14. A submittal must include a Drainage Report, Grading and Drainage Plan, and Erosion
Control Plan. Water quality may be an issue as the City is in the process of adopting
water quality regulations. In this case,, the detention pond may be enhanced to provide
water quality features. For further information regarding stormwater issues, please
contact Glen Schlueter, 221-6589.
15. The yard area should be screened as a buffer for the surrounding residential area.
16. Snead Drive has been planned to extend south for a connection to Fossil Creek Parkway.,
This street will act as a recirculator for the area south of Harmony, north of Fossil Creek,
and east of College Avenue.
with an automatic fire extinguishing system or be divided into areas of fire containment
that contain less than 5,060 square feet. Please be aware that there is a new model energy
code for commercial buildings that has been in place for about one year. For further
information, please contact Mike Gebo, 221-6760.
6. The Poudre Fire Authority will classify the building as "Type 5W' This will require water
pressure of 2,000 gallons per minute at the hydrants. Two fire hydrants may be needed.
One hydrant must be within 600 feet of the building and one within 300 feet. For further
information, please contact Roger Frasco, 221-6570.
7. A traffic impact study will be required. In addition to analyzing the level of service for
vehicles, the study must also analyze the levels of service for bicycles, pedestrians and
transit. Please refer to the handout_ regarding the traffic impact study. For further
information on the scope of the traffic impact study, please contact Eric Bracke, 221-
6630.
8. The Street Oversizing Fee for general office is $14,583 per acre. This fee may be
modified in the near future by City Council to where the fee is based on trip generation
rates rather than broad land use classifications. For further information, please call Matt
Baker, 221-6605.
9. The submittal for a Project Development Plan must include a Utility Plan set meeting the
submittal requirements. A Development Agreement between the developer and the City
regarding construction of public improvements must be entered into prior to recording
final documents. For further information, please contact Shen Wamhoff, 221-6750.
10. . The site is located in the Fossil Creek Drainage Basin. The storm drainage fee in this
basin $2,274 per acre subject to the runoff coefficient.
11. Basically, storm drainage in the general vicinity is inadequate and several nearby properties
are subject to flooding Onsite stormwater detention may be required due to the limitations
on stormwater capacity of the existing downstream facilities. It is recommended that
storm flows not be routed down the hill past the lots on Fossil Ridge Drive. Rather, storm
flows should be routed to the west for conveyance down the future Snead Drive extended
alignment. This may involve grading the site accordingly.
12. Please be aware that groundwater is a problem in the area due to the hillside. You are
cautioned to install the necessary facilities to address groundwater issues.
13. Please be aware that there are irrigation laterals and a pond in the general -area.
Development of the subject property have an impact on these existing water features.
You are advised to contact the owners of these features as early in the process as possible
to address possible mitigation issues.
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE:. August 25, 1997
ITEM: New Office Building for Fort Collins -Loveland Water District and
South Fort Collins Sanitation District
APPLICANT: Mr. Mike DiTullio, Fort Collins -Loveland Water District. and South
Fort Collins Sanitation. District c/o Mr. Stuart MacMillan, Everitt
Company, 3000 South College.Avenue, Fort Collins, CO. 80525.
LAND USE DATA: Request for a 7,000 square foot office building and outside yard
area located at the southern end of existing Snead Drive and west
of Fossil Ridge Drive, behind the Fort Collins Design Center.
COMMENTS:
The site is located in two zoning districts, C, Commercial, and R-L, Low Density
Residential. In order to build an office building, the entire site must be rezoned into the C,
Commercial zone. An office building is a permitted use in the Commercial zone, subject
to Administrative Review. A rezoning process must be considered by the Planning and
Zoning Board and two readings by City Council.
2. Please refer to Article Three, Division Five, "Building Standards" of the Land Use Code.
A building entrance will have to be placed on Snead Drive with a direct pedestrian
connection from the public sidewalk to the front entry.
3. Also, please note under Article Three, Division Two, that the number of parking stalls for
a general office land use is 3.0 spaces per 1,000 square feet of floor area. In_the event that
on -street or shared parking is not available on land adjacent to the office, then the
maximum parking allowed maybe increased by 20%, provided that the amount of parking
lot landscaping is also increased by 20%.
4. The site can be provided electricity from an existing vault on the west side of Snead Drive.
A Commercial One ("C-1 ") form must be completed by the electrical contractor to
determine entrance capacity and panel size. Normal development charges will apply. The
location of the transformer must be coordinated with Light and Power. The transformer
must be within ten feet of hard surface and be screened from public view by landscaping or
an enclosure. For further information, please contact Monica Moore, 221-6700.
5. The building will be reviewed by the 1991 Uniform Building Code. The City will adopt
the 1997 U.B.C. in about one year. A 7,000 square foot building will need to be equipped
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT
Com_ anity Planning and Environmer. Services
Current Planning
City of Fort Collins
Mr. Stuart MacMillan
Everitt Companies
3000 South College Avenue
Fort Collins, CO 80525
Dear Stuart:
August 25, 1997
For your information, attached is a copy of the Staffs comments concerning the New
Office Building for Fort Collins -Loveland Water District presented before the
Conceptual Review Team on August 25, 1.997.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
City Planner
TS/vrm
cc: Eric Bracke, Streets Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580. • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020