colors of the stucco facade and roofing materials has been labeled on the revised Building elevation Plan. d. The fifth street tree has been labeled as a Marshall's Ash on the revised Site and Landscaping Plan. e. The proposed building use as a retail establishment has been stated on the revised Site and Landscaping Plan. 2. Transportation DeREAMent: The Site and Landscaping Plan shows that the south access point from North College Avenue has been closed, shows that the sidewalk has been extended with respect to earlier plans, and shows the location of bicycle parking.