HomeMy WebLinkAboutFORT COLLINS LOVELAND WATER DISTRICT - PDP - 23-98 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: rp,cE ,e"G .
Planner: r Traffic Operations: ",c
Engineer: Al ye ('-
Date: /a -e —98
Items Requested
Site I land Plat I Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
X
Stormwater
yC
Water/Wastewater
Tralfic Operations
x
X
Trans. Planning
Transfort
Natural Resources
Park Planning
ire L-WO
Totals
y
y
3
3
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routing Sheet `3
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
I
m
IN
IN
IN
mmm
ZEN
INN
IN
MININ
BUILDING I
N
INm----..-
IN
m
MAPPINGINN
DRAFTING
-,�.._---.--.-
�
/
-.
-
-.
IN
IN
a
IN
IN
m
IN
NNW
IN
m
IN
ADVANCEFri
INm
IN
--m
INN
IN
R.O.W.
.-..-.----.-
CONSERVATION
m
MINN
IN
POST OFFICE
MINNm
MINN!
IN
m
SCHOOLS: I 1'E / THOMPSON
mIN
.-.-.mm
m
IN
STATE HIGHWAY DEPARTMENT
mmmmmMIN
DITCH COMPANY....
-.----.--
RAILROAD: or
---.-.----.--
.-.-.--.--..-
-..--.--.
WNW
-
-...-.---
WNW
-
..-
MINN
----.-m
-
WIN
IN
WIN
ml
mom
IN
m
.------------